Phonex Mall
by M-City Infrastructure Private Limited · Phonex Mall, Sector - 20, Rewari
- RERA registration
- HRERA-PKL-RWR-459-2023 Lapsed Project
- Valid till
- 31 Dec 2024
- Project ID
- RERA-PKL-1177-2022
- Estimated cost
- ₹ 74.5 Cr
RERA registration
| Registration certificate | HRERA-PKL-RWR-459-2023 Lapsed Project |
|---|---|
| Registration valid till | 31 Dec 2024 |
| Project ID | RERA-PKL-1177-2022 |
| Authority | HRERA Panchkula |
| Project type (as filed) | Ongoing |
| Project name | Phonex Mall |
| Promoter | M-City Infrastructure Private Limited |
| Promoter’s registered office | 92B , Block Bw , Shalimar Bagh , West New Delhi , 110088 |
| CIN | U45400DL2007PTC162635 |
| Site address | Phonex Mall, Sector - 20, Rewari |
| Sector | Sector 20 |
| Tehsil / District | Rewari / Rewari |
| Application submitted | 24 Dec 2022 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Panchkula
-
Hearing
Examination By Authority View order
Proceedings
Adjourned to 27.02.2023.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 13.03.2023.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 29.05.2023
-
Hearing
Adjournment View order
Proceedings
Adjourned to 15.05.2023
-
Hearing
Approved And Ready For Certificate Issuing Process View order
Proceedings
Approved and ready for certificate issuing Process
- Registration valid till
Land, licence & cost
| Licence | 18 of 2009 |
|---|---|
| FAR permissible / proposed | 1.5 / 1.47 |
| Estimated project cost | ₹ 74.5 Cr |
| Cost of land | ₹ 0.45 Cr |
| Infrastructure and other structures | ₹ 45.41 Cr |
| EDC, taxes, levies and other costs | ₹ 28.64 Cr |
How the land will be used
| Use | Area (as filed) | Share |
|---|---|---|
| Construction Of Roads | 404.68 | 53.1% |
| Vehicle Parkings | 230 | 30.2% |
| Shops Number And Size Of Shops May Wary Considering The Market Conditions | 128 | 16.8% |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | No | WATER SUPPLY |
| No | ELECTRICITY | No |
| Sewage Disposal | No | STORM WATER DRAINAGE |
| No | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: | Sr. No. |
| Name of the facility | Estimated cost (In Lakhs)(Within the project area only) | Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) |
| 1 | INTERNAL ROADS AND PAVEMENTS | 62.46 |
| Submitted To HUDA | 2 | WATER SUPPLY SYSTEM |
| 128.62 | SUBMITTED TO HUDA | 3 |
| Storm Water Drainage | 27.62 | SUBMITTED TO HUDA |
| 4 | ELECTRICITY SUPPLY SYSTEM | 0 |
| Yet To Be Prepared | 5 | SEWAGE TREATMENT & GARBAGE DISPOSAL |
| 39.9 | SUBMITTED TO HUDA | 6 |
| Street Lighting | 7.67 | SUBMITTED TO HUDA |
| 7 | SECURITY AND FIRE FIGHTING | 9.46 |
| Yet To Be Prepared | 8 | PLAYGROUNDS AND PARKS |
| 0 | YET TO BE PREPARED | 9 |
| Club House/Community Centre | 0 | YET TO BE PREPARED |
| 10 | SHOPPING AREA | 0 |
| Yet To Be Prepared | 11 | RENEWABLE ENERGY SYSTEM |
| 0 | YET TO BE PREPARED | 12 |
| School | 0 | YET TO BE PREPARED |
| 13 | HOSPITAL/DISPENSARY | 0 |
| Yet To Be Prepared | 14 | ANY OTHER |
| 0 | YET TO BE PREPARED | 15 |
| Horticulture | 0.73 | SUBMITTED TO HUDA |
| 16 | MAINTENANCE CHARGES | 75.85 |
| Submitted To HUDA | 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. | NA |
| (date) | 6. Date of approval of Building Plans | NA |
| (date) | (i) Details of the plots/apartments in the project: | Sr. No. |
| Plot/ apartment type | Size of the plot/carpet area of the apartments | Total number of plots/apartments in the project |
| Total size of the plots/carpet area of the apartments | Plots/apartments booked/ sold upto the date of application | Yet to be sold/ booked |
| No. of towers to be/ being constructed for booked apartments | 1 | APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS |
| 11350.53 | 128 | 1452867.84 |
| 0 | 0 | 1 |
| Total | 128 | 1452867.84 |
| 0 | 0 | 1 |
| (ii) Apartments/Shops/Other Buildings:- | (a) Status of construction activities in respect of sold/booked apartments. | Type |
| Number of apartments booked/ sold | Write or Annex the stage of construction of the booked/ sold apartments in folder C | SHOPS |
| 0 | NA | (b) Time schedule of completion of already booked apartments: |
| Start Date | 25-04-2011 | Earlier date of completion |
| 31-12-2023 | Revised date of completion | 31-12-2023 |
| (c) Time schedule for development of infrastructure: | Start Date | 01-01-2023 |
| Percentage completion Upto the | date of application | 47 |
| Projected date of completion | 31-12-2023 | (d) Provide further details in the proforma REP-I Part-C-X. |
| (e) Plan of action for completing the Project along with requisite infrastructure. | (iii) Status in respect of plotted colony:- | (a) |
| Plots | Booked/sold | Stage of handing over the possession (Write or Annex details) |
| Plot | 0 | 0 |
| (b) Schedule for development of Infrastructure: | Start Date | 25-04-2011 |
| Percentage completion | 47 | Projected date of completion |
| 31-12-2023 | (c) Provide further details in the proforma REP-I Part-C-X. | (d) Schedule of completing the project and handing over possession of the plots. |
| (iv) Vehicle parkings details of the project- | a) Underground parking | 184 |
| b) Stilt parking | 0 | c) Covered parking |
| 0 | d) Open parking | 46 |
| e) Independent garages | 0 | (v) Quarterly schedule of development of whole/remaining part of the project: |
| (a) Apartments/Shops/Other Buildings | Expenditure incurred till the date of application (In Lakhs) | Particulars |
| Expenditure | Apartments | 0 |
| Shops | 0 | Plots |
| 0 | Expenditure to be made in each quarter (In Lakhs) | Particulars |
| Expenditure to be made in each quarter ( | ) | Apr-June |
| July-Sep | Oct-Dec | Jan-Mar |
| (b) Infrastructure | Expenditure incurred till the date of application (In Lakhs) | Particulars |
| Expenditure | Expenditure to be made in each quarter (In Lakhs) | Particulars |
| Year-2023 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Roads & Pavements |
| 0 | Water Supply System | 0 |
| Sewerage treatment & garbage disposal | 0 | Electricity Supply System |
| 0 | Storm Water Drainage | 0 |
| Parks and Playgrounds | 0 | Clubhouse/community centres |
| 0 | Shopping area | 0 |
| Other | 0 | CONSTRUCTION |
| 318 | OTHER EXPENDITURE | 127 |
| It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - C-X |
| 1.Financial information: | Particulars | Remarks, if any |
| i. No. of Flats/Apartments constructed | 0 | ii. No. of Flats/ Apartments booked |
| 0 | iii. Total amount sale value of booked Flats, on the date of application/end of last quarter | 0 Lakhs |
| iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter | 0 Lakhs | v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter |
| 0 Lakhs | vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter | 0 Lakhs |
| vii. Amount invested in the project upto the date of application | 2700 Lakhs | Land cost (If any) |
| 45 Lakhs | LAND COST | Apartments |
| 0 Lakhs | Infrastructure | 2141 Lakhs |
| Development Cost | EDC/ Taxes Etc. | 514 Lakhs |
| Others | viii. Balance cost to be incurred for completion of the project and delivery of possession | 4750 Lakhs |
| Balance Cost Till End Of Project | (a) In respect of existing allottees | 0 Lakhs |
| (b) In respect of rest of the project | 4750 Lakhs | ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project |
| Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C | 487 Lakhs | INDIABULLS COMMERCIAL CREDIT LTD |
| x. Total liabilities against the project up-to-date. (Annex details in folder C) | 487 Lakhs | COMMERCIAL CREDIT LTD |
| 2.Additional information: | Particulars | Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs) |
| Actual expenditure incurred upto the date of application. (In Lakhs) | I. INTERNAL ROADS AND PAVEMENTS | 62.46 |
| 32 | II. WATER SUPPLY SYSTEM | 138.08 |
| 101 | III. STORM WATER DRAINAGE | 27.62 |
| 20 | IV. ELECTRICITY SUPPLY SYSTEM | 0 |
| 0 | V. SEWAGE TREATMENT & GARBAGE DISPOSAL | 39.9 |
| 0 | VI. CLUB HOUSE/COMMUNITY CENTRE | 0 |
| 0 | VII. SCHOOL | 0 |
| 0 | VIII. ANY OTHER | 0 |
| 0 | IX. SOLID WASTE COLLECTION & MGMT SYSTEM | 0 |
| 0 | X. CLUBHOUSE | 0 |
| 0 | XI. NEIGHBOURHOOD SHOPPING | 0 |
| 0 | XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC. | 0 |
| 0 | XIII. COVERED PARKING | 0 |
| 0 | XIV. OPEN PARKING | 0 |
| 0 | XV. GARAGES | 0 |
| 0 | XVI. SECURITY SYSTEM | 0 |
| 0 | XVII. OTHER FACILITIES AS PER PROJECT REPORT | 0 |
| 0 | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - D | Accounts related information: |
| 1. Annex copy of the balance sheet of last 3 years | No | 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. |
| Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form. | No | 3. Bank account to which the deposits received from apartment buyers will be credited |
| Bank and Branch address | SBM BANK INDIA LIMITED, SHOP NO 4, DLF CAPITOL BUILDING, BABA KHARAK SINGH MARG, CONNAUGHT PLACE NEW DELHI 1100 | Bank Account number |
| 20052214257989 | IFSC code | STCB0000065 |
| MICR code | STCB0000065 | Branch code |
| STCB0000065 | 4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority) | Rakesh Dabas and Purnima Singh |
| 5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details) | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - E | Details of the statutory approvals: |
| 1. Annex copies of the following in Folder E: | i. Lay out Plan | Yes |
| ii. Demarcation Plan | No | iii. Zoning Plan |
| Yes | iv. Building Plan | Yes |
| Site Plan | Yes | Floor Plan |
| Yes | Apartment Plans | No |
| Elevation Section | Yes | Detail of Permissible FAR |
| Yes | Detail of covered area achieved FAR | Yes |
| 2. Annex copies of the following in Folder E: | I. ROADS AND PAVEMENT PLAN | Yes |
| II. Electricity Supply Plan | No | III. WATER SUPPLY PLAN |
| Yes | IV. SEWERAGE AND GARBAGE DISPOSAL PLAN | Yes |
| V. Strom Water Drainage | Yes | VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY |
| No | VII. STREET LIGHTING PLAN | Yes |
| Viii. Parking Plan | Yes | 3. Statutory Approvals Status |
| Statutory Approvals | Statutory Approvals Status | Date |
| I. Renewal License No-18 | ALREADY BEEN OBTAINED | 09-11-2022 |
| It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees. | Signature _____________ | Seal _____________ |
| Date _____________ | FORM REP-I | Part - F |
| 1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers. | (Annex a copy in Folder F) | Yes |
| 2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules) | (Annex a copy in Folder F) | No |
| 3. Gist of the important provisions of the Draft Agreement | (Annex a copy in Folder F) | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - G |
| Projects launched by the promoter in last five years: (No Projects) | I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - H | SPECIFICATION OF CONSTRUCTION | Specification of apartments and other buildings including the following: |
| 1 | FLOORING DETAILS OF VARIOUS PARTS OF HOUSE | NA |
| 2 | WALL FINISHING DETAILS | NA |
| 3 | KITCHEN DETAILS | NA |
| 4 | BATHROOM FITTINGS | NA |
| 5 | WOOD WORK ETC | NA |
| 6 | DOORS AND WINDOS FRAMES | NA |
| 7 | GLASS WORK | NA |
| 8 | ELECTRIC FITTINGS | NA |
| 9 | CONDUCTING AND WIRING DETAILS | NA |
| 10 | CUPBOARD DETAILS | NA |
| 11 | WATER STORAGE | NA |
| 12 | LIFT DETAILS | NA |
| 13 | EXTERNAL GLAZINGS | NA |
| 13.1 | WINDOWS/GLAZINGS | NA |
| 14 | DOORS | NA |
| 14.1 | MAIN DOORS | NA |
| 14.2 | INTERNAL DOORS | NA |
| 15 | AIR CONDITIONING | NA |
| 16 | ELECTRICAL FITTINGS | NA |
| 17 | CNG PIPE LINE | NA |
| 18 | PROVISION OF WIFI AND BROADBAND FACILITY | NA |
| 19 | EXTERNAL FINISHING/COLOUR SCHEME | NA |
| 20 | INTERNAL FINISHING | NA |
| Specification Unit Wise | 1 . LIVING/DINING/FOYER/FAMILY LOUNGE | 1 . 1 |
| Floor | NA | 1 . 2 |
| Walls | NA | 1 . 3 |
| Ceiling | NA | 2 . MASTER BEDROOM/DRESSROOM |
| 2 . 1 | FLOOR | NA |
| 2 . 2 | WALLS | NA |
| 2 . 3 | CEILING | NA |
| 2 . 4 | MODULAR WARDROBES | NA |
| 3 . Master Toilet | 3 . 1 | FLOOR |
| Na | 3 . 2 | WALLS |
| Na | 3 . 3 | CEILING |
| Na | 3 . 4 | COUNTERS |
| Na | 3 . 5 | SANITARY WARE/CP FITTINGS |
| Na | 3 . 6 | FITTING/FIXTURES |
| Na | 4 . BED ROOMS | 4 . 1 |
| Floor | NA | 4 . 2 |
| Walls | NA | 4 . 3 |
| Ceiling | NA | 4 . 4 |
| Wardrobes | NA | 5 . TOILET |
| 5 . 1 | FLOOR | NA |
| 5 . 2 | WALLS | NA |
| 5 . 3 | CEILING | NA |
| 5 . 4 | COUNTERS | NA |
| 5 . 5 | SANITARY WARE/CP FITTINGS | NA |
| 5 . 6 | FIXTURES | NA |
| 6 . Kitchen | 6 . 1 | FLOOR |
| Na | 6 . 2 | WALLS |
| Na | 6 . 3 | CEILING |
| Na | 6 . 4 | COUNTERS |
| Na | 6 . 5 | FIXTURES |
| Na | 6 . 6 | KITCHEN APPLIANCES |
| Na | 7 . UTILITY ROOMS/UTILITY BALCONY/TOILET | 7 . 1 |
| Floor | NA | 7 . 2 |
| Walls & Ceiling | NA | 7 . 3 |
| Toilet | NA | 7 . 4 |
| Balcony | NA | 8 . SIT-OUTS |
| 8 . 1 | FLOOR | NA |
| 8 . 2 | WALLS & CEILING | NA |
| 8 . 3 | RAILINGS | NA |
| 8 . 4 | FIXTURES | NA |
| I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | List of Uploaded Documents |
| Sr. No. | Document Description | Date of Document Upload |
| View Document | 1 | DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD |
| 25-11-2022 | View Document | 2 |
| A Complete Set Of The Last Approved Building Plans | 23-12-2022 | View Document |
| 3 | DEMARCATION PLAN | 23-12-2022 |
| View Document | 4 | NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT |
| 23-12-2022 | View Document | 5 |
| Certificate From A Chartered Accountant Certifying That The Informstion Provided By The Applicant In Form Rep-1-C-X Is Correct As Per The Books Of Accounts/ Balance Sheet Of The Applicant | 23-12-2022 | View Document |
| 6 | COPY OF LICENSE ALONG WITH SCHEDULE OF LAND | 23-12-2022 |
| View Document | 7 | IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN |
| 23-12-2022 | View Document | 8 |
| Service Plans Showing The Services On The Layout Plan | 23-12-2022 | View Document |
| 9 | ZONING PLAN | 23-12-2022 |
| View Document | 10 | CASH FLOW STATEMENT OF THE PROPOSED PROJECT |
| 23-12-2022 | View Document | 11 |
| In Case Of Plotted Colony, The Latest Layout Plan | 23-12-2022 | View Document |
| 12 | DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. | 23-12-2022 |
| View Document | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Documents Uploaded After Registration | Sr. No. | Document Description |
| Date of Document Upload | View Document | 1 |
| Extension | 04-06-2024 | View Document |
| 2 | CORRIGENDUM | 04-06-2024 |
| View Document | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 62.46 lakh | Submitted To HUDA |
| Water Supply System | ₹ 1.29 Cr | Submitted To HUDA |
| Storm Water Drainage | ₹ 27.62 lakh | Submitted To HUDA |
| Sewage Treatment & Garbage Disposal | ₹ 39.9 lakh | Submitted To HUDA |
| Street Lighting | ₹ 7.67 lakh | Submitted To HUDA |
| Security And Fire Fighting | ₹ 9.46 lakh | Yet To Be Prepared |
| Horticulture | ₹ 0.73 lakh | Submitted To HUDA |
| Maintenance Charges | ₹ 75.85 lakh | Submitted To HUDA |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Renewal License No-18 | Already Been Obtained | 9 Nov 2022 |
Source: HRERA Panchkula, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.