RERA applied, not grantedHRERA Panchkula

Maximal

by Maximal Infrastructure Pvt Ltd · Sector 89

RERA registration
Applied, not granted yet
Applied on
22 Jul 2019
Application status
Return
Project ID
RERA-PKL-587-2019
Land area
48.038 acres
Estimated cost
₹ 0 Cr

This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.

RERA registration

Registration certificateNot issued yet: the application is being processed by HRERA Panchkula
Project IDRERA-PKL-587-2019
AuthorityHRERA Panchkula
Project type (as filed)Ongoing
Project nameMaximal
PromoterMaximal Infrastructure Pvt Ltd
Promoter’s registered officeR-13,2ND Floor Greater Kailash-1, New Delhi
CINU45201DL2005PTC144085
Site addressSector 89
SectorSector 89
Tehsil / DistrictFaridabad / Faridabad
Layout plan approved29 Feb 2008
Building plans approved29 Feb 2008
Application submitted22 Jul 2019

Authority, hearings & orders

Current statusReturn
Initial scrutinyListed for first hearing.
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Panchkula
  3. Hearing Examination By Authority View order
    Proceedings

    Adjourned to 30.09.2019

  1. Hearing Sine Die View order
    Proceedings

    Sine die

  2. Hearing Adjournment View order
    Proceedings

    Adjourned to 02.03.2020.

  3. Hearing Adjournment View order
    Proceedings

    Adjourned to 08.06.2020.

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 13.07.2020.

  2. Hearing Adjournment View order
    Proceedings

    Adjourned to 07.09.2020.

  3. Hearing Adjournment View order
    Proceedings

    Adjourned to 21.09.2020.

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 23.11.2020.

  2. Hearing Adjournment View order
    Proceedings

    Adjourned to 22.02.2021.

  3. Hearing Adjournment View order
    Proceedings

    Adjourned to 05.04.2021.

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 07.06.2021.

  2. Hearing Adjournment View order
    Proceedings

    Adjourned to 12.07.2021.

  3. Hearing Adjournment View order
    Proceedings

    Adjourned to 20.09.2021.

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 08.11.2021.

  2. Hearing Adjournment View order
    Proceedings

    Adjourned to 29.11.2021.

  3. Hearing Adjournment View order
    Proceedings

    Adjourned to 20.12.2021.

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 14.02.2022.

  2. Hearing Adjournment View order
    Proceedings

    Adjourned to 28.02.2022.

  3. Hearing Adjournment View order
    Proceedings

    Adjourned to 07.03.2022.

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 10.03.2022.

  2. Hearing Adjournment View order
    Proceedings

    Adjourned to 09.05.2022.

  3. Hearing Adjournment View order
    Proceedings

    Adjourned to 03.10.2022.

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 31.10.2022.

  2. Hearing Adjournment View order
    Proceedings

    Adjourned to 21.11.2022

  3. Hearing Adjournment View order
    Proceedings

    Adjourned to 19.12.2022

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 09.01.2023

  2. Hearing Adjournment View order
    Proceedings

    Adjourned to 16.01.2023.

  3. Hearing Adjournment View order
    Proceedings

    Adjourned to 06.03.2023

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 22.05.2023

  2. Hearing Adjournment View order
    Proceedings

    Adjourned to 12.06.2023

  3. Hearing Adjournment View order
    Proceedings

    Adjourned to 24.07.2023

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 26.07.2023

  2. Hearing Sine Die View order
    Proceedings

    Sine Die till the final decision of the Hon'ble High Court

  3. Hearing Return View order
    Proceedings

    DISPOSED OF AS RETURNED.

Land, licence & cost

Land area of the project48.038 acres
Total licensed area48.038 acres
Licence34,35 and 36 of 2007
Estimated project cost₹ 0 Cr
Cost of land₹ 0 Cr

External services

ServiceProvided byApproval taken
RoadsYesWATER SUPPLY
YesELECTRICITYYes
Sewage DisposalYesSTORM WATER DRAINAGE
Yes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:Sr. No.
Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS0
Yet To Be Prepared2WATER SUPPLY SYSTEM
0YET TO BE PREPARED3
Storm Water Drainage0YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM0
Yet To Be Prepared5SEWAGE TREATMENT & GARBAGE DISPOSAL
0YET TO BE PREPARED6
Street Lighting0YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0
Yet To Be Prepared8PLAYGROUNDS AND PARKS
0YET TO BE PREPARED9
Club House/Community Centre0YET TO BE PREPARED
10SHOPPING AREA0
Yet To Be Prepared11RENEWABLE ENERGY SYSTEM
0YET TO BE PREPARED12
School0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0
Yet To Be Prepared14ANY OTHER
0YET TO BE PREPARED5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.
29-02-2008(date)6. Date of approval of Building Plans
29-02-2008(date)(i) Details of the plots/apartments in the project:
Sr. No.Plot/ apartment typeSize of the plot/carpet area of the apartments
Total number of plots/apartments in the projectTotal size of the plots/carpet area of the apartmentsPlots/apartments booked/ sold upto the date of application
Yet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments1
APARTMENT/SHOPS/OTHER BUILDINGS Type N.A00
000
0Total0
000
0(ii) Apartments/Shops/Other Buildings:-(a) Status of construction activities in respect of sold/booked apartments.
TypeNumber of apartments booked/ soldWrite or Annex the stage of construction of the booked/ sold apartments in folder C
N.a0N.A
(b) Time schedule of completion of already booked apartments:Start Date15-06-2007
Earlier date of completion15-06-2010Revised date of completion
15-12-2020(c) Time schedule for development of infrastructure:Start Date
15-06-2007Percentage completion Upto the   date of application
0Projected date of completion12-12-2010
(d) Provide further details in the proforma REP-I Part-C-X.TO BE DEVELOPED BY THE FIVE DEVELOPERS.(e) Plan of action for completing the Project along with requisite infrastructure.
To Be Developed By The Five Developers.(iii) Status in respect of plotted colony:-(a)
PlotsBooked/soldStage of handing over the possession (Write or Annex details)
Plot0NA
(b) Schedule for development of Infrastructure:Start Date13-06-2019
Percentage completion0Projected date of completion
15-12-2020(c) Provide further details in the proforma REP-I Part-C-X.TO BE DEVELOPED BY THE FIVE DEVELOPERS.
(d) Schedule of completing the project and handing over possession of the plots.TO BE DEVELOPED BY THE FIVE DEVELOPERS.(iv) Vehicle parkings details of the project-
a) Underground parking0b) Stilt parking
0c) Covered parking0
d) Open parking0e) Independent garages
0(v) Quarterly schedule of development of whole/remaining part of the project:(a) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)ParticularsExpenditure
Apartments0Shops
0Plots0
Expenditure to be made in each quarter (In Lakhs)ParticularsExpenditure to be made in each quarter (
)Apr-JuneJuly-Sep
Oct-DecJan-Mar(b) Infrastructure
Expenditure incurred till the date of application (In Lakhs)ParticularsExpenditure
Roads & Pavements0Water Supply System
0Sewerage treatment & garbage disposal0
Electricity Supply System0Storm Water Drainage
0Parks and Playgrounds0
Clubhouse/community centres0Shopping area
0Other0
Expenditure to be made in each quarter (In Lakhs)ParticularsExpenditure to be made in each quarter (
)Apr-JuneJuly-Sep
Oct-DecJan-MarIt is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - C-X1.Financial information:
ParticularsRemarks, if anyi. No. of Flats/Apartments constructed
0NAii. No. of Flats/ Apartments booked
0NAiii. Total amount sale value of booked Flats, on the date of application/end of last quarter
0 LakhsNAiv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
0 LakhsNAv. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
0 LakhsNAvi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
0 LakhsNAvii. Amount invested in the project upto the date of application
0 LakhsNALand cost (If any)
0 LakhsNAApartments
0 LakhsNAInfrastructure
0 LakhsNAEDC/ Taxes Etc.
0 LakhsNAviii. Balance cost to be incurred for completion of the project and delivery of possession
0 LakhsNA(a) In respect of existing allottees
0 LakhsNA(b) In respect of rest of the project
0 LakhsNAix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C0 LakhsNA
x. Total liabilities against the project up-to-date. (Annex details in folder C)0 LakhsNA
2.Additional information:ParticularsEstimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)I. INTERNAL ROADS AND PAVEMENTS0
0II. WATER SUPPLY SYSTEM0
0III. STORM WATER DRAINAGE0
0IV. ELECTRICITY SUPPLY SYSTEM0
0V. SEWAGE TREATMENT & GARBAGE DISPOSAL0
0VI. CLUB HOUSE/COMMUNITY CENTRE0
0VII. SCHOOL0
0VIII. ANY OTHER0
0IX. SOLID WASTE COLLECTION & MGMT SYSTEM0
0X. CLUBHOUSE0
0XI. NEIGHBOURHOOD SHOPPING0
0XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.0
0XIII. COVERED PARKING0
0XIV. OPEN PARKING0
0XV. GARAGES0
0XVI. SECURITY SYSTEM0
0XVII. OTHER FACILITIES AS PER PROJECT REPORT0
0I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - DAccounts related information:
1. Annex copy of the balance sheet of last 3 yearsNo2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch addressINDUSIND BANKBank Account number
200999985764IFSC codeINDB0000389
MICR code110234039Branch code
1104. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)HARI MOHAN GUPTA
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)NAI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - E
Details of the statutory approvals:1. Annex copies of the following in Folder E:i. Lay out Plan
Yesii. Demarcation PlanYes
iii. Zoning PlanYesiv. Building Plan
YesSite PlanYes
Floor PlanYesApartment Plans
YesElevation SectionYes
Detail of Permissible FARYesDetail of covered area achieved FAR
Yes2. Annex copies of the following in Folder E:I. ROADS AND PAVEMENT PLAN
NoII. ELECTRICITY SUPPLY PLANNo
III. Water Supply PlanNoIV. SEWERAGE AND GARBAGE DISPOSAL PLAN
NoV. STROM WATER DRAINAGENo
Vi. 10% Land To Be Transferred To The Govt. For Community FacilityNoVII. STREET LIGHTING PLAN
NoVIII. PARKING PLANNo
3. Statutory Approvals StatusStatutory ApprovalsStatutory Approvals Status
DateI. LICENSE NO.34-36 OF 2007 GRANTED BY DTCP, HARYANAALREADY BEEN OBTAINED
24-01-2007It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________
Seal _____________Date _____________FORM REP-I
Part - F1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)
No2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)
No3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)
The project is being developed by five developers and they will proive the said information.I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - GProjects launched by the promoter in last five years:
1. Name and location of the projectNIL2. Particulars of the project in brief:
i. Total area of the project0ii. Total number of apartments
0iii. Total number of plots0
3. The number of plots/ apartments booked/sold to the allottees:(a) Apartments0
(b) Plots04. Details of the expenditure incurred upto date:
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project(Other than cost of land)0
09851.74Cost of the apartments
000
Cost of the infrastructure00
0Others costs0
03175.875. Total amount of money collected from current allottees of the apartments/ plots upto the date of filing this application.
0 Lakhs6. Remaining amount of sale price money to be collected from the current allottees of the apartments.0 Lakhs
7. Loan sanctioned by the banks/ other financial institutions against the project.0 Lakhs8. Amount drawn from the banks/ other financial institutions till the date of filing this application.
0 Lakhs9. Whether any litigation is pending against the Project:Yes/No
(If yes-give Annex details in folder G)Yes10. Initial date of completion of the project.
15-12-201011. Likely date of completion of the project.15-12-2020
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - H
Specification Of ConstructionSpecification of apartments and other buildings including the following:1
Flooring Details Of Various Parts Of HouseNA2
Wall Finishing DetailsNA3
Kitchen DetailsNA4
Bathroom FittingsNA5
Wood Work EtcNA6
Doors And Windos FramesNA7
Glass WorkNA8
Electric FittingsNA9
Conducting And Wiring DetailsNA10
Cupboard DetailsNA11
Water StorageNA12
Lift DetailsNA13
External GlazingsNA13.1
Windows/GlazingsNA14
DoorsNA14.1
Main DoorsNA14.2
Internal DoorsNA15
Air ConditioningNA16
Electrical FittingsNA17
Cng Pipe LineNA18
Provision Of Wifi And Broadband FacilityNA19
External Finishing/Colour SchemeNA20
Internal FinishingNASPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge1 . 1FLOOR
Na1 . 2WALLS
Na1 . 3CEILING
Na2 . MASTER BEDROOM/DRESSROOM2 . 1
FloorNA2 . 2
WallsNA2 . 3
CeilingNA2 . 4
Modular WardrobesNA3 . MASTER TOILET
3 . 1FLOORNA
3 . 2WALLSNA
3 . 3CEILINGNA
3 . 4COUNTERSNA
3 . 5SANITARY WARE/CP FITTINGSNA
3 . 6FITTING/FIXTURESNA
4 . Bed Rooms4 . 1FLOOR
Na4 . 2WALLS
Na4 . 3CEILING
Na4 . 4WARDROBES
Na5 . TOILET5 . 1
FloorNA5 . 2
WallsNA5 . 3
CeilingNA5 . 4
CountersNA5 . 5
Sanitary Ware/Cp FittingsNA5 . 6
FixturesNA6 . KITCHEN
6 . 1FLOORNA
6 . 2WALLSNA
6 . 3CEILINGNA
6 . 4COUNTERSNA
6 . 5FIXTURESNA
6 . 6KITCHEN APPLIANCESNA
7 . Utility Rooms/Utility Balcony/Toilet7 . 1FLOOR
Na7 . 2WALLS & CEILING
Na7 . 3TOILET
Na7 . 4BALCONY
Na8 . SIT-OUTS8 . 1
FloorNA8 . 2
Walls & CeilingNA8 . 3
RailingsNA8 . 4
FixturesNAI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________List of Uploaded DocumentsSr. No.
Document DescriptionDate of Document UploadView Document
1A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS20-07-2019
View Document2SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN
20-07-2019View Document3
In Case Of Plotted Colony, The Latest Layout Plan20-07-2019View Document
4DEMARCATION PLAN20-07-2019
View Document5NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
20-07-2019View Document6
Certificate From A Chartered Accountant Certifying That The Informstion Provided By The Applicant In Form Rep-1-C-X Is Correct As Per The Books Of Accounts/ Balance Sheet Of The Applicant20-07-2019View Document
7CASH FLOW STATEMENT OF THE PROPOSED PROJECT16-07-2019
View Document8IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
08-06-2019View Document9
Copy Of License Along With Schedule Of Land07-06-2019View Document
10ZONING PLAN08-06-2019
View Document11DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD
16-07-2019View Document12
Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed.16-07-2019View Document
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________Print

Statutory approvals

ApprovalStatusDate
License NO.34-36 Of 2007 Granted By Dtcp, HaryanaAlready Been Obtained24 Jan 2007

Source: HRERA Panchkula, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Maximal?

This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.