M3M Corner Walk Including Retail, M3M Skywalk & M3M LOFT74
by Prompt Engineering Private Limited · Sector -74, Gurugram Manesar Urban Complex, Gurugram, Haryana.
- RERA registration
- Applied, not granted yet
- Applied on
- 28 Apr 2021
- Application status
- Approved And Ready For Certificate Issuing Process
- Project ID
- RERA-GRG-723-2020
- Land area
- 7.444 acres
- Estimated cost
- ₹ 984.35 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
| Registration certificate | Not issued yet: the application is being processed by HRERA Gurugram |
|---|---|
| Project ID | RERA-GRG-723-2020 |
| Authority | HRERA Gurugram |
| Project type (as filed) | Ongoing |
| Project name | M3M Corner Walk Including Retail, M3M Skywalk & M3M LOFT74 |
| Promoter | Prompt Engineering Private Limited |
| Promoter’s registered office | Cabin-1, Lgf, F-22, Sushant Shopping Arcade, Sushant Lok Phase - 1, Gurugram - 122002, Haryana |
| CIN | U29253HR2006PTC045140 |
| Site address | Sector -74, Gurugram Manesar Urban Complex, Gurugram, Haryana. |
| Sector | Sector 74 |
| Tehsil / District | Kadipur St / Gurugram |
| Layout plan approved | 29 Jul 2022 |
| Building plans approved | 27 Sep 2022 |
| Application submitted | 28 Apr 2021 |
Authority, hearings & orders
- Application submitted online
- Notice sent to the promoter By Hand
-
Hearing
Examination By Authority
Proceedings
Hearing is fixed for 08.06.2021.
-
Hearing
Adjournment
Proceedings
Sh. Ashish Kush, Planning Executive briefed the facts of the project. Sh. Abhijeet Singh (Manager) is present on behalf of the promoter. The building plans were first approved on 05.06.2014. Which were later revised on 08.01.2018. The commencement of construction started on 01.03.2018. For the project RERA registration was obtained vide 17 of 2018 dated 24.01.2018. The site area was 7.462 acres. The permissible FAR was 45296 Sq.Mtr. out of which 43294 Sq. Mtr FAR was used leaving a balance of 2002 Sq.Mtr. accordingly for the area shown for future development the FAR that could be utilized i.e. 2002 Sq.Mtr. The department of Town & Country Planning should have indicated that the are for future development is meant to be utilized to take the benefit of the existing TOD Policy. There were 548 units as per the approved building plan for which registration was got done, out of which 358 units have been sold. When the units were sold there was no intimation to the allottees regarding the intention of the promoter to take benefit of the TOD Policy in the project. Earlier on the retail block R2 only 5 floors were to be constructed which now has been increased to 19 floors. It is to be seen and ensured by the department of Town & Country Planning whether the promoter has produced the structural safety certificate and foundation adequacy to take load of additional floors in the revised building plan. Although such matters have been referred to the Director Town & Country Planning for clarification, meanwhile promoter is advised to complete the deficient documents and submit information in the online format. Deficiencies in the application stands already communicated to the promoter. The matter is to come up on 06.07.2021 at 3.0 PM in the Committee Room of the Authority.Dr. K.K. Khandelwal (Chairman)Samir Kumar (Member)Vijay Kumar Goyal (Member)
-
Hearing
Sine Die
Proceedings
The authority decided to keep the matter in sine die and should wait for reply of the reference sent to the Director, Town and Country Planning, Govt. of Haryana, Chandigarh for clarification and guidance in the matter.Dr. K.K. Khandelwal (Chairman)Samir Kumar (Member)Vijay Kumar Goyal (Member)
-
Hearing
Adjournment
Proceedings
Sh. Sumeet, Engineer Executive briefed about the facts of the case.Sh. Manik Sharma (AR) and Sh. Abhijeet Singh (AR) are present on behalf of the promoter.The AR of the promoter requests for 4 weeks’ time for removal of deficiencies.The matter to come up on 12.09.2022.
-
Hearing
Adjournment
Proceedings
Sh. Sumeet, Engineer Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Manik Sharma (AR) is present on behalf of the promoter. On the request of the AR of the promoter, one more opportunity is granted for rectifying the defects in the application for registration and submission of deficit documents. The matter to come up on 27.09.2022.
-
Hearing
Adjournment View order
Proceedings
Sh. Sumeet, Engineer Executive briefed about the facts of the project and following major deficiencies have pointed out i.e. (1). Revised fire scheme approval (2) Approved Service plan and estimates. ( 3). Approval/ NOCs for external services. (4) QPR of Phase 1 ( 5) 4(2)(l)(D) report of 2018-19 of Phase 1. The matter is adjourned for 11.10.2022.
-
Hearing
Adjournment View order
Proceedings
File recompiled recently needs to be examine. The matter to come up on 26.10.2022.
-
Hearing
Approved And Ready For Certificate Issuing Process View order
Proceedings
Proceedings dated: 17.10.2022 Sh. Sumeet, Engineer Executive and Ms. Asha Chartered Accountant briefed about the facts of the case. Sh. Manik Sharma (AS), Sh. Abhijeet Singh (AR) and Sh. Vineet Maheshwari (Legal Head) are present on behalf of the promoter. While granting approval of revised plans the DTCP has confirmed having obtained consent of more than 2/3rd of total allottees by the promoter and accordingly, the additional FAR with provision of mix land use has been allowed by DTCP under TOD policy of the state Government. The promoter has declared the same completion date under section 4(2)(l)(C) as has been applicable in the original registration certificate which now is to be amended by incorporating the new facts. Approved as proposed. (Sanjeev Kumar Arora) Member, HARERA, Gurugram (Vijay Kumar Goyal) Member, HARERA, Gurugram (Ashok Sangwan) Member, HARERA, Gurugram (Dr. K.K. Khandelwal) Chairman, HARERA, Gurugram
Land, licence & cost
| Land area of the project | 7.444 acres |
|---|---|
| Total licensed area | 7.444 acres |
| Licence | 121 of 2008 dated 14.06.2008 |
| Estimated project cost | ₹ 984.35 Cr |
| Cost of land | ₹ 333.46 Cr |
| Cost of construction | ₹ 485.04 Cr |
| Infrastructure and other structures | ₹ 47.91 Cr |
| EDC, taxes, levies and other costs | ₹ 117.95 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Parks And Playgrounds | 0.2054 | 2.8% |
| Sewage And Solid Waste Treatment Facility | 0.2609 | 3.5% |
| Any Other | 0.8623 | 11.6% |
| Rain | 0.005 | 0.1% |
| Area | 4.3412 | 58.3% |
| Roads | 1.769 | 23.8% |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | GMDA | Yes |
| Water Supply | GMDA | Yes |
| Electricity | DHBVNL | Yes |
| Sewage Disposal | GMDA | Yes |
| Storm Water Drainage | GMDA | Yes |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 4.93 Cr | As Per Project Report |
| Water Supply System | ₹ 3.5 Cr | As Per Project Report |
| Storm Water Drainage | ₹ 91.1 lakh | As Per Project Report |
| Electricity Supply System | ₹ 1.72 Cr | As Per Project Report |
| Sewage Treatment & Garbage Disposal | ₹ 2.87 Cr | As Per Project Report |
| Street Lighting | ₹ 28.55 lakh | As Per Project Report |
| Security And Fire Fighting | ₹ 3.99 Cr | As Per Project Report |
| Playgrounds And Parks | ₹ 10.02 Cr | As Per Project Report |
| Underground Water Tank | ₹ 2.12 Cr | As Per Project Report |
| Electrical Sub Station | ₹ 12.86 Cr | As Per Project Report |
| Stp | ₹ 2.21 Cr | As Per Project Report |
| Rain Water Harvesting | ₹ 2.49 Cr | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Revised Building Plan Approval | Already Been Obtained | 27 Sep 2022 |
| Airport Height Clearance | Already Been Obtained | 6 Apr 2022 |
| License | Already Been Obtained | 14 Jun 2008 |
| Water Noc | Already Been Obtained | 11 Nov 2021 |
| Aravali | Already Been Obtained | 10 Jul 2017 |
| Forest | Already Been Obtained | 27 Jun 2017 |
| Environment Clearance | Already Been Obtained | 19 Aug 2022 |
| Fire | Applied For But Yet To Receive | 1 Oct 2022 |
| Service Plan Estimate | Applied For But Yet To Receive | 28 Sep 2022 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Raw (Tile For Service Apartment) |
|---|---|
| Wall Finishing Details | Raw Wall/ Partitions (Paint For Service Apartment) |
| Kitchen Details | N.a. (Tile For Service Apartment) |
| Bathroom Fittings | Standard Chinaware, Cp Fittings, With/ Without Wash Basin Counter |
| Doors And Windos Frames | Aluminium Frame |
| Glass Work | Glass Thickness Varies From 6 To 10 Mm |
| Electric Fittings | Common Areas & Toilets To Be Provided With Led Light Fixtures. |
| Conducting And Wiring Details | Isi Approved Conduits & Wires |
| Water Storage | Rcc Tank |
| Lift Details | Standard Make Elevators |
| External Glazings | Aluminium Glazing |
| Windows/Glazings | Aluminium Glazing |
| Main Doors | Aluminium / Glass Doors (Wooden Flush Door For Service Apartments) |
| Internal Doors | Ms/Aluminium/Wooden Doors (Wooden Flush Door For Service Apartments) |
| Air Conditioning | Chilled Water Ac System For Office & Provision For Water Cooled Dx System Upto Tap Off Inside Shop |
| Electrical Fittings | Provision Of Cable Up To Distribution Board Isi /Bis Approved |
| External Finishing/Colour Scheme | Paint/Glass |
| Internal Finishing | Exterior Grade Paint |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.




Questions about M3M Corner Walk Including Retail, M3M Skywalk & M3M LOFT74?
This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.