Registration validHRERA Gurugram

Shree Vardhman Mantra (Q Tower)

by Dss Infrastructure Private Limited · Shree Vardhman Mantra, Sector 67, Badshahpur, Gurugram

RERA registration
GGM/763/495/2023/107
Registered on
4 Dec 2023
Valid till
31 Oct 2028
Project ID
RERA-GRG-1449-2023
Apartments
123 in 1 tower
Completion (as filed)
31 Oct 2028
Estimated cost
₹ 22.32 Cr

RERA registration

Registration certificateGGM/763/495/2023/107, dated 4 Dec 2023
Registration valid till31 Oct 2028
Project IDRERA-GRG-1449-2023
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameShree Vardhman Mantra (Q Tower)
PromoterDss Infrastructure Private Limited
Promoter’s registered office309, Indraprakash Building 21, Brakhamba Road, New Delhi - 110001
CINU70109DL2008PTC184878
Site addressShree Vardhman Mantra, Sector 67, Badshahpur, Gurugram
SectorSector 67
Tehsil / DistrictBadshahpur St / Gurugram
Building plans approved22 Aug 2023
Construction start (as filed)1 Feb 2024
Completion (as filed)31 Oct 2028
Application submitted19 Sep 2023

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Hearing Examination By Authority View order
    Proceedings

    Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the project. Sh. Ashok Kumar Gupta (Director), Sh. Sachin Jain, Sh. Rishabh Jain (Advocate) are present on behalf of the promoter and stated that they want to take the registration of the tower Q only as OC has been obtained for rest of the area. As per the approved layout plan, it is found that, a tower Q has been added and location of STP, Electric sub-station has also been changed and green area has also changed. As some area of tower Q is already registered with the Authority vide RC no. 50 of 2022 dated 13.06.2022 valid up to 31.12.2024., so the amendment in the existing registration is to be required and 2/3rd consent of the existing allottees is also required as the building plans has been revised and a public notice for inviting objections should also be made for information of all concerned allottees and deficiencies be issued to the applicant promoter which is yet to be conveyed. The matter to come up on 20.11.2023.

  1. Notice sent to the promoter By Hand
  2. Hearing Adjournment View order
    Proceedings

    Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the project.  No reply has been submitted by the promoter company against the deficiencies conveyed by the authority through notice dated 16.11.2023. Therefore, in view of the same the matter is adjourned, and the next date of hearing will be conveyed after submission of reply of deficiencies already conveyed through deficiency notice. Further, if no response is received from the promoter within next 4 week’s time, in that case the concerned official to put up the matter on file for issuance of show cause notice as to why their application for registration of project may not be rejected following the due procedure under the Act of 2016.

  3. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the project.  Sh. Sachin Jain (Director) is present on behalf of the promoter and stated that this is a case of low-cost affordable housing and non-encumbrance certificate from tehsildar will be submitted today in the registry of the Authority and regarding late fees, they had submitted a representation to waive off the late fees, as DGTCP, Haryana had accorded the approval dated 03.03.2021 to consider the period from 01.11.2017 to 30.09.2020 as “Zero period” based on the directions of the Hon’ble High Court of India.  As this is the exceptional case of low-cost affordable housing and DTCP has already allowed “Zero period” from 01.11.2017 to 30.09.2020, so in view of the above, the Authority has decided to consider the “Zero Period” from 01.11.2017 to 30.09.2020 and the promoter is directed to submit the remaining deficit late fees amounting Rs. 14,29,938/- as the promoter had applied in the Authority on 05.11.2020 and promoter is also directed to submit the non-encumbrance certificate and the BG/DD amounting Rs 25 Lakh each as a security amount for revised fire scheme approval and revised approved service plans and estimates within 15 days. Approved as proposed and the RC shall be issued after compliance of all the conditions and corrections in the DPI and A to H.

  1. Registration granted GGM/763/495/2023/107
  2. Certificate uploaded RC Uploaded
  3. Registration valid till

Land, licence & cost

Licence69 of 2010 dated 11 September, 2010
FAR permissible / proposed175 / 175
Estimated project cost₹ 22.32 Cr
Cost of land₹ 2.25 Cr
Cost of construction₹ 14.64 Cr
Infrastructure and other structures₹ 1.12 Cr
EDC, taxes, levies and other costs₹ 4.3 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments492.987.8%
Vehicle Parkings5,828.7892.2%

Apartments 123 units · 1 tower

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings49.4053261
Apartment/Shops/Other Buildings48.8752662

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsHSVPYes
Water SupplyHSVPYes
ElectricityDHBVNYes
Sewage DisposalHSVPYes
Storm Water DrainageNONo

Facilities in the service plan

FacilityEstimated costStatus
Electricity Supply System₹ 1.11 CrAs Per Project Report

Statutory approvals

ApprovalStatusDate
Form Br-III (Approval Of Revised Building Plan)Already Been Obtained23 Aug 2023

Specifications (as filed)

Flooring Details Of Various Parts Of HouseCeramic Tiles/ Marble Flooring
Wall Finishing DetailsOil Bond Distemper
Kitchen DetailsMarble Counter With 2 Dado
Bathroom FittingsIsi Marked
Wood Work EtcHardwood Door Frames
Doors And Windos FramesHardwood Door Frames/Flush Doors
Electric FittingsIsi Marked (Standard)
Conducting And Wiring DetailsIsi Marked (Standard)
Lift DetailsMarble Flooring/ Kota Stone
Windows/GlazingsAluminium
DoorsHardwood
Main DoorsFlush Door
Internal DoorsFlush Door
Electrical FittingsIsi Marked
External Finishing/Colour SchemeTexture Paint
Internal FinishingObd

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Shree Vardhman Mantra (Q Tower)?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.