Registration period overHRERA Gurugram

Mvn Athens

by Mvn Infrastructure Pvt Ltd · Sector- 5, Dhaula Road , Sohna

RERA registration
GGM/588/320/2022/63
Registered on
11 Jul 2022
Valid till
29 Sep 2026
Project ID
RERA-GRG-1010-2022
Land area
8.25 acres
Apartments
274 in 2 towers
Completion (as filed)
1 Oct 2025
Estimated cost
₹ 52 Cr

RERA registration

Registration certificateGGM/588/320/2022/63, dated 11 Jul 2022
Registration valid till29 Sep 2026
Project IDRERA-GRG-1010-2022
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameMvn Athens
PromoterMvn Infrastructure Pvt Ltd
Promoter’s registered officeMvn Athens Sohna, Sector-5, Dhaula Road, Sohna, Gurugram
Site addressSector- 5, Dhaula Road , Sohna
SectorSector 5
Tehsil / DistrictSohna / Gurugram
Layout plan approved20 Jan 2022
Building plans approved20 Jan 2022
Construction start (as filed)15 Feb 2022
Completion (as filed)1 Oct 2025
Application submitted1 Feb 2022

Authority, hearings & orders

Current statusExtension Certificate Uploaded
Initial scrutinyfirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter Dispatched
  1. Hearing Examination By Authority View order
    Proceedings

    Ar. Neeraj Gautam, Associate Architectural Executive briefed the facts about the case.   Sh. Devraj Dixit (Laison Head) and Sh. Sanjeev Sharma (AR) are present on the behalf of the promoter. The promoter is yet to make the corrections in REP-I and online DPI as already conveyed. The promoter has applied for the approvals of environmental clearance, fire scheme and service plans and estimates in the concerned departments and the final approvals are still awaited. As the registration of the Project MVN Athens (license no. 49 of 2014) registered vide no. 20 of 2019 has already expired, the details regarding the completion stage and compliances of the conditions of registration be provided to the Authority. After scrutiny of the reply submitted by the AR dated 13.05.2022, there are still deficiencies in the application and the same be conveyed to the promoter. The promoter is directed to submit the deficit documents to the Authority before the next date of hearing. The matter to come up on 30.05.2022.

  2. Hearing Objection View order
    Proceedings

    Ar. Neeraj Gautam, Associate Architectural Executive briefed the facts about the case.  None is present on behalf of the promoter. The matter to come up on 06.06.2022. In meanwhile the promoter is advised to ensure submission of a certificate from the concerned branch regarding submission of the annual audit report of project accounts in respect of projects registered till 31.03.2021 and QPRs of the projects of the promoter till last quarter.  

  3. Hearing Adjournment View order
    Proceedings

    Ar. Neeraj Gautam, Associate Architectural Executive briefed the facts about the case.  Sh. Devraj Dixit (Laison Head) is present on the behalf of the promoter. The promoter stated that they have submitted the reply today itself. The authority directed the concerned planning executive to scrutinize the reply. The matter to come up on 13.06.2022.

  1. Hearing Objection View order
    Proceedings

    The Coram is incomplete. The matter is adjourned to 27.06.2022.

  2. Hearing Adjournment View order
    Proceedings

    Ar. Neeraj Gautam, Associate Architectural Executive briefed the facts about the case.  Sh. Devraj Dixit (Laison Head) and Sh. Sanjeev Sharma (AR) are present on the behalf of the promoter. The promoter is directed to attend the deficiencies before the next date of hearing. The matter to come up on 11.07.2022

  3. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Proceedings dated 11.07.2022 Ar. Neeraj Gautam, Associate Architectural Executive briefed the facts about the case.  Sh. Devraj Dixit (Manager Admin.) is present on the behalf of the promoter. The AR assures that the pending approvals of fire, revised service plan estimates (the service plan estimates already stand approved and executed w.r.t. existing project and revision is required to add additional area), environment clearance (already stand recommended by SEAC for Gold Standard) within two months as the same are already under approval. The AR is advised to submit BG for 10 lakh each for above approvals and rectification of errors in A to H and DPI etc. It is also noted that the promoter has already  obtained  OC in respect of existing affordable group housing scheme for all towers and possessison also handed over within stipulated time. The Authority decides to grant registration subject to submission of above. 

  1. Registration granted GGM/588/320/2022/63
  2. Registration valid till

Land, licence & cost

Land area of the project8.25 acres
Total licensed area8.25 acres
Licence49 of 2014(18.02.2026) 27 of 2020 (02.10.2020)
Estimated project cost₹ 52 Cr
Cost of land₹ 6.27 Cr
Cost of construction₹ 38 Cr
Infrastructure and other structures₹ 3.2 Cr
EDC, taxes, levies and other costs₹ 4.53 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments1,755.22624.9%
Construction Of Roads638.2299%
Pavements67.3611%
Parks And Playgrounds1,045.82914.8%
Green Belts691.5049.8%
Vehicle Parkings2,55036.1%
Electricity Sub-Station100.1251.4%
Sewage And Solid Waste Treatment Facility202.4362.9%
Any Other5.9850.1%

Apartments 274 units · 2 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings49.42532101
Apartment/Shops/Other Buildings55.4559760
Apartment/Shops/Other Buildings59.9764644
Apartment/Shops/Other Buildings34.6237369

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsHSVPYes
Water SupplyHSVPYes
ElectricityDHBVNYes
Sewage DisposalHSVPYes
Storm Water DrainageHSVPYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 65.58 lakhSubmitted To HUDA
Water Supply System₹ 95.42 lakhSubmitted To HUDA
Storm Water Drainage₹ 20.81 lakhSubmitted To HUDA
Electricity Supply System₹ 92.02 lakhSubmitted To HUDA
Sewage Treatment & Garbage Disposal₹ 22.64 lakhSubmitted To HUDA
Street Lighting₹ 4.02 lakhSubmitted To HUDA
Security And Fire Fighting₹ 6.07 lakhSubmitted To HUDA
Playgrounds And Parks₹ 3.44 lakhSubmitted To HUDA
Renewable Energy System₹ 10 lakhSubmitted To HUDA

Statutory approvals

ApprovalStatusDate
Services PlansApplied For But Yet To Receive25 Jan 2022

Specifications (as filed)

Flooring Details Of Various Parts Of HouseAll Rooms Vitrified Flooring, Toilets Ceramic Flooring.
Wall Finishing DetailsInternal Wall Oil Bound Distemper
Kitchen DetailsOpen Kitchen With Marble Platform.
Bathroom FittingsCp Fittings As Per Approved Drawings
Wood Work EtcNot Applicable
Doors And Windos FramesRed Merandi Door Frames And Z Section Window Frames, Balcony Door Frame Is Pressed Steel.
Glass WorkNot Applicable
Electric FittingsAs Per Approved Drawing
Conducting And Wiring DetailsAs Per Approved Drawings
Cupboard DetailsNot Applicable
Water StorageOverhead Water Tank As Per Approved Drawing
Lift DetailsAs Per Approved Drawings
Windows/GlazingsGlass As Per Approved Drawing
Main DoorsFlush Door
Internal DoorsFlush Door
Air ConditioningNot Applicable
Electrical FittingsAs Per Approved Drawings
Cng Pipe LineNot Applicable
Provision Of Wifi And Broadband FacilityNot Applicable
External Finishing/Colour SchemeWeather Proof Paint
Internal FinishingPutty/ Pop/ Oil Bound Distemper

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Mvn Athens?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.