RERA applied, not grantedHRERA Gurugram

Phase -V ,(Block T7 - Tower G1, G2 & G3)

by Sare Gurugramprivate Limited · Sector-92

RERA registration
Applied, not granted yet
Applied on
6 Dec 2022
Application status
Physical Docs Received
Project ID
RERA-GRG-1231-2022
Estimated cost
₹ 126.91 Cr

This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.

RERA registration

Registration certificateNot issued yet: the application is being processed by HRERA Gurugram
Project IDRERA-GRG-1231-2022
AuthorityHRERA Gurugram
Project type (as filed)Ongoing
Project namePhase -V ,(Block T7 - Tower G1, G2 & G3)
PromoterSare Gurugramprivate Limited
Promoter’s registered officeKgk-Dhoot CONSORTIUM904 - 907, Time Tower,Mg Road, Gurugramharyana - 122002
CINU70109DL2006PTC152635
Site addressSector-92
SectorSector 92
Tehsil / DistrictGurgaon / Gurugram
Layout plan approved21 Oct 2011
Building plans approved6 Oct 2022
Application submitted6 Dec 2022

Authority, hearings & orders

Current statusPhysical Docs Received
Next hearingNot Required
  1. Application submitted online

Land, licence & cost

Licence44 of 2009(12-08-2024),68 of 2011(20-07-2024)
FAR permissible / proposed175 / 175
Estimated project cost₹ 126.91 Cr
Cost of land₹ 34.24 Cr
Cost of construction₹ 60.28 Cr
Infrastructure and other structures₹ 12.21 Cr
EDC, taxes, levies and other costs₹ 20.18 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments39,211.61100%

External services

ServiceProvided byApproval taken
RoadsYesWATER SUPPLY
YesELECTRICITYYes
Sewage DisposalYesSTORM WATER DRAINAGE
Yes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:Sr. No.
Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS80.19
Yet To Be Prepared2WATER SUPPLY SYSTEM
0YET TO BE PREPARED3
Storm Water Drainage0YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM297.26
Yet To Be Prepared5SEWAGE TREATMENT & GARBAGE DISPOSAL
0YET TO BE PREPARED6
Street Lighting77.64YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING171.88
Yet To Be Prepared8PLAYGROUNDS AND PARKS
0YET TO BE PREPARED9
Club House/Community Centre0YET TO BE PREPARED
10SHOPPING AREA0
Yet To Be Prepared11RENEWABLE ENERGY SYSTEM
0YET TO BE PREPARED12
School0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0
Yet To Be Prepared14ANY OTHER
0YET TO BE PREPARED15
Electrical Sub Station297.26YET TO BE PREPARED
16ELECTRIFICATION COST297.26
Yet To Be Prepared5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.21-10-2011
(date)6. Date of approval of Building Plans06-10-2022
(date)(i) Details of the plots/apartments in the project:Sr. No.
Plot/ apartment typeSize of the plot/carpet area of the apartmentsTotal number of plots/apartments in the project
Total size of the plots/carpet area of the apartmentsPlots/apartments booked/ sold upto the date of applicationYet to be sold/ booked
No. of towers to be/ being constructed for booked apartments1APARTMENT/SHOPS/OTHER BUILDINGS Type
000
000
Total00
000
(ii) Apartments/Shops/Other Buildings:-(a) Status of construction activities in respect of sold/booked apartments.Type
Number of apartments booked/ soldWrite or Annex the stage of construction of the booked/ sold apartments in folder CG1
7750% TO 60%G2
8350% TO 60%G3
7550% TO 60%(b) Time schedule of completion of already booked apartments:
Start Date01-10-2022Earlier date of completion
30-09-2026Revised date of completion30-09-2026
(c) Time schedule for development of infrastructure:Start Date01-10-2022
Percentage completion Upto the   date of application55
Projected date of completion30-09-2026(d) Provide further details in the proforma REP-I Part-C-X.
(e) Plan of action for completing the Project along with requisite infrastructure.(iii) Status in respect of plotted colony:-(a)
PlotsBooked/soldStage of handing over the possession (Write or Annex details)
Plot00
(b) Schedule for development of Infrastructure:Start Date01-10-2022
Percentage completion50Projected date of completion
30-09-2026(c) Provide further details in the proforma REP-I Part-C-X.(d) Schedule of completing the project and handing over possession of the plots.
(iv) Vehicle parkings details of the project-a) Underground parking303
b) Stilt parking8c) Covered parking
0d) Open parking115
e) Independent garages0(v) Quarterly schedule of development of whole/remaining part of the project:
(a) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureApartments61
Shops0Plots
0Expenditure to be made in each quarter (In Lakhs)Particulars
Year-2023Jan-MarApr-June
July-SepOct-DecApartments
902.13902.13902.13
902.13Shops0
000
Plots00
00Particulars
Year-2024Jan-MarApr-June
July-SepOct-DecApartments
902.13902.13902.13
902.13Shops0
000
Plots00
00Particulars
Year-2025Jan-MarApr-June
July-SepOct-DecApartments
902.13902.13902.13
902.13Shops0
000
Plots00
00Particulars
Year-2026Jan-MarApr-June
July-SepOct-DecApartments
902.13902.13Shops
00Plots
00(b) Infrastructure
Expenditure incurred till the date of application (In Lakhs)ParticularsExpenditure
Roads & Pavements0Water Supply System
0Sewerage treatment & garbage disposal0
Electricity Supply System0Storm Water Drainage
0Parks and Playgrounds0
Clubhouse/community centres0Shopping area
0Other0
Expenditure to be made in each quarter (In Lakhs)ParticularsYear-2025
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements16.04
16.0416.04Water Supply System
000
Sewerage treatment & garbage disposal00
0Electricity Supply System59.45
59.4559.45Storm Water Drainage
000
Parks and Playgrounds00
0Clubhouse/community centres0
00Shopping area
000
Other168.81168.81
168.81ParticularsYear-2026
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements16.04
16.04Water Supply System0
0Sewerage treatment & garbage disposal0
0Electricity Supply System59.45
59.45Storm Water Drainage0
0Parks and Playgrounds0
0Clubhouse/community centres0
0Shopping area0
0Other168.81
168.81It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - C-X1.Financial information:Particulars
Remarks, if anyi. No. of Flats/Apartments constructed275
ii. No. of Flats/ Apartments booked235iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
15520 Lakhsiv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter0 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter15520 Lakhsvi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
15520 Lakhsvii. Amount invested in the project upto the date of application60.92 Lakhs
Land cost (If any)0 LakhsApartments
60.92 LakhsInfrastructure0 Lakhs
EDC/ Taxes Etc.0 Lakhsviii. Balance cost to be incurred for completion of the project and delivery of possession
12629.81 Lakhs(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project12629.81 Lakhsix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C0 Lakhsx. Total liabilities against the project up-to-date. (Annex details in folder C)
0 Lakhs2.Additional information:Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)I. INTERNAL ROADS AND PAVEMENTS
80.190II. WATER SUPPLY SYSTEM
00III. STORM WATER DRAINAGE
00IV. ELECTRICITY SUPPLY SYSTEM
297.260V. SEWAGE TREATMENT & GARBAGE DISPOSAL
00VI. CLUB HOUSE/COMMUNITY CENTRE
00VII. SCHOOL
00VIII. ANY OTHER
672.150IX. SOLID WASTE COLLECTION & MGMT SYSTEM
00X. CLUBHOUSE
00XI. NEIGHBOURHOOD SHOPPING
00XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
00XIII. COVERED PARKING
00XIV. OPEN PARKING
00XV. GARAGES
00XVI. SECURITY SYSTEM
171.880XVII. OTHER FACILITIES AS PER PROJECT REPORT
00I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - D
Accounts related information:1. Annex copy of the balance sheet of last 3 yearsNo
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
3. Bank account to which the deposits received from apartment buyers will be creditedBank and Branch addressYES BANK LTD, GROUND FLOOR, SHOPNO 3,4,5 AMARKUN, SHAHIBAUG,AHMEDABAD
Bank Account number042072400000032IFSC code
YESB0000420MICR code380532011
Branch code0004204. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
CA Ajit Gyanchand Jain5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - E
Details of the statutory approvals:1. Annex copies of the following in Folder E:i. Lay out Plan
Yesii. Demarcation PlanYes
iii. Zoning PlanYesiv. Building Plan
YesSite PlanYes
Floor PlanYesApartment Plans
YesElevation SectionYes
Detail of Permissible FARYesDetail of covered area achieved FAR
Yes2. Annex copies of the following in Folder E:I. ROADS AND PAVEMENT PLAN
YesII. ELECTRICITY SUPPLY PLANYes
III. Water Supply PlanYesIV. SEWERAGE AND GARBAGE DISPOSAL PLAN
YesV. STROM WATER DRAINAGEYes
Vi. 10% Land To Be Transferred To The Govt. For Community FacilityYesVII. STREET LIGHTING PLAN
YesVIII. PARKING PLANYes
3. Statutory Approvals StatusStatutory ApprovalsStatutory Approvals Status
DateI. RECEIVEDALREADY BEEN OBTAINED
NaIt is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________
Seal _____________Date _____________FORM REP-I
Part - F1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)
No2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)
No3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - GProjects launched by the promoter in last five years: (No Projects)I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - HSPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:1FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
Virtified Tiles Ceramic Kota Stone2WALL FINISHING DETAILS
Virtified Tiles Ceramic3KITCHEN DETAILS
Vitrified Tile Obd Flush Door4BATHROOM FITTINGS
Vitrified Tile Obd Flush Door5WOOD WORK ETC
Na6DOORS AND WINDOS FRAMES
Flush Door 30 Mm7GLASS WORK
Power Coated Cleaning Glass 35MM8ELECTRIC FITTINGS
Copper WIRE1.5 Sq Mm 5 Pair Wire Coaxial Cablecopper Wire Copper Wire 4 Sq Mm9CONDUCTING AND WIRING DETAILS
Copper WIRE1.5 Sq Mm 5 Pair Wire Coaxial Cablecopper Wire Copper Wire 4 Sq Mm10CUPBOARD DETAILS
Na11WATER STORAGE
Na12LIFT DETAILS
P1 To P6 "3" Flat/Floor T15 & T16 "6" Flat/Floor 16LIFTS13EXTERNAL GLAZINGS
Powder Coated Alum/Clea Ning Glass Smm13.1WINDOWS/GLAZINGS
Powder Coated Alum/Clea Ning Glass Smm14DOORS
Flush DOOR25 Mm14.1MAIN DOORS
Skin Door14.2INTERNAL DOORS
Flush Door15AIR CONDITIONING
Na16ELECTRICAL FITTINGS
Na17CNG PIPE LINE
Na18PROVISION OF WIFI AND BROADBAND FACILITY
Na19EXTERNAL FINISHING/COLOUR SCHEME
Na20INTERNAL FINISHING
NaSPECIFICATION UNIT WISE1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1FLOORVITRIFIED TILE
1 . 2WALLSOBD
1 . 3CEILINGOBD
2 . Master Bedroom/Dressroom2 . 1FLOOR
Vitrified Tile2 . 2WALLS
Obd2 . 3CEILING
Obd2 . 4MODULAR WARDROBES
Na3 . MASTER TOILET3 . 1
FloorCERAMIC TILES3 . 2
WallsCERAMIC TILES3 . 3
CeilingOBD3 . 4
CountersFLUSH DOOR 30 MM3 . 5
Sanitary Ware/Cp FittingsSTAINLESS STEEL CHINAWARE CROME PLATTED3 . 6
Fitting/FixturesCROME PLATTED4 . BED ROOMS
4 . 1FLOORVITRIFIED TILE
4 . 2WALLSOBD
4 . 3CEILINGOBD
4 . 4WARDROBESNA
5 . Toilet5 . 1FLOOR
"Ceramic Tiles"5 . 2WALLS
Obd5 . 3CEILING
Obd5 . 4COUNTERS
Na5 . 5SANITARY WARE/CP FITTINGS
Chinaware5 . 6FIXTURES
Chinaware6 . KITCHEN6 . 1
FloorVITRIFIED TILE6 . 2
WallsOBD6 . 3
CeilingOBD6 . 4
CountersGRANITE COUNTER6 . 5
FixturesNA6 . 6
Kitchen AppliancesNA7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1FLOORCERAMIC TILES
7 . 2WALLS & CEILINGOBD
7 . 3TOILETCERAMIC TILES
7 . 4BALCONYCERAMIC TILES
8 . Sit-Outs8 . 1FLOOR
Na8 . 2WALLS & CEILING
Na8 . 3RAILINGS
Ms8 . 4FIXTURES
NaI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
List of Uploaded DocumentsSr. No.Document Description
Date of Document UploadView Document1
In Case Of Group Housing/ Commercial Sites, A Copy Of The Approved Site Plan06-12-2022View Document
2ZONING PLAN06-12-2022
View Document3DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
06-12-2022View Document4
Copy Of License Along With Schedule Of Land06-12-2022View Document
5SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN06-12-2022
View Document6DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD
06-12-2022View Document7
Demarcation Plan06-12-2022View Document
8A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS06-12-2022
View Document9CASH FLOW STATEMENT OF THE PROPOSED PROJECT
06-12-2022View Document10
Certificate From A Chartered Accountant Certifying That The Informstion Provided By The Applicant In Form Rep-1-C-X Is Correct As Per The Books Of Accounts/ Balance Sheet Of The Applicant06-12-2022View Document
11IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN06-12-2022
View Document12NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
06-12-2022View DocumentI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 80.19 lakhYet To Be Prepared
Electricity Supply System₹ 2.97 CrYet To Be Prepared
Street Lighting₹ 77.64 lakhYet To Be Prepared
Security And Fire Fighting₹ 1.72 CrYet To Be Prepared
Electrical Sub Station₹ 2.97 CrYet To Be Prepared
Electrification Cost₹ 2.97 CrYet To Be Prepared

Statutory approvals

ApprovalStatusDate
ReceivedAlready Been Obtained

Specifications (as filed)

Flooring Details Of Various Parts Of HouseVirtified Tiles Ceramic Kota Stone
Wall Finishing DetailsVirtified Tiles Ceramic
Kitchen DetailsVitrified Tile Obd Flush Door
Bathroom FittingsVitrified Tile Obd Flush Door
Doors And Windos FramesFlush Door 30 Mm
Glass WorkPower Coated Cleaning Glass 35MM
Electric FittingsCopper WIRE1.5 Sq Mm 5 Pair Wire Coaxial Cablecopper Wire Copper Wire 4 Sq Mm
Conducting And Wiring DetailsCopper WIRE1.5 Sq Mm 5 Pair Wire Coaxial Cablecopper Wire Copper Wire 4 Sq Mm
Lift DetailsP1 To P6 "3" Flat/Floor T15 & T16 "6" Flat/Floor 16LIFTS
External GlazingsPowder Coated Alum/Clea Ning Glass Smm
Windows/GlazingsPowder Coated Alum/Clea Ning Glass Smm
DoorsFlush DOOR25 Mm
Main DoorsSkin Door
Internal DoorsFlush Door

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Phase -V ,(Block T7 - Tower G1, G2 & G3)?

This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.