Registration period overHRERA GurugramInterim ReraOC / CC on record

Sapphire Ninety

by Crown Propbuild Pvt.ltd · Sector-90, Village Nawada Fatehpur

RERA registration
05 OF 2018
Registered on
1 Jan 2018
Valid till
30 Jun 2020
Project ID
RERA-GRG-339-2019
Land area
3.841 acres
Estimated cost
₹ 210 Cr

RERA registration

Registration certificate05 OF 2018, dated 1 Jan 2018
Registration valid till30 Jun 2020
Project IDRERA-GRG-339-2019
AuthorityHRERA Gurugram (Interim Rera)
Project type (as filed)Ongoing
Project nameSapphire Ninety
PromoterCrown Propbuild Private Limited
Promoter’s registered office501, 5TH Floor, Time Tower,Mg Road, Gurugram, Haryana-122001
CINU70200DL2011PTC219789
Site addressSector-90,Village-Nawada Fatehpur,
SectorSector 90
Tehsil / DistrictGurgaon / Gurugram
Layout plan approved10 Mar 2017
Building plans approved10 Mar 2017
Application submitted28 Nov 2019

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Next hearingNot Required
  1. Registration granted 05 OF 2018
  2. Application submitted online
  3. Application received by HRERA Gurugram
  1. Registration valid till

Land, licence & cost

Land area of the project3.841 acres
Total licensed area3.841 acres
LicenceLicense No.53 of 2013 dated 28.06.2013
FAR permissible / proposed6.721083 / 6.715426
Estimated project cost₹ 210 Cr
Cost of land₹ 18.06 Cr
Cost of construction₹ 102.5 Cr
EDC, taxes, levies and other costs₹ 89.44 Cr

How the land will be used

UseSq mShare
Land Area To Be Used For Construction Of Apartments6,215.74840%
Pavements5,226.709933.6%
Vehicle Parkings4,10026.4%

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
HUDAYesELECTRICITY
DHBVNYesSEWAGE DISPOSAL
HUDAYesSTORM WATER DRAINAGE
HUDAYes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)1INTERNAL ROADS AND PAVEMENTS
0AS PER PROJECT REPORT2
Water Supply System0AS PER PROJECT REPORT
3STORM WATER DRAINAGE0
As Per Project Report4ELECTRICITY SUPPLY SYSTEM
0AS PER PROJECT REPORT5
Sewage Treatment & Garbage Disposal0AS PER PROJECT REPORT
6STREET LIGHTING0
As Per Project Report7SECURITY AND FIRE FIGHTING
0AS PER PROJECT REPORT8
Playgrounds And Parks0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0
As Per Project Report10SHOPPING AREA
0AS PER PROJECT REPORT11
Renewable Energy System0AS PER PROJECT REPORT
12SCHOOL0
As Per Project Report13HOSPITAL/DISPENSARY
0AS PER PROJECT REPORT14
Any Other0AS PER PROJECT REPORT
15TOTAL ESTIMATED COST OF PROJECT10250
As Per Project Report5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.10-03-2017
(date)6. Date of approval of Building Plans10-03-2017
(date)(i) Details of the plots/apartments in the project:Sr. No.
Plot/ apartment typeSize of the plot/carpet area of the apartmentsTotal number of plots/apartments in the project
Total size of the plots/carpet area of the apartmentsPlots/apartments booked/ sold upto the date of applicationYet to be sold/ booked
No. of towers to be/ being constructed for booked apartments1APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS/RESTAURANTS/MULTIPLEX/BANQUET/HOTEL
21004.83276868569.6
1451821
Total3276868569.6
1451821
(ii) Apartments/Shops/Other Buildings:-(a) Status of construction activities in respect of sold/booked apartments.Type
Number of apartments booked/ soldWrite or Annex the stage of construction of the booked/ sold apartments in folder CSHOPS/MULTIPLEX/BANQUET/HOTEL
145100% COMPLETE(b) Time schedule of completion of already booked apartments:
Start Date11-04-2014Earlier date of completion
30-06-2020Revised date of completion30-06-2020
(c) Time schedule for development of infrastructure:Start Date11-04-2014
Percentage completion Upto the   date of application100
Projected date of completion30-06-2020(d) Provide further details in the proforma REP-I Part-C-X.
(e) Plan of action for completing the Project along with requisite infrastructure.(iii) Status in respect of plotted colony:-(a)
PlotsBooked/soldStage of handing over the possession (Write or Annex details)
Plot00
(b) Schedule for development of Infrastructure:Start Date11-04-2014
Percentage completion0Projected date of completion
30-06-2020(c) Provide further details in the proforma REP-I Part-C-X.NA
(d) Schedule of completing the project and handing over possession of the plots.NA(iv) Vehicle parkings details of the project-
a) Underground parking462b) Stilt parking
0c) Covered parking0
d) Open parking82e) Independent garages
0(v) Quarterly schedule of development of whole/remaining part of the project:(a) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)ParticularsExpenditure
Expenditure to be made in each quarter (In Lakhs)ParticularsYear-2019
Jan-MarApr-JuneJuly-Sep
Oct-DecApartments0
Shops1113.49Plots
0(b) InfrastructureExpenditure incurred till the date of application (In Lakhs)
ParticularsExpenditureRoads & Pavements
0Water Supply System0
Sewerage treatment & garbage disposal0Electricity Supply System
0Storm Water Drainage0
Parks and Playgrounds0Clubhouse/community centres
0Shopping area0
Other0Expenditure to be made in each quarter (In Lakhs)
ParticularsYear-2019Jan-Mar
Apr-JuneJuly-SepOct-Dec
Roads & Pavements0Water Supply System
0Sewerage treatment & garbage disposal0
Electricity Supply System0Storm Water Drainage
0Parks and Playgrounds0
Clubhouse/community centres0Shopping area
0Other1113.49
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - C-X
1.Financial information:ParticularsRemarks, if any
i. No. of Flats/Apartments constructed327ii. No. of Flats/ Apartments booked
145iii. Total amount sale value of booked Flats, on the date of application/end of last quarter15523.71 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter12218.40 Lakhsv. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
3305.31 Lakhsvi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter1871.97 Lakhs
vii. Amount invested in the project upto the date of application19301.45 LakhsLand cost (If any)
1589.50 LakhsApartments0 Lakhs
Infrastructure9416.99 LakhsEDC/ Taxes Etc.
8294.96 Lakhsviii. Balance cost to be incurred for completion of the project and delivery of possession1698.55 Lakhs
(a) In respect of existing allottees1222.956 Lakhs(b) In respect of rest of the project
475.594 Lakhsix. The amount of loan raised from the banks/ financial institutions/ private persons against the projectAnnex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
6425.58 Lakhsx. Total liabilities against the project up-to-date. (Annex details in folder C)6882.90 Lakhs
2.Additional information:ParticularsEstimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)I. INTERNAL ROADS AND PAVEMENTS0
0II. WATER SUPPLY SYSTEM0
0III. STORM WATER DRAINAGE0
0IV. ELECTRICITY SUPPLY SYSTEM0
0V. SEWAGE TREATMENT & GARBAGE DISPOSAL0
0VI. CLUB HOUSE/COMMUNITY CENTRE0
0VII. SCHOOL0
0VIII. ANY OTHER0
0IX. SOLID WASTE COLLECTION & MGMT SYSTEM0
0X. CLUBHOUSE0
0XI. NEIGHBOURHOOD SHOPPING0
0XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.0
0XIII. COVERED PARKING0
0XIV. OPEN PARKING0
0XV. GARAGES0
0XVI. SECURITY SYSTEM0
0XVII. OTHER FACILITIES AS PER PROJECT REPORT0
0I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - DAccounts related information:
1. Annex copy of the balance sheet of last 3 yearsYes2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch addressKARNATAKA BANK LTDBank Account number
5497000300021601IFSC codeKARB0000549
MICR code110052012Branch code
0005494. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)R P Gupta, 501 5th Floor Time Tower Gurgaon Haryana-122001
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - EDetails of the statutory approvals:
1. Annex copies of the following in Folder E:i. Lay out PlanYes
ii. Demarcation PlanYesiii. Zoning Plan
Yesiv. Building PlanYes
Site PlanYesFloor Plan
YesApartment PlansNo
Elevation SectionYesDetail of Permissible FAR
YesDetail of covered area achieved FARYes
2. Annex copies of the following in Folder E:I. ROADS AND PAVEMENT PLANNo
II. Electricity Supply PlanYesIII. WATER SUPPLY PLAN
YesIV. SEWERAGE AND GARBAGE DISPOSAL PLANYes
V. Strom Water DrainageYesVI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY
NoVII. STREET LIGHTING PLANNo
Viii. Parking PlanYes3. Statutory Approvals Status
Statutory ApprovalsStatutory Approvals StatusDate
I. Airports Authority Of IndiaALREADY BEEN OBTAINED02-05-2014
II. Environmental ClearanceALREADY BEEN OBTAINED24-12-2013
III. Fire ApprovalALREADY BEEN OBTAINED18-09-2019
IV. Haryana State Pollution ControlALREADY BEEN OBTAINED22-02-2014
V. Forest NocALREADY BEEN OBTAINED14-06-2013
Vi. Aravali NocALREADY BEEN OBTAINED10-07-2013
Vii. Sewage NocALREADY BEEN OBTAINED23-10-2013
Viii. Electric NocALREADY BEEN OBTAINED07-10-2019
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________Seal _____________
Date _____________FORM REP-IPart - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)No
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)Yes
3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)1. Sale Consideration
2. Applicant details & Unit details.3. Floor Plans & other terms & conditions.4. Payment schedule
5.General ComplianceI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - GProjects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - H
Specification Of ConstructionSpecification of apartments and other buildings including the following:1
Flooring Details Of Various Parts Of HouseTILES & STONE IN COMMON AREA2
Wall Finishing DetailsPAINT IN COMMON AREA3
Kitchen DetailsAS PER PROJECT WHEREVER AS APPLICABLE4
Bathroom FittingsDURAVIT/GROHE/VITRA IN COMMON AREA5
Wood Work EtcPLY/ LAMINATE IN COMMON AREA6
Doors And Windos FramesALUMINIUM /WOODEN IN COMMON AREA7
Glass WorkAS PER PROJECT, WHEREVER AS APPLICABLE8
Electric FittingsAS PER PROJECT ,WHEREVER AS APPLICABLE9
Conducting And Wiring DetailsPOLYCAB WIRE IN COMMON AREA10
Cupboard DetailsNA11
Water StorageOVERHEAD & UNDER GROUND WATER TANK IN COMMON AREA12
Lift Details12 LIFTS13
External GlazingsALUMINIUM WITH TOUGHENED GLASS WHEREVER AS APPLICABLE13.1
Windows/GlazingsALUMINIUM WHEREVER AS APPLICABLE14
DoorsALUMINIUM WHEREVER AS APPLICABLE14.1
Main DoorsWOODEN WHEREVER AS APPLICABLE14.2
Internal DoorsWOODEN WHEREVER AS APPLICABLE15
Air ConditioningCHILLERS/SPLIT-AC WHEREVER AS APPLICABLE16
Electrical FittingsAS PER PROJECT , WHEREVER AS APPLICABLE17
Cng Pipe LineNA18
Provision Of Wifi And Broadband FacilityAS PER PROJECT WHEREVER AS APPLICABLE19
External Finishing/Colour SchemeTEXTURE PAINT IN COMMON AREA20
Internal FinishingPOP/WOODEN/PAINT WHEREVER AS APPLICABLESPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge1 . 1FLOOR
Na1 . 2WALLS
Na1 . 3CEILING
Na2 . MASTER BEDROOM/DRESSROOM2 . 1
FloorNA2 . 2
WallsNA2 . 3
CeilingNA2 . 4
Modular WardrobesNA3 . MASTER TOILET
3 . 1FLOORNA
3 . 2WALLSNA
3 . 3CEILINGNA
3 . 4COUNTERSNA
3 . 5SANITARY WARE/CP FITTINGSNA
3 . 6FITTING/FIXTURESNA
4 . Bed Rooms4 . 1FLOOR
Na4 . 2WALLS
Na4 . 3CEILING
Na4 . 4WARDROBES
Na5 . TOILET5 . 1
FloorTILES IN COMMON AREA5 . 2
WallsTILES IN COMMON AREA5 . 3
CeilingGRID CEILING & PAINT IN COMMON AREA5 . 4
CountersSTONE IN COMMON AREA5 . 5
Sanitary Ware/Cp FittingsDURAVIT WHEREVER AS APPLICABLE5 . 6
FixturesJAGUAR ACCESSORIES/ART LIGHT WHEREVER AS APPLICABLE6 . KITCHEN
6 . 1FLOORNA
6 . 2WALLSNA
6 . 3CEILINGNA
6 . 4COUNTERSNA
6 . 5FIXTURESNA
6 . 6KITCHEN APPLIANCESNA
7 . Utility Rooms/Utility Balcony/Toilet7 . 1FLOOR
Na7 . 2WALLS & CEILING
Na7 . 3TOILET
Na7 . 4BALCONY
Na8 . SIT-OUTS8 . 1
FloorNA8 . 2
Walls & CeilingNA8 . 3
RailingsNA8 . 4
FixturesNAI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________List of Uploaded DocumentsSr. No.
Document DescriptionDate of Document UploadView Document
1CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT27-11-2019
View Document2NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
27-11-2019View Document3
Zoning Plan26-11-2019View Document
4AGREEMENT FOR SALE26-11-2019
View Document5DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
26-11-2019View Document6
Service Plans Showing The Services On The Layout Plan26-11-2019View Document
7IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN26-11-2019
View Document8IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN
27-11-2019View Document9
Copy Of License Along With Schedule Of Land26-11-2019View Document
10A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS26-11-2019
View Document11BALANCE SHEET
26-11-2019View Document12
Cash Flow Statement Of The Proposed Project28-11-2019View Document
13DEMARCATION PLAN28-11-2019
View DocumentI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Documents Uploaded After RegistrationSr. No.Document Description
Date of Document UploadView Document1
Occupation Certificate17-07-2024View Document
2Completion Certificate18-10-2024
View DocumentI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________

Facilities in the service plan

FacilityEstimated costStatus
Total Estimated Cost Of Project₹ 102.5 CrAs Per Project Report

Statutory approvals

ApprovalStatusDate
Airports Authority Of IndiaAlready Been Obtained2 May 2014
Environmental ClearanceAlready Been Obtained24 Dec 2013
Fire ApprovalAlready Been Obtained18 Sep 2019
Haryana State Pollution ControlAlready Been Obtained22 Feb 2014
Forest NocAlready Been Obtained14 Jun 2013
Aravali NocAlready Been Obtained10 Jul 2013
Sewage NocAlready Been Obtained23 Oct 2013
Electric NocAlready Been Obtained7 Oct 2019

Specifications (as filed)

Flooring Details Of Various Parts Of HouseTiles & Stone In Common Area
Wall Finishing DetailsPaint In Common Area
Kitchen DetailsAs Per Project Wherever As Applicable
Bathroom FittingsDuravit/Grohe/Vitra In Common Area
Wood Work EtcPly/ Laminate In Common Area
Doors And Windos FramesAluminium /Wooden In Common Area
Glass WorkAs Per Project, Wherever As Applicable
Electric FittingsAs Per Project ,Wherever As Applicable
Conducting And Wiring DetailsPolycab Wire In Common Area
Water StorageOverhead & Under Ground Water Tank In Common Area
Lift Details12 Lifts
External GlazingsAluminium With Toughened Glass Wherever As Applicable
Windows/GlazingsAluminium Wherever As Applicable
DoorsAluminium Wherever As Applicable
Main DoorsWooden Wherever As Applicable
Internal DoorsWooden Wherever As Applicable
Air ConditioningChillers/Split-Ac Wherever As Applicable
Electrical FittingsAs Per Project , Wherever As Applicable
Provision Of Wifi And Broadband FacilityAs Per Project Wherever As Applicable
External Finishing/Colour SchemeTexture Paint In Common Area
Internal FinishingPop/Wooden/Paint Wherever As Applicable

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Sapphire Ninety?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.