HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Proceedings dated: 19.05.2025. Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the case. Sh. Ayush Singla (AR), Ms. Suman Kaushik are present on behalf of promoter and states that EC, Fire Scheme approval and service plans and estimates have been applied to the concerned authorities and the same shall be obtained. Further, the project is well connected to the 12m service road, so road access permission is not required. Approved as proposed subject to submission of the requisite BG’s/DD of Rs. 25 lakh each as a security amount for the submission of EC, approved fire scheme and approved SPE within four months failing which, the same shall be forfeited. Mining permission shall be obtained before start of excavation at site. The RC shall be issued after submission of remaining documents including the correction in form A-H and DPI along with the DD/BG’s as above.
Registration grantedGGM/956/688/2025/59
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
1.579 acres
Total licensed area
1.579 acres
Licence
02 OF 2025 DATED 08.01.2025, Memo no Endst No. LC/5272/JE(RK)/2025/906
FAR permissible / proposed
2.37 / 2.368
Estimated project cost
₹ 123 Cr
Cost of land
₹ 5.44 Cr
Cost of construction
₹ 87 Cr
Infrastructure and other structures
₹ 2.1 Cr
EDC, taxes, levies and other costs
₹ 28.46 Cr
How the land will be used
Use
Acres
Share
Land Area To Be Used For Construction Of Apartments
0.4348
28.3%
Construction Of Roads
0.6306
41%
Parks And Playgrounds
0.4239
27.6%
Vehicle Parkings
0.0406
2.6%
Electricity Sub-Station
0.0083
0.5%
Apartments 126 units · 1 tower
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
94.25
1,014
64
Apartment/Shops/Other Buildings
94.25
1,014
2
Apartment/Shops/Other Buildings
94.25
1,014
2
Apartment/Shops/Other Buildings
94.25
1,014
32
Apartment/Shops/Other Buildings
94.25
1,014
2
Apartment/Shops/Other Buildings
94.84
1,021
20
Apartment/Shops/Other Buildings
94.84
1,021
2
Apartment/Shops/Other Buildings
33.43
360
2
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
ALREADY CONNECTED
Yes
Water Supply
GMDA
Yes
Electricity
DHBVN
Yes
Sewage Disposal
GMDA
Yes
Storm Water Drainage
GMDA
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 5 lakh
As Per Project Report
Water Supply System
₹ 23 lakh
As Per Project Report
Storm Water Drainage
₹ 18.41 lakh
As Per Project Report
Electricity Supply System
₹ 25 lakh
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 25 lakh
As Per Project Report
Street Lighting
₹ 6.06 lakh
As Per Project Report
Security And Fire Fighting
₹ 25 lakh
As Per Project Report
Playgrounds And Parks
₹ 10.5 lakh
As Per Project Report
Renewable Energy System
₹ 15 lakh
As Per Project Report
Electrification Cost
₹ 5 lakh
As Per Project Report
Rain Water Harvesting
₹ 12 lakh
As Per Project Report
Underground Water Tank
₹ 14 lakh
As Per Project Report
Stp
₹ 25 lakh
As Per Project Report
Parking
₹ 1 lakh
As Per Project Report
Statutory approvals
Approval
Status
Date
License
Already Been Obtained
8 Jan 2025
Assurance For Water Supply
Already Been Obtained
10 Jan 2025
Assurance For Storm Water
Already Been Obtained
17 Jan 2025
Assurance For Sewerage Connection
Already Been Obtained
17 Jan 2025
HUDA Construction Water
Already Been Obtained
17 Jan 2025
Electrical Load
Already Been Obtained
30 Jan 2025
Airport Height Clearance
Already Been Obtained
25 Oct 2024
Forest Noc
Already Been Obtained
16 Aug 2024
Building Plan Approval (Br-III)
Already Been Obtained
23 Apr 2025
Environment Clearance Approval
Applied For But Yet To Receive
21 Jan 2025
Service Plans And Estimates Approval
Yet To File For Approval
Fire Scheme Approval
Yet To File For Approval
Specifications (as filed)
Flooring Details Of Various Parts Of House
Vitrified Tile, Wooden Flooring Laminated, Kota Stone Flooring , Epoxy Paint Flooring
Wall Finishing Details
Vitrified Tile
Kitchen Details
Vitrified Tile, Full Height Windows- Aluminium Powder Coated Sections
Bathroom Fittings
Vitrified Tile
Wood Work Etc
No
Doors And Windos Frames
1 Hr Fire Rated Door With Veneer Finish, Wooden Frame With Flush Door With Laminate Finish (On Both Sides)
Glass Work
Full Height Windows- Aluminium Powder Coated Sections
Electric Fittings
Heavy Duty, Switches Socket-Modular, Led, Variable Rate Flow System.
Conducting And Wiring Details
Heavy Duty, Moduler
Water Storage
Yes
Lift Details
4 Flats Per Floor, 3 Lifts Per Floor
External Glazings
Full Height Windows- Aluminium Powder Coated Sections
Windows/Glazings
Full Height Windows- Aluminium Powder Coated Sections
Doors
1 Hr Fire Rated Door With Veneer Finish, Wooden Frame With Flush Door With Laminate Finish (On Both Sides)
Main Doors
1 Hr Fire Rated Door With Veneer Finish
Internal Doors
Wooden Frame With Flush Door With Laminate Finish (On Both Sides)
Air Conditioning
Variable Rate Flow System.
Electrical Fittings
Heavy Duty Conduting Modular Switches, C Curve Mcb
Cng Pipe Line
Yes
External Finishing/Colour Scheme
Extranl Grade Texture Paint
Internal Finishing
Premium Acrylic Emulsion
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Seggovias?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.