Mvn Athens
by Mvn Infrastructure Pvt Ltd · Sector- 5, Dhaula Road , Sohna
- RERA registration
- GGM/588/320/2022/63
- Registered on
- 11 Jul 2022
- Valid till
- 29 Sep 2026
- Project ID
- RERA-GRG-1010-2022
- Land area
- 8.25 acres
- Apartments
- 274 in 2 towers
- Completion (as filed)
- 1 Oct 2025
- Estimated cost
- ₹ 52 Cr
RERA registration
| Registration certificate | GGM/588/320/2022/63, dated 11 Jul 2022 |
|---|---|
| Registration valid till | 29 Sep 2026 |
| Project ID | RERA-GRG-1010-2022 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Mvn Athens |
| Promoter | Mvn Infrastructure Pvt Ltd |
| Promoter’s registered office | Mvn Athens Sohna, Sector-5, Dhaula Road, Sohna, Gurugram |
| Site address | Sector- 5, Dhaula Road , Sohna |
| Sector | Sector 5 |
| Tehsil / District | Sohna / Gurugram |
| Layout plan approved | 20 Jan 2022 |
| Building plans approved | 20 Jan 2022 |
| Construction start (as filed) | 15 Feb 2022 |
| Completion (as filed) | 1 Oct 2025 |
| Application submitted | 1 Feb 2022 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
- Notice sent to the promoter Dispatched
-
Hearing
Examination By Authority View order
Proceedings
Ar. Neeraj Gautam, Associate Architectural Executive briefed the facts about the case. Sh. Devraj Dixit (Laison Head) and Sh. Sanjeev Sharma (AR) are present on the behalf of the promoter. The promoter is yet to make the corrections in REP-I and online DPI as already conveyed. The promoter has applied for the approvals of environmental clearance, fire scheme and service plans and estimates in the concerned departments and the final approvals are still awaited. As the registration of the Project MVN Athens (license no. 49 of 2014) registered vide no. 20 of 2019 has already expired, the details regarding the completion stage and compliances of the conditions of registration be provided to the Authority. After scrutiny of the reply submitted by the AR dated 13.05.2022, there are still deficiencies in the application and the same be conveyed to the promoter. The promoter is directed to submit the deficit documents to the Authority before the next date of hearing. The matter to come up on 30.05.2022.
-
Hearing
Objection View order
Proceedings
Ar. Neeraj Gautam, Associate Architectural Executive briefed the facts about the case. None is present on behalf of the promoter. The matter to come up on 06.06.2022. In meanwhile the promoter is advised to ensure submission of a certificate from the concerned branch regarding submission of the annual audit report of project accounts in respect of projects registered till 31.03.2021 and QPRs of the projects of the promoter till last quarter.
-
Hearing
Adjournment View order
Proceedings
Ar. Neeraj Gautam, Associate Architectural Executive briefed the facts about the case. Sh. Devraj Dixit (Laison Head) is present on the behalf of the promoter. The promoter stated that they have submitted the reply today itself. The authority directed the concerned planning executive to scrutinize the reply. The matter to come up on 13.06.2022.
-
Hearing
Objection View order
Proceedings
The Coram is incomplete. The matter is adjourned to 27.06.2022.
-
Hearing
Adjournment View order
Proceedings
Ar. Neeraj Gautam, Associate Architectural Executive briefed the facts about the case. Sh. Devraj Dixit (Laison Head) and Sh. Sanjeev Sharma (AR) are present on the behalf of the promoter. The promoter is directed to attend the deficiencies before the next date of hearing. The matter to come up on 11.07.2022
-
Hearing
Approved And Ready For Certificate Issuing Process View order
Proceedings
Proceedings dated 11.07.2022 Ar. Neeraj Gautam, Associate Architectural Executive briefed the facts about the case. Sh. Devraj Dixit (Manager Admin.) is present on the behalf of the promoter. The AR assures that the pending approvals of fire, revised service plan estimates (the service plan estimates already stand approved and executed w.r.t. existing project and revision is required to add additional area), environment clearance (already stand recommended by SEAC for Gold Standard) within two months as the same are already under approval. The AR is advised to submit BG for 10 lakh each for above approvals and rectification of errors in A to H and DPI etc. It is also noted that the promoter has already obtained OC in respect of existing affordable group housing scheme for all towers and possessison also handed over within stipulated time. The Authority decides to grant registration subject to submission of above.
- Registration granted GGM/588/320/2022/63
- Registration valid till
Land, licence & cost
| Land area of the project | 8.25 acres |
|---|---|
| Total licensed area | 8.25 acres |
| Licence | 49 of 2014(18.02.2026) 27 of 2020 (02.10.2020) |
| Estimated project cost | ₹ 52 Cr |
| Cost of land | ₹ 6.27 Cr |
| Cost of construction | ₹ 38 Cr |
| Infrastructure and other structures | ₹ 3.2 Cr |
| EDC, taxes, levies and other costs | ₹ 4.53 Cr |
How the land will be used
| Use | Area (as filed) | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 1,755.226 | 24.9% |
| Construction Of Roads | 638.229 | 9% |
| Pavements | 67.361 | 1% |
| Parks And Playgrounds | 1,045.829 | 14.8% |
| Green Belts | 691.504 | 9.8% |
| Vehicle Parkings | 2,550 | 36.1% |
| Electricity Sub-Station | 100.125 | 1.4% |
| Sewage And Solid Waste Treatment Facility | 202.436 | 2.9% |
| Any Other | 5.985 | 0.1% |
Apartments 274 units · 2 towers
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 49.42 | 532 | 101 |
| Apartment/Shops/Other Buildings | 55.45 | 597 | 60 |
| Apartment/Shops/Other Buildings | 59.97 | 646 | 44 |
| Apartment/Shops/Other Buildings | 34.62 | 373 | 69 |
Areas are as filed with HRERA.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | HSVP | Yes |
| Water Supply | HSVP | Yes |
| Electricity | DHBVN | Yes |
| Sewage Disposal | HSVP | Yes |
| Storm Water Drainage | HSVP | Yes |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 65.58 lakh | Submitted To HUDA |
| Water Supply System | ₹ 95.42 lakh | Submitted To HUDA |
| Storm Water Drainage | ₹ 20.81 lakh | Submitted To HUDA |
| Electricity Supply System | ₹ 92.02 lakh | Submitted To HUDA |
| Sewage Treatment & Garbage Disposal | ₹ 22.64 lakh | Submitted To HUDA |
| Street Lighting | ₹ 4.02 lakh | Submitted To HUDA |
| Security And Fire Fighting | ₹ 6.07 lakh | Submitted To HUDA |
| Playgrounds And Parks | ₹ 3.44 lakh | Submitted To HUDA |
| Renewable Energy System | ₹ 10 lakh | Submitted To HUDA |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Services Plans | Applied For But Yet To Receive | 25 Jan 2022 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | All Rooms Vitrified Flooring, Toilets Ceramic Flooring. |
|---|---|
| Wall Finishing Details | Internal Wall Oil Bound Distemper |
| Kitchen Details | Open Kitchen With Marble Platform. |
| Bathroom Fittings | Cp Fittings As Per Approved Drawings |
| Wood Work Etc | Not Applicable |
| Doors And Windos Frames | Red Merandi Door Frames And Z Section Window Frames, Balcony Door Frame Is Pressed Steel. |
| Glass Work | Not Applicable |
| Electric Fittings | As Per Approved Drawing |
| Conducting And Wiring Details | As Per Approved Drawings |
| Cupboard Details | Not Applicable |
| Water Storage | Overhead Water Tank As Per Approved Drawing |
| Lift Details | As Per Approved Drawings |
| Windows/Glazings | Glass As Per Approved Drawing |
| Main Doors | Flush Door |
| Internal Doors | Flush Door |
| Air Conditioning | Not Applicable |
| Electrical Fittings | As Per Approved Drawings |
| Cng Pipe Line | Not Applicable |
| Provision Of Wifi And Broadband Facility | Not Applicable |
| External Finishing/Colour Scheme | Weather Proof Paint |
| Internal Finishing | Putty/ Pop/ Oil Bound Distemper |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.