501, 5TH Floor, Time Tower,Mg Road, Gurugram, Haryana-122001
CIN
U70200DL2011PTC219789
Site address
Sector-90,Village-Nawada Fatehpur,
Sector
Sector 90
Tehsil / District
Gurgaon / Gurugram
Layout plan approved
10 Mar 2017
Building plans approved
10 Mar 2017
Application submitted
28 Nov 2019
Authority, hearings & orders
Current statusApproved And Certificate Uploaded
Next hearingNot Required
Registration granted05 OF 2018
Application submitted online
Application received by HRERA Gurugram
Registration valid till
Land, licence & cost
Land area of the project
3.841 acres
Total licensed area
3.841 acres
Licence
License No.53 of 2013 dated 28.06.2013
FAR permissible / proposed
6.721083 / 6.715426
Estimated project cost
₹ 210 Cr
Cost of land
₹ 18.06 Cr
Cost of construction
₹ 102.5 Cr
EDC, taxes, levies and other costs
₹ 89.44 Cr
How the land will be used
Use
Sq m
Share
Land Area To Be Used For Construction Of Apartments
6,215.748
40%
Pavements
5,226.7099
33.6%
Vehicle Parkings
4,100
26.4%
External services
Service
Provided by
Approval taken
Roads
No
WATER SUPPLY
HUDA
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
HUDA
Yes
STORM WATER DRAINAGE
HUDA
Yes
4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
0
AS PER PROJECT REPORT
2
Water Supply System
0
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
0
As Per Project Report
4
ELECTRICITY SUPPLY SYSTEM
0
AS PER PROJECT REPORT
5
Sewage Treatment & Garbage Disposal
0
AS PER PROJECT REPORT
6
STREET LIGHTING
0
As Per Project Report
7
SECURITY AND FIRE FIGHTING
0
AS PER PROJECT REPORT
8
Playgrounds And Parks
0
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
0
As Per Project Report
10
SHOPPING AREA
0
AS PER PROJECT REPORT
11
Renewable Energy System
0
AS PER PROJECT REPORT
12
SCHOOL
0
As Per Project Report
13
HOSPITAL/DISPENSARY
0
AS PER PROJECT REPORT
14
Any Other
0
AS PER PROJECT REPORT
15
TOTAL ESTIMATED COST OF PROJECT
10250
As Per Project Report
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.
10-03-2017
(date)
6. Date of approval of Building Plans
10-03-2017
(date)
(i) Details of the plots/apartments in the project:
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Total size of the plots/carpet area of the apartments
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS/RESTAURANTS/MULTIPLEX/BANQUET/HOTEL
21004.8
327
6868569.6
145
182
1
Total
327
6868569.6
145
182
1
(ii) Apartments/Shops/Other Buildings:-
(a) Status of construction activities in respect of sold/booked apartments.
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
SHOPS/MULTIPLEX/BANQUET/HOTEL
145
100% COMPLETE
(b) Time schedule of completion of already booked apartments:
Start Date
11-04-2014
Earlier date of completion
30-06-2020
Revised date of completion
30-06-2020
(c) Time schedule for development of infrastructure:
Start Date
11-04-2014
Percentage completion Upto the
date of application
100
Projected date of completion
30-06-2020
(d) Provide further details in the proforma REP-I Part-C-X.
(e) Plan of action for completing the Project along with requisite infrastructure.
(iii) Status in respect of plotted colony:-
(a)
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
Plot
0
0
(b) Schedule for development of Infrastructure:
Start Date
11-04-2014
Percentage completion
0
Projected date of completion
30-06-2020
(c) Provide further details in the proforma REP-I Part-C-X.
NA
(d) Schedule of completing the project and handing over possession of the plots.
NA
(iv) Vehicle parkings details of the project-
a) Underground parking
462
b) Stilt parking
0
c) Covered parking
0
d) Open parking
82
e) Independent garages
0
(v) Quarterly schedule of development of whole/remaining part of the project:
(a) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
Shops
1113.49
Plots
0
(b) Infrastructure
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
1113.49
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - C-X
1.Financial information:
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
327
ii. No. of Flats/ Apartments booked
145
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
15523.71 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
12218.40 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
3305.31 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
1871.97 Lakhs
vii. Amount invested in the project upto the date of application
19301.45 Lakhs
Land cost (If any)
1589.50 Lakhs
Apartments
0 Lakhs
Infrastructure
9416.99 Lakhs
EDC/ Taxes Etc.
8294.96 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
1698.55 Lakhs
(a) In respect of existing allottees
1222.956 Lakhs
(b) In respect of rest of the project
475.594 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
6425.58 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C)
6882.90 Lakhs
2.Additional information:
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
0
0
II. WATER SUPPLY SYSTEM
0
0
III. STORM WATER DRAINAGE
0
0
IV. ELECTRICITY SUPPLY SYSTEM
0
0
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
0
0
VI. CLUB HOUSE/COMMUNITY CENTRE
0
0
VII. SCHOOL
0
0
VIII. ANY OTHER
0
0
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
0
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
0
0
XIII. COVERED PARKING
0
0
XIV. OPEN PARKING
0
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
0
0
XVII. OTHER FACILITIES AS PER PROJECT REPORT
0
0
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - D
Accounts related information:
1. Annex copy of the balance sheet of last 3 years
Yes
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.
Yes
3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch address
KARNATAKA BANK LTD
Bank Account number
5497000300021601
IFSC code
KARB0000549
MICR code
110052012
Branch code
000549
4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
R P Gupta, 501 5th Floor Time Tower Gurgaon Haryana-122001
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - E
Details of the statutory approvals:
1. Annex copies of the following in Folder E:
i. Lay out Plan
Yes
ii. Demarcation Plan
Yes
iii. Zoning Plan
Yes
iv. Building Plan
Yes
Site Plan
Yes
Floor Plan
Yes
Apartment Plans
No
Elevation Section
Yes
Detail of Permissible FAR
Yes
Detail of covered area achieved FAR
Yes
2. Annex copies of the following in Folder E:
I. ROADS AND PAVEMENT PLAN
No
II. Electricity Supply Plan
Yes
III. WATER SUPPLY PLAN
Yes
IV. SEWERAGE AND GARBAGE DISPOSAL PLAN
Yes
V. Strom Water Drainage
Yes
VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY
No
VII. STREET LIGHTING PLAN
No
Viii. Parking Plan
Yes
3. Statutory Approvals Status
Statutory Approvals
Statutory Approvals Status
Date
I. Airports Authority Of India
ALREADY BEEN OBTAINED
02-05-2014
II. Environmental Clearance
ALREADY BEEN OBTAINED
24-12-2013
III. Fire Approval
ALREADY BEEN OBTAINED
18-09-2019
IV. Haryana State Pollution Control
ALREADY BEEN OBTAINED
22-02-2014
V. Forest Noc
ALREADY BEEN OBTAINED
14-06-2013
Vi. Aravali Noc
ALREADY BEEN OBTAINED
10-07-2013
Vii. Sewage Noc
ALREADY BEEN OBTAINED
23-10-2013
Viii. Electric Noc
ALREADY BEEN OBTAINED
07-10-2019
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________
Seal _____________
Date _____________
FORM REP-I
Part - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
(Annex a copy in Folder F)
No
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)
(Annex a copy in Folder F)
Yes
3. Gist of the important provisions of the Draft Agreement
(Annex a copy in Folder F)
1. Sale Consideration
2. Applicant details & Unit details.
3. Floor Plans & other terms & conditions.
4. Payment schedule
5.General Compliance
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - G
Projects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - H
Specification Of Construction
Specification of apartments and other buildings including the following:
1
Flooring Details Of Various Parts Of House
TILES & STONE IN COMMON AREA
2
Wall Finishing Details
PAINT IN COMMON AREA
3
Kitchen Details
AS PER PROJECT WHEREVER AS APPLICABLE
4
Bathroom Fittings
DURAVIT/GROHE/VITRA IN COMMON AREA
5
Wood Work Etc
PLY/ LAMINATE IN COMMON AREA
6
Doors And Windos Frames
ALUMINIUM /WOODEN IN COMMON AREA
7
Glass Work
AS PER PROJECT, WHEREVER AS APPLICABLE
8
Electric Fittings
AS PER PROJECT ,WHEREVER AS APPLICABLE
9
Conducting And Wiring Details
POLYCAB WIRE IN COMMON AREA
10
Cupboard Details
NA
11
Water Storage
OVERHEAD & UNDER GROUND WATER TANK IN COMMON AREA
12
Lift Details
12 LIFTS
13
External Glazings
ALUMINIUM WITH TOUGHENED GLASS WHEREVER AS APPLICABLE
13.1
Windows/Glazings
ALUMINIUM WHEREVER AS APPLICABLE
14
Doors
ALUMINIUM WHEREVER AS APPLICABLE
14.1
Main Doors
WOODEN WHEREVER AS APPLICABLE
14.2
Internal Doors
WOODEN WHEREVER AS APPLICABLE
15
Air Conditioning
CHILLERS/SPLIT-AC WHEREVER AS APPLICABLE
16
Electrical Fittings
AS PER PROJECT , WHEREVER AS APPLICABLE
17
Cng Pipe Line
NA
18
Provision Of Wifi And Broadband Facility
AS PER PROJECT WHEREVER AS APPLICABLE
19
External Finishing/Colour Scheme
TEXTURE PAINT IN COMMON AREA
20
Internal Finishing
POP/WOODEN/PAINT WHEREVER AS APPLICABLE
SPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge
1 . 1
FLOOR
Na
1 . 2
WALLS
Na
1 . 3
CEILING
Na
2 . MASTER BEDROOM/DRESSROOM
2 . 1
Floor
NA
2 . 2
Walls
NA
2 . 3
Ceiling
NA
2 . 4
Modular Wardrobes
NA
3 . MASTER TOILET
3 . 1
FLOOR
NA
3 . 2
WALLS
NA
3 . 3
CEILING
NA
3 . 4
COUNTERS
NA
3 . 5
SANITARY WARE/CP FITTINGS
NA
3 . 6
FITTING/FIXTURES
NA
4 . Bed Rooms
4 . 1
FLOOR
Na
4 . 2
WALLS
Na
4 . 3
CEILING
Na
4 . 4
WARDROBES
Na
5 . TOILET
5 . 1
Floor
TILES IN COMMON AREA
5 . 2
Walls
TILES IN COMMON AREA
5 . 3
Ceiling
GRID CEILING & PAINT IN COMMON AREA
5 . 4
Counters
STONE IN COMMON AREA
5 . 5
Sanitary Ware/Cp Fittings
DURAVIT WHEREVER AS APPLICABLE
5 . 6
Fixtures
JAGUAR ACCESSORIES/ART LIGHT WHEREVER AS APPLICABLE
6 . KITCHEN
6 . 1
FLOOR
NA
6 . 2
WALLS
NA
6 . 3
CEILING
NA
6 . 4
COUNTERS
NA
6 . 5
FIXTURES
NA
6 . 6
KITCHEN APPLIANCES
NA
7 . Utility Rooms/Utility Balcony/Toilet
7 . 1
FLOOR
Na
7 . 2
WALLS & CEILING
Na
7 . 3
TOILET
Na
7 . 4
BALCONY
Na
8 . SIT-OUTS
8 . 1
Floor
NA
8 . 2
Walls & Ceiling
NA
8 . 3
Railings
NA
8 . 4
Fixtures
NA
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
List of Uploaded Documents
Sr. No.
Document Description
Date of Document Upload
View Document
1
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT
27-11-2019
View Document
2
NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
27-11-2019
View Document
3
Zoning Plan
26-11-2019
View Document
4
AGREEMENT FOR SALE
26-11-2019
View Document
5
DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
26-11-2019
View Document
6
Service Plans Showing The Services On The Layout Plan
26-11-2019
View Document
7
IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
26-11-2019
View Document
8
IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN
27-11-2019
View Document
9
Copy Of License Along With Schedule Of Land
26-11-2019
View Document
10
A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS
26-11-2019
View Document
11
BALANCE SHEET
26-11-2019
View Document
12
Cash Flow Statement Of The Proposed Project
28-11-2019
View Document
13
DEMARCATION PLAN
28-11-2019
View Document
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Documents Uploaded After Registration
Sr. No.
Document Description
Date of Document Upload
View Document
1
Occupation Certificate
17-07-2024
View Document
2
Completion Certificate
18-10-2024
View Document
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Facilities in the service plan
Facility
Estimated cost
Status
Total Estimated Cost Of Project
₹ 102.5 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
Airports Authority Of India
Already Been Obtained
2 May 2014
Environmental Clearance
Already Been Obtained
24 Dec 2013
Fire Approval
Already Been Obtained
18 Sep 2019
Haryana State Pollution Control
Already Been Obtained
22 Feb 2014
Forest Noc
Already Been Obtained
14 Jun 2013
Aravali Noc
Already Been Obtained
10 Jul 2013
Sewage Noc
Already Been Obtained
23 Oct 2013
Electric Noc
Already Been Obtained
7 Oct 2019
Specifications (as filed)
Flooring Details Of Various Parts Of House
Tiles & Stone In Common Area
Wall Finishing Details
Paint In Common Area
Kitchen Details
As Per Project Wherever As Applicable
Bathroom Fittings
Duravit/Grohe/Vitra In Common Area
Wood Work Etc
Ply/ Laminate In Common Area
Doors And Windos Frames
Aluminium /Wooden In Common Area
Glass Work
As Per Project, Wherever As Applicable
Electric Fittings
As Per Project ,Wherever As Applicable
Conducting And Wiring Details
Polycab Wire In Common Area
Water Storage
Overhead & Under Ground Water Tank In Common Area
Lift Details
12 Lifts
External Glazings
Aluminium With Toughened Glass Wherever As Applicable
Windows/Glazings
Aluminium Wherever As Applicable
Doors
Aluminium Wherever As Applicable
Main Doors
Wooden Wherever As Applicable
Internal Doors
Wooden Wherever As Applicable
Air Conditioning
Chillers/Split-Ac Wherever As Applicable
Electrical Fittings
As Per Project , Wherever As Applicable
Provision Of Wifi And Broadband Facility
As Per Project Wherever As Applicable
External Finishing/Colour Scheme
Texture Paint In Common Area
Internal Finishing
Pop/Wooden/Paint Wherever As Applicable
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Sapphire Ninety?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.