HearingExamination By AuthorityView order Proceedings
Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the project. Sh. Ashok Kumar Gupta (Director), Sh. Sachin Jain, Sh. Rishabh Jain (Advocate) are present on behalf of the promoter and stated that they want to take the registration of the tower Q only as OC has been obtained for rest of the area. As per the approved layout plan, it is found that, a tower Q has been added and location of STP, Electric sub-station has also been changed and green area has also changed. As some area of tower Q is already registered with the Authority vide RC no. 50 of 2022 dated 13.06.2022 valid up to 31.12.2024., so the amendment in the existing registration is to be required and 2/3rd consent of the existing allottees is also required as the building plans has been revised and a public notice for inviting objections should also be made for information of all concerned allottees and deficiencies be issued to the applicant promoter which is yet to be conveyed. The matter to come up on 20.11.2023.
Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the project. No reply has been submitted by the promoter company against the deficiencies conveyed by the authority through notice dated 16.11.2023. Therefore, in view of the same the matter is adjourned, and the next date of hearing will be conveyed after submission of reply of deficiencies already conveyed through deficiency notice. Further, if no response is received from the promoter within next 4 week’s time, in that case the concerned official to put up the matter on file for issuance of show cause notice as to why their application for registration of project may not be rejected following the due procedure under the Act of 2016.
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the project. Sh. Sachin Jain (Director) is present on behalf of the promoter and stated that this is a case of low-cost affordable housing and non-encumbrance certificate from tehsildar will be submitted today in the registry of the Authority and regarding late fees, they had submitted a representation to waive off the late fees, as DGTCP, Haryana had accorded the approval dated 03.03.2021 to consider the period from 01.11.2017 to 30.09.2020 as “Zero period” based on the directions of the Hon’ble High Court of India. As this is the exceptional case of low-cost affordable housing and DTCP has already allowed “Zero period” from 01.11.2017 to 30.09.2020, so in view of the above, the Authority has decided to consider the “Zero Period” from 01.11.2017 to 30.09.2020 and the promoter is directed to submit the remaining deficit late fees amounting Rs. 14,29,938/- as the promoter had applied in the Authority on 05.11.2020 and promoter is also directed to submit the non-encumbrance certificate and the BG/DD amounting Rs 25 Lakh each as a security amount for revised fire scheme approval and revised approved service plans and estimates within 15 days. Approved as proposed and the RC shall be issued after compliance of all the conditions and corrections in the DPI and A to H.
Registration grantedGGM/763/495/2023/107
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Licence
69 of 2010 dated 11 September, 2010
FAR permissible / proposed
175 / 175
Estimated project cost
₹ 22.32 Cr
Cost of land
₹ 2.25 Cr
Cost of construction
₹ 14.64 Cr
Infrastructure and other structures
₹ 1.12 Cr
EDC, taxes, levies and other costs
₹ 4.3 Cr
How the land will be used
Use
Area (as filed)
Share
Land Area To Be Used For Construction Of Apartments
492.98
7.8%
Vehicle Parkings
5,828.78
92.2%
Apartments 123 units · 1 tower
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
49.40
532
61
Apartment/Shops/Other Buildings
48.87
526
62
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
HSVP
Yes
Water Supply
HSVP
Yes
Electricity
DHBVN
Yes
Sewage Disposal
HSVP
Yes
Storm Water Drainage
NO
No
Facilities in the service plan
Facility
Estimated cost
Status
Electricity Supply System
₹ 1.11 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
Form Br-III (Approval Of Revised Building Plan)
Already Been Obtained
23 Aug 2023
Specifications (as filed)
Flooring Details Of Various Parts Of House
Ceramic Tiles/ Marble Flooring
Wall Finishing Details
Oil Bond Distemper
Kitchen Details
Marble Counter With 2 Dado
Bathroom Fittings
Isi Marked
Wood Work Etc
Hardwood Door Frames
Doors And Windos Frames
Hardwood Door Frames/Flush Doors
Electric Fittings
Isi Marked (Standard)
Conducting And Wiring Details
Isi Marked (Standard)
Lift Details
Marble Flooring/ Kota Stone
Windows/Glazings
Aluminium
Doors
Hardwood
Main Doors
Flush Door
Internal Doors
Flush Door
Electrical Fittings
Isi Marked
External Finishing/Colour Scheme
Texture Paint
Internal Finishing
Obd
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Shree Vardhman Mantra (Q Tower)?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.