Maximal
by Maximal Infrastructure Pvt Ltd · Sector 89
- RERA registration
- Applied, not granted yet
- Applied on
- 22 Jul 2019
- Application status
- Return
- Project ID
- RERA-PKL-587-2019
- Land area
- 48.038 acres
- Estimated cost
- ₹ 0 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
| Registration certificate | Not issued yet: the application is being processed by HRERA Panchkula |
|---|---|
| Project ID | RERA-PKL-587-2019 |
| Authority | HRERA Panchkula |
| Project type (as filed) | Ongoing |
| Project name | Maximal |
| Promoter | Maximal Infrastructure Pvt Ltd |
| Promoter’s registered office | R-13,2ND Floor Greater Kailash-1, New Delhi |
| CIN | U45201DL2005PTC144085 |
| Site address | Sector 89 |
| Sector | Sector 89 |
| Tehsil / District | Faridabad / Faridabad |
| Layout plan approved | 29 Feb 2008 |
| Building plans approved | 29 Feb 2008 |
| Application submitted | 22 Jul 2019 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Panchkula
-
Hearing
Examination By Authority View order
Proceedings
Adjourned to 30.09.2019
-
Hearing
Sine Die View order
Proceedings
Sine die
-
Hearing
Adjournment View order
Proceedings
Adjourned to 02.03.2020.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 08.06.2020.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 13.07.2020.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 07.09.2020.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 21.09.2020.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 23.11.2020.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 22.02.2021.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 05.04.2021.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 07.06.2021.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 12.07.2021.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 20.09.2021.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 08.11.2021.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 29.11.2021.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 20.12.2021.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 14.02.2022.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 28.02.2022.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 07.03.2022.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 10.03.2022.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 09.05.2022.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 03.10.2022.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 31.10.2022.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 21.11.2022
-
Hearing
Adjournment View order
Proceedings
Adjourned to 19.12.2022
-
Hearing
Adjournment View order
Proceedings
Adjourned to 09.01.2023
-
Hearing
Adjournment View order
Proceedings
Adjourned to 16.01.2023.
-
Hearing
Adjournment View order
Proceedings
Adjourned to 06.03.2023
-
Hearing
Adjournment View order
Proceedings
Adjourned to 22.05.2023
-
Hearing
Adjournment View order
Proceedings
Adjourned to 12.06.2023
-
Hearing
Adjournment View order
Proceedings
Adjourned to 24.07.2023
-
Hearing
Adjournment View order
Proceedings
Adjourned to 26.07.2023
-
Hearing
Sine Die View order
Proceedings
Sine Die till the final decision of the Hon'ble High Court
-
Hearing
Return View order
Proceedings
DISPOSED OF AS RETURNED.
Land, licence & cost
| Land area of the project | 48.038 acres |
|---|---|
| Total licensed area | 48.038 acres |
| Licence | 34,35 and 36 of 2007 |
| Estimated project cost | ₹ 0 Cr |
| Cost of land | ₹ 0 Cr |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | Yes | WATER SUPPLY |
| Yes | ELECTRICITY | Yes |
| Sewage Disposal | Yes | STORM WATER DRAINAGE |
| Yes | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: | Sr. No. |
| Name of the facility | Estimated cost (In Lakhs)(Within the project area only) | Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) |
| 1 | INTERNAL ROADS AND PAVEMENTS | 0 |
| Yet To Be Prepared | 2 | WATER SUPPLY SYSTEM |
| 0 | YET TO BE PREPARED | 3 |
| Storm Water Drainage | 0 | YET TO BE PREPARED |
| 4 | ELECTRICITY SUPPLY SYSTEM | 0 |
| Yet To Be Prepared | 5 | SEWAGE TREATMENT & GARBAGE DISPOSAL |
| 0 | YET TO BE PREPARED | 6 |
| Street Lighting | 0 | YET TO BE PREPARED |
| 7 | SECURITY AND FIRE FIGHTING | 0 |
| Yet To Be Prepared | 8 | PLAYGROUNDS AND PARKS |
| 0 | YET TO BE PREPARED | 9 |
| Club House/Community Centre | 0 | YET TO BE PREPARED |
| 10 | SHOPPING AREA | 0 |
| Yet To Be Prepared | 11 | RENEWABLE ENERGY SYSTEM |
| 0 | YET TO BE PREPARED | 12 |
| School | 0 | YET TO BE PREPARED |
| 13 | HOSPITAL/DISPENSARY | 0 |
| Yet To Be Prepared | 14 | ANY OTHER |
| 0 | YET TO BE PREPARED | 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. |
| 29-02-2008 | (date) | 6. Date of approval of Building Plans |
| 29-02-2008 | (date) | (i) Details of the plots/apartments in the project: |
| Sr. No. | Plot/ apartment type | Size of the plot/carpet area of the apartments |
| Total number of plots/apartments in the project | Total size of the plots/carpet area of the apartments | Plots/apartments booked/ sold upto the date of application |
| Yet to be sold/ booked | No. of towers to be/ being constructed for booked apartments | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type N.A | 0 | 0 |
| 0 | 0 | 0 |
| 0 | Total | 0 |
| 0 | 0 | 0 |
| 0 | (ii) Apartments/Shops/Other Buildings:- | (a) Status of construction activities in respect of sold/booked apartments. |
| Type | Number of apartments booked/ sold | Write or Annex the stage of construction of the booked/ sold apartments in folder C |
| N.a | 0 | N.A |
| (b) Time schedule of completion of already booked apartments: | Start Date | 15-06-2007 |
| Earlier date of completion | 15-06-2010 | Revised date of completion |
| 15-12-2020 | (c) Time schedule for development of infrastructure: | Start Date |
| 15-06-2007 | Percentage completion Upto the | date of application |
| 0 | Projected date of completion | 12-12-2010 |
| (d) Provide further details in the proforma REP-I Part-C-X. | TO BE DEVELOPED BY THE FIVE DEVELOPERS. | (e) Plan of action for completing the Project along with requisite infrastructure. |
| To Be Developed By The Five Developers. | (iii) Status in respect of plotted colony:- | (a) |
| Plots | Booked/sold | Stage of handing over the possession (Write or Annex details) |
| Plot | 0 | NA |
| (b) Schedule for development of Infrastructure: | Start Date | 13-06-2019 |
| Percentage completion | 0 | Projected date of completion |
| 15-12-2020 | (c) Provide further details in the proforma REP-I Part-C-X. | TO BE DEVELOPED BY THE FIVE DEVELOPERS. |
| (d) Schedule of completing the project and handing over possession of the plots. | TO BE DEVELOPED BY THE FIVE DEVELOPERS. | (iv) Vehicle parkings details of the project- |
| a) Underground parking | 0 | b) Stilt parking |
| 0 | c) Covered parking | 0 |
| d) Open parking | 0 | e) Independent garages |
| 0 | (v) Quarterly schedule of development of whole/remaining part of the project: | (a) Apartments/Shops/Other Buildings |
| Expenditure incurred till the date of application (In Lakhs) | Particulars | Expenditure |
| Apartments | 0 | Shops |
| 0 | Plots | 0 |
| Expenditure to be made in each quarter (In Lakhs) | Particulars | Expenditure to be made in each quarter ( |
| ) | Apr-June | July-Sep |
| Oct-Dec | Jan-Mar | (b) Infrastructure |
| Expenditure incurred till the date of application (In Lakhs) | Particulars | Expenditure |
| Roads & Pavements | 0 | Water Supply System |
| 0 | Sewerage treatment & garbage disposal | 0 |
| Electricity Supply System | 0 | Storm Water Drainage |
| 0 | Parks and Playgrounds | 0 |
| Clubhouse/community centres | 0 | Shopping area |
| 0 | Other | 0 |
| Expenditure to be made in each quarter (In Lakhs) | Particulars | Expenditure to be made in each quarter ( |
| ) | Apr-June | July-Sep |
| Oct-Dec | Jan-Mar | It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - C-X | 1.Financial information: |
| Particulars | Remarks, if any | i. No. of Flats/Apartments constructed |
| 0 | NA | ii. No. of Flats/ Apartments booked |
| 0 | NA | iii. Total amount sale value of booked Flats, on the date of application/end of last quarter |
| 0 Lakhs | NA | iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter |
| 0 Lakhs | NA | v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter |
| 0 Lakhs | NA | vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter |
| 0 Lakhs | NA | vii. Amount invested in the project upto the date of application |
| 0 Lakhs | NA | Land cost (If any) |
| 0 Lakhs | NA | Apartments |
| 0 Lakhs | NA | Infrastructure |
| 0 Lakhs | NA | EDC/ Taxes Etc. |
| 0 Lakhs | NA | viii. Balance cost to be incurred for completion of the project and delivery of possession |
| 0 Lakhs | NA | (a) In respect of existing allottees |
| 0 Lakhs | NA | (b) In respect of rest of the project |
| 0 Lakhs | NA | ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project |
| Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C | 0 Lakhs | NA |
| x. Total liabilities against the project up-to-date. (Annex details in folder C) | 0 Lakhs | NA |
| 2.Additional information: | Particulars | Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs) |
| Actual expenditure incurred upto the date of application. (In Lakhs) | I. INTERNAL ROADS AND PAVEMENTS | 0 |
| 0 | II. WATER SUPPLY SYSTEM | 0 |
| 0 | III. STORM WATER DRAINAGE | 0 |
| 0 | IV. ELECTRICITY SUPPLY SYSTEM | 0 |
| 0 | V. SEWAGE TREATMENT & GARBAGE DISPOSAL | 0 |
| 0 | VI. CLUB HOUSE/COMMUNITY CENTRE | 0 |
| 0 | VII. SCHOOL | 0 |
| 0 | VIII. ANY OTHER | 0 |
| 0 | IX. SOLID WASTE COLLECTION & MGMT SYSTEM | 0 |
| 0 | X. CLUBHOUSE | 0 |
| 0 | XI. NEIGHBOURHOOD SHOPPING | 0 |
| 0 | XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC. | 0 |
| 0 | XIII. COVERED PARKING | 0 |
| 0 | XIV. OPEN PARKING | 0 |
| 0 | XV. GARAGES | 0 |
| 0 | XVI. SECURITY SYSTEM | 0 |
| 0 | XVII. OTHER FACILITIES AS PER PROJECT REPORT | 0 |
| 0 | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - D | Accounts related information: |
| 1. Annex copy of the balance sheet of last 3 years | No | 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. |
| Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form. | No | 3. Bank account to which the deposits received from apartment buyers will be credited |
| Bank and Branch address | INDUSIND BANK | Bank Account number |
| 200999985764 | IFSC code | INDB0000389 |
| MICR code | 110234039 | Branch code |
| 110 | 4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority) | HARI MOHAN GUPTA |
| 5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details) | NA | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - E |
| Details of the statutory approvals: | 1. Annex copies of the following in Folder E: | i. Lay out Plan |
| Yes | ii. Demarcation Plan | Yes |
| iii. Zoning Plan | Yes | iv. Building Plan |
| Yes | Site Plan | Yes |
| Floor Plan | Yes | Apartment Plans |
| Yes | Elevation Section | Yes |
| Detail of Permissible FAR | Yes | Detail of covered area achieved FAR |
| Yes | 2. Annex copies of the following in Folder E: | I. ROADS AND PAVEMENT PLAN |
| No | II. ELECTRICITY SUPPLY PLAN | No |
| III. Water Supply Plan | No | IV. SEWERAGE AND GARBAGE DISPOSAL PLAN |
| No | V. STROM WATER DRAINAGE | No |
| Vi. 10% Land To Be Transferred To The Govt. For Community Facility | No | VII. STREET LIGHTING PLAN |
| No | VIII. PARKING PLAN | No |
| 3. Statutory Approvals Status | Statutory Approvals | Statutory Approvals Status |
| Date | I. LICENSE NO.34-36 OF 2007 GRANTED BY DTCP, HARYANA | ALREADY BEEN OBTAINED |
| 24-01-2007 | It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees. | Signature _____________ |
| Seal _____________ | Date _____________ | FORM REP-I |
| Part - F | 1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers. | (Annex a copy in Folder F) |
| No | 2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules) | (Annex a copy in Folder F) |
| No | 3. Gist of the important provisions of the Draft Agreement | (Annex a copy in Folder F) |
| The project is being developed by five developers and they will proive the said information. | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - G | Projects launched by the promoter in last five years: |
| 1. Name and location of the project | NIL | 2. Particulars of the project in brief: |
| i. Total area of the project | 0 | ii. Total number of apartments |
| 0 | iii. Total number of plots | 0 |
| 3. The number of plots/ apartments booked/sold to the allottees: | (a) Apartments | 0 |
| (b) Plots | 0 | 4. Details of the expenditure incurred upto date: |
| Initially estimated cost (In Lakhs) | Revised cost (In Lakhs) | Expenditure incurred upto the date of application (In Lakhs) |
| Total cost of the project | (Other than cost of land) | 0 |
| 0 | 9851.74 | Cost of the apartments |
| 0 | 0 | 0 |
| Cost of the infrastructure | 0 | 0 |
| 0 | Others costs | 0 |
| 0 | 3175.87 | 5. Total amount of money collected from current allottees of the apartments/ plots upto the date of filing this application. |
| 0 Lakhs | 6. Remaining amount of sale price money to be collected from the current allottees of the apartments. | 0 Lakhs |
| 7. Loan sanctioned by the banks/ other financial institutions against the project. | 0 Lakhs | 8. Amount drawn from the banks/ other financial institutions till the date of filing this application. |
| 0 Lakhs | 9. Whether any litigation is pending against the Project: | Yes/No |
| (If yes-give Annex details in folder G) | Yes | 10. Initial date of completion of the project. |
| 15-12-2010 | 11. Likely date of completion of the project. | 15-12-2020 |
| I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - H |
| Specification Of Construction | Specification of apartments and other buildings including the following: | 1 |
| Flooring Details Of Various Parts Of House | NA | 2 |
| Wall Finishing Details | NA | 3 |
| Kitchen Details | NA | 4 |
| Bathroom Fittings | NA | 5 |
| Wood Work Etc | NA | 6 |
| Doors And Windos Frames | NA | 7 |
| Glass Work | NA | 8 |
| Electric Fittings | NA | 9 |
| Conducting And Wiring Details | NA | 10 |
| Cupboard Details | NA | 11 |
| Water Storage | NA | 12 |
| Lift Details | NA | 13 |
| External Glazings | NA | 13.1 |
| Windows/Glazings | NA | 14 |
| Doors | NA | 14.1 |
| Main Doors | NA | 14.2 |
| Internal Doors | NA | 15 |
| Air Conditioning | NA | 16 |
| Electrical Fittings | NA | 17 |
| Cng Pipe Line | NA | 18 |
| Provision Of Wifi And Broadband Facility | NA | 19 |
| External Finishing/Colour Scheme | NA | 20 |
| Internal Finishing | NA | SPECIFICATION UNIT WISE |
| 1 . Living/Dining/Foyer/Family Lounge | 1 . 1 | FLOOR |
| Na | 1 . 2 | WALLS |
| Na | 1 . 3 | CEILING |
| Na | 2 . MASTER BEDROOM/DRESSROOM | 2 . 1 |
| Floor | NA | 2 . 2 |
| Walls | NA | 2 . 3 |
| Ceiling | NA | 2 . 4 |
| Modular Wardrobes | NA | 3 . MASTER TOILET |
| 3 . 1 | FLOOR | NA |
| 3 . 2 | WALLS | NA |
| 3 . 3 | CEILING | NA |
| 3 . 4 | COUNTERS | NA |
| 3 . 5 | SANITARY WARE/CP FITTINGS | NA |
| 3 . 6 | FITTING/FIXTURES | NA |
| 4 . Bed Rooms | 4 . 1 | FLOOR |
| Na | 4 . 2 | WALLS |
| Na | 4 . 3 | CEILING |
| Na | 4 . 4 | WARDROBES |
| Na | 5 . TOILET | 5 . 1 |
| Floor | NA | 5 . 2 |
| Walls | NA | 5 . 3 |
| Ceiling | NA | 5 . 4 |
| Counters | NA | 5 . 5 |
| Sanitary Ware/Cp Fittings | NA | 5 . 6 |
| Fixtures | NA | 6 . KITCHEN |
| 6 . 1 | FLOOR | NA |
| 6 . 2 | WALLS | NA |
| 6 . 3 | CEILING | NA |
| 6 . 4 | COUNTERS | NA |
| 6 . 5 | FIXTURES | NA |
| 6 . 6 | KITCHEN APPLIANCES | NA |
| 7 . Utility Rooms/Utility Balcony/Toilet | 7 . 1 | FLOOR |
| Na | 7 . 2 | WALLS & CEILING |
| Na | 7 . 3 | TOILET |
| Na | 7 . 4 | BALCONY |
| Na | 8 . SIT-OUTS | 8 . 1 |
| Floor | NA | 8 . 2 |
| Walls & Ceiling | NA | 8 . 3 |
| Railings | NA | 8 . 4 |
| Fixtures | NA | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | List of Uploaded Documents | Sr. No. |
| Document Description | Date of Document Upload | View Document |
| 1 | A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS | 20-07-2019 |
| View Document | 2 | SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN |
| 20-07-2019 | View Document | 3 |
| In Case Of Plotted Colony, The Latest Layout Plan | 20-07-2019 | View Document |
| 4 | DEMARCATION PLAN | 20-07-2019 |
| View Document | 5 | NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT |
| 20-07-2019 | View Document | 6 |
| Certificate From A Chartered Accountant Certifying That The Informstion Provided By The Applicant In Form Rep-1-C-X Is Correct As Per The Books Of Accounts/ Balance Sheet Of The Applicant | 20-07-2019 | View Document |
| 7 | CASH FLOW STATEMENT OF THE PROPOSED PROJECT | 16-07-2019 |
| View Document | 8 | IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN |
| 08-06-2019 | View Document | 9 |
| Copy Of License Along With Schedule Of Land | 07-06-2019 | View Document |
| 10 | ZONING PLAN | 08-06-2019 |
| View Document | 11 | DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD |
| 16-07-2019 | View Document | 12 |
| Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed. | 16-07-2019 | View Document |
| I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| License NO.34-36 Of 2007 Granted By Dtcp, Haryana | Already Been Obtained | 24 Jan 2007 |
Source: HRERA Panchkula, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.