Registration period overHRERA GurugramOC / CC on record

Paras Square

by Blackberry Realcon Pvt. Ltd. · Sector 63-A, Gurugram

RERA registration
GGM/281/2018/13
Registered on
6 Sep 2018
Valid till
31 Dec 2018
Project ID
RERA-GRG-437-2019
Land area
2.2 acres
Estimated cost
₹ 156 Cr

RERA registration

Registration certificateGGM/281/2018/13, dated 6 Sep 2018
Registration valid till31 Dec 2018
Project IDRERA-GRG-437-2019
AuthorityHRERA Gurugram
Project type (as filed)Ongoing
Project nameParas Square
PromoterBlackberry Realcon Private Limited
Promoter’s registered office11TH Floor, Paras Twin Tower Golf Course Road, Sector-54 Gurgaon 122002 Hr
CINU70101DL2011PTC224577
Site addressSector-63A, Gurgaon
SectorSector 63
Tehsil / DistrictGurgaon / Gurugram
Application submitted14 Jan 2020

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Next hearingNot Required
  1. Registration granted GGM/281/2018/13
  2. Registration valid till
  3. Application submitted online
  1. Application received by HRERA Gurugram

Land, licence & cost

Land area of the project2.2 acres
Total licensed area2.2 acres
Licence23 OF 2013
FAR permissible / proposed3.84 / 3.84
Estimated project cost₹ 156 Cr
Cost of land₹ 0 Cr
Infrastructure and other structures₹ 75.06 Cr

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
NoELECTRICITYNo
Sewage DisposalNoSTORM WATER DRAINAGE
No4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:Sr. No.
Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS58.96
Yet To Be Prepared2WATER SUPPLY SYSTEM
131.75YET TO BE PREPARED3
Storm Water Drainage24.45YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM0
Yet To Be Prepared5SEWAGE TREATMENT & GARBAGE DISPOSAL
49.02YET TO BE PREPARED6
Street Lighting4.18YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0
Yet To Be Prepared8PLAYGROUNDS AND PARKS
69.75YET TO BE PREPARED9
Club House/Community Centre0YET TO BE PREPARED
10SHOPPING AREA0
Yet To Be Prepared11RENEWABLE ENERGY SYSTEM
0YET TO BE PREPARED12
School0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0
Yet To Be Prepared14ANY OTHER
0YET TO BE PREPARED5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.
Na(date)6. Date of approval of Building Plans
Na(date)(i) Details of the plots/apartments in the project:
Sr. No.Plot/ apartment typeSize of the plot/carpet area of the apartments
Total number of plots/apartments in the projectTotal size of the plots/carpet area of the apartmentsPlots/apartments booked/ sold upto the date of application
Yet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments1
APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL52985.31174
9219443.941686
02APARTMENT/SHOPS/OTHER BUILDINGS Type STUDIO 870
1892044832480
30140
3APARTMENT/SHOPS/OTHER BUILDINGS Type 2BR (1225)0
402
224
APARTMENT/SHOPS/OTHER BUILDINGS Type STUDIO 8002303.9231
71421.521516
05APARTMENT/SHOPS/OTHER BUILDINGS Type 1BR (975)
5072.4856284058.88
28280
6APARTMENT/SHOPS/OTHER BUILDINGS Type 2BR (1935)907.13
76349.914
30Total
31610413754.25247
692(ii) Apartments/Shops/Other Buildings:-
(a) Status of construction activities in respect of sold/booked apartments.TypeNumber of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C00
(b) Time schedule of completion of already booked apartments:Start Date17-05-2013
Earlier date of completion31-12-2018Revised date of completion
16-05-2019(c) Time schedule for development of infrastructure:Start Date
17-05-2013Percentage completion Upto the   date of application
100Projected date of completion31-12-2018
(d) Provide further details in the proforma REP-I Part-C-X.(e) Plan of action for completing the Project along with requisite infrastructure.(iii) Status in respect of plotted colony:-
(a)PlotsBooked/sold
Stage of handing over the possession (Write or Annex details)PLOT0
0(b) Schedule for development of Infrastructure:Start Date
17-05-2013Percentage completion100
Projected date of completion31-12-2018(c) Provide further details in the proforma REP-I Part-C-X.
(d) Schedule of completing the project and handing over possession of the plots.(iv) Vehicle parkings details of the project-a) Underground parking
0b) Stilt parking0
c) Covered parking0d) Open parking
0e) Independent garages0
(v) Quarterly schedule of development of whole/remaining part of the project:(a) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)
ParticularsExpenditureApartments
0Shops0
Plots0Expenditure to be made in each quarter (In Lakhs)
ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-Dec
Jan-Mar(b) InfrastructureExpenditure incurred till the date of application (In Lakhs)
ParticularsExpenditureRoads & Pavements
0Water Supply System0
Sewerage treatment & garbage disposal0Electricity Supply System
0Storm Water Drainage0
Parks and Playgrounds0Clubhouse/community centres
0Shopping area0
Other0Expenditure to be made in each quarter (In Lakhs)
ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-Dec
Jan-MarIt is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - C-X1.Financial information:Particulars
Remarks, if anyi. No. of Flats/Apartments constructed315
ii. No. of Flats/ Apartments booked225iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
0 Lakhsiv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter0 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter0 Lakhsvi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
0 Lakhsvii. Amount invested in the project upto the date of application0 Lakhs
Land cost (If any)0 LakhsApartments
0 LakhsInfrastructure0 Lakhs
EDC/ Taxes Etc.0 Lakhsviii. Balance cost to be incurred for completion of the project and delivery of possession
0 Lakhs(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhsix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C0 Lakhsx. Total liabilities against the project up-to-date. (Annex details in folder C)
0 Lakhs2.Additional information:Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)I. INTERNAL ROADS AND PAVEMENTS
00II. WATER SUPPLY SYSTEM
00III. STORM WATER DRAINAGE
00IV. ELECTRICITY SUPPLY SYSTEM
00V. SEWAGE TREATMENT & GARBAGE DISPOSAL
00VI. CLUB HOUSE/COMMUNITY CENTRE
00VII. SCHOOL
00VIII. ANY OTHER
00IX. SOLID WASTE COLLECTION & MGMT SYSTEM
00X. CLUBHOUSE
00XI. NEIGHBOURHOOD SHOPPING
00XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
00XIII. COVERED PARKING
00XIV. OPEN PARKING
00XV. GARAGES
00XVI. SECURITY SYSTEM
00XVII. OTHER FACILITIES AS PER PROJECT REPORT
00I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - D
Accounts related information:1. Annex copy of the balance sheet of last 3 yearsNo
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
3. Bank account to which the deposits received from apartment buyers will be creditedBank and Branch addressHDFC BANK LIMITED
Bank Account number05720330001116IFSC code
HDFC0000572MICR code110240366
Branch code00005724. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
Blackberry Realcon Private Limited5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes
FCA Shilpa GuptaI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - EDetails of the statutory approvals:
1. Annex copies of the following in Folder E:i. Lay out PlanNo
ii. Demarcation PlanNoiii. Zoning Plan
Noiv. Building PlanNo
Site PlanYesFloor Plan
NoApartment PlansNo
Elevation SectionNoDetail of Permissible FAR
YesDetail of covered area achieved FARYes
2. Annex copies of the following in Folder E:I. ROADS AND PAVEMENT PLANNo
II. Electricity Supply PlanNoIII. WATER SUPPLY PLAN
NoIV. SEWERAGE AND GARBAGE DISPOSAL PLANNo
V. Strom Water DrainageNoVI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY
NoVII. STREET LIGHTING PLANNo
Viii. Parking PlanNo3. Statutory Approvals Status
Statutory ApprovalsStatutory Approvals StatusDate
I. License Copy Lc-V Issued Bt DtcpALREADY BEEN OBTAINED17-05-2013
II. Renewal Of License No. 23 Of 2013ALREADY BEEN OBTAINED16-10-2017
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________Seal _____________
Date _____________FORM REP-IPart - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)Yes
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)Yes
3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - G
Projects launched by the promoter in last five years: (No Projects)I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - HSPECIFICATION OF CONSTRUCTIONSpecification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENA
2WALL FINISHING DETAILSNA
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGNA
Specification Unit Wise1 . LIVING/DINING/FOYER/FAMILY LOUNGE1 . 1
FloorNA1 . 2
WallsNA1 . 3
CeilingNA2 . MASTER BEDROOM/DRESSROOM
2 . 1FLOORNA
2 . 2WALLSNA
2 . 3CEILINGNA
2 . 4MODULAR WARDROBESNA
3 . Master Toilet3 . 1FLOOR
Na3 . 2WALLS
Na3 . 3CEILING
Na3 . 4COUNTERS
Na3 . 5SANITARY WARE/CP FITTINGS
Na3 . 6FITTING/FIXTURES
Na4 . BED ROOMS4 . 1
FloorNA4 . 2
WallsNA4 . 3
CeilingNA4 . 4
WardrobesNA5 . TOILET
5 . 1FLOORNA
5 . 2WALLSNA
5 . 3CEILINGNA
5 . 4COUNTERSNA
5 . 5SANITARY WARE/CP FITTINGSNA
5 . 6FIXTURESNA
6 . Kitchen6 . 1FLOOR
Na6 . 2WALLS
Na6 . 3CEILING
Na6 . 4COUNTERS
Na6 . 5FIXTURES
Na6 . 6KITCHEN APPLIANCES
Na7 . UTILITY ROOMS/UTILITY BALCONY/TOILET7 . 1
FloorNA7 . 2
Walls & CeilingNA7 . 3
ToiletNA7 . 4
BalconyNA8 . SIT-OUTS
8 . 1FLOORNA
8 . 2WALLS & CEILINGNA
8 . 3RAILINGSNA
8 . 4FIXTURESNA
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________List of Uploaded Documents
Sr. No.Document DescriptionDate of Document Upload
View Document1RERA CERTIFICATE- SQUARE
28-02-2020View Document2
Third Floor Plan28-02-2020View Document
3SERVICE ESTIMATE PLAN-ROAD WORK28-02-2020
View Document4GROUND FLOOR PLAN
28-02-2020View Document5
Site Plan28-02-2020View Document
6FIRST FLOOR PLAN28-02-2020
View Document7AIRPORT CLEARANCE- SQUARE
28-02-2020View Document8
Environment Clearance- Square28-02-2020View Document
9SERVICE ESTIMATE PLAN-STORM WATER28-02-2020
View Document10AREAS
28-02-2020View Document11
Authorized Signatories For Bank- Square28-02-2020View Document
12REP-I PARAS-SQUARE28-02-2020
View Document13SECOND FLOOR PLAN
28-02-2020View Document14
Typical, Terrace, Mumty Plan28-02-2020View Document
15BUILDING PLAN APPROVAL LETTER- SQUARE28-02-2020
View Document16ZONING PLAN
28-02-2020View Document17
Service Estimate Plan-Water Supply28-02-2020View Document
18SECTION- 0228-02-2020
View Document19TOILET DETAILS
28-02-2020View Document20
Loi -Square28-02-2020View Document
21RERA BRIEF SYNOPSIS--SQUARE28-02-2020
View Document22BASEMENT-02 PLAN
28-02-2020View Document23
Demarcation Plan28-02-2020View Document
24SITE PLAN28-02-2020
View Document25SERVICE PLAN ESTIMATES-APPROVAL LETTER
28-02-2020View Document26
Elevation 2 & 428-02-2020View Document
27SERVICE ESTIMATE PLAN-SEWERAGE SCHEME28-02-2020
View Document28FOREST NOC-SQUARE
28-02-2020View Document29
Section-0328-02-2020View Document
30BASEMENT-03 PLAN28-02-2020
View Document31SECTION-01
28-02-2020View Document32
Elevation-0328-02-2020View Document
33BASEMENT AREAS28-02-2020
View Document34ELEVATION-01
28-02-2020View Document35
Lc-IV- Square28-02-2020View Document
36BASEMENT-01 PLAN28-02-2020
View Document37FIRE NOC- SQUARE
28-02-2020View Document38
Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed.14-01-2020View Document
39CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT14-01-2020
View Document40IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN
14-01-2020View Document41
Renewal License Copy14-01-2020View Document
42BUILDER BUYER AGREEMENT14-01-2020
View Document43IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
14-01-2020View Document44
Service Plans Showing The Services On The Layout Plan14-01-2020View Document
45COPY OF LICENSE ALONG WITH SCHEDULE OF LAND14-01-2020
View Document46NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
14-01-2020View Document47
Allottment Letter14-01-2020View Document
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________Documents Uploaded After Registration
Sr. No.Document DescriptionDate of Document Upload
View Document1Occupation Certificate
20-03-2026View Document2
Completion Certificate20-03-2026View Document
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________Print

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 58.96 lakhYet To Be Prepared
Water Supply System₹ 1.32 CrYet To Be Prepared
Storm Water Drainage₹ 24.45 lakhYet To Be Prepared
Sewage Treatment & Garbage Disposal₹ 49.02 lakhYet To Be Prepared
Street Lighting₹ 4.18 lakhYet To Be Prepared
Playgrounds And Parks₹ 69.75 lakhYet To Be Prepared

Statutory approvals

ApprovalStatusDate
License Copy Lc-V Issued Bt DtcpAlready Been Obtained17 May 2013
Renewal Of License No. 23 Of 2013Already Been Obtained16 Oct 2017

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Paras Square?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.