HearingExamination By AuthorityView order Proceedings
Sh. Ashish Kush, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. The application submitted by the promoter has been scrutinized by the concerned official, but the deficiency notice has not been dispatched till date. Therefore, in view of the same the matter is adjourned, and the concerned official is directed to dispatch the notice. The next date of hearing will be conveyed after submission of reply of deficiencies.
Sh. Ashish Kush, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case.Sh. Rajesh Jain (General Manager), Sh. Dheeraj Garg (Dy. Manager) and Sh. Praveen Kumar (AR) are present on behalf of the promoter. The AR states that phasing of the project is under approval with DTCP and sanctioned copy will be submitted within one week as the present application is only in respect of Phase-I. Further, the project has been awarded through NCLT and consent of 23 unique allottees out of 30 unique allottees have been obtained and submitted in the Authority and one week public notice to be published in two newspapers (1 Hindi and 1 English) for inviting objections, if any.The matter to come up on 10.06.2024.
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Sh. Ashish Kush, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Rajesh Jain (AR), Sh. Dheeraj Garg (AR) and Sh. Praveen Kumar (AR) are present on behalf of the promoter. The AR of the promoter stated that the approved service plan and estimates, Phasing letter from DTCP alongwith the other deficiencies has been submitted on 07.06.2024. A public notice w.r.t the revision in building plans in respect to the project for inviting objections, if any has been published on 04.06.2024 in Hindustan Times (Hindi) and Hindustan (Hindi). No objection has been received regarding revision in the building plans in the project namely “Lushlands” till date. It is noticed that the project was already registered vide Registration No. 230 of 2017 dated 19.09.2017 (Monde-De-Provence, Phase-1, Tower B & D) and 266 of 2017 dated 09.10.2017 (Monde-De-Provence, Phase-II, Tower C). The CIRP proceeding u/s 7 of IBC was commenced against the erstwhile promoter of the project and a resolution plan was submitted by the AIDPL. The member of CoC had approved the resolution plan submitted by AIDPL and finally, the resolution plan was approved by Hon’ble NCLT, Delhi on 30.05.2022 and AIDPL was declared as successful bidder and project was assigned to it. The promoter has obtained the Change of Developer from DTCP, Haryana vide memo no. LC-2604-Vol-II/JE(RK)/2024/14388-94 dated 15.05.2024. The late fee be recalculated from 01.06.2022 as the promoter i.e., Adani Infrastructure and Developers Pvt. Ltd. got project through NCLT on 30.05.2022 and has applied for registration on 25.01.2024 and the excess fee, if any be returned. Approved as proposed subject to submission of BG /DD of Rs 25 lakhs for submission of Fire scheme approval within 3 months from the grant of registration and office to examine the reply dated 07.06.2024 and ensure necessary correction in form A to H and DPI.
Registration grantedGGM/837/569/2024/64
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
8.349 acres
Total licensed area
12.356 acres
Licence
98 of 2011
FAR permissible / proposed
1.75 / 1.75
Estimated project cost
₹ 906.08 Cr
Cost of land
₹ 46.6 Cr
Cost of construction
₹ 608.73 Cr
Infrastructure and other structures
₹ 42.95 Cr
EDC, taxes, levies and other costs
₹ 207.8 Cr
How the land will be used
Use
Acres
Share
Land Area To Be Used For Construction Of Apartments
1.1924
14.3%
Construction Of Roads
1
12%
Parks And Playgrounds
2.0913
25%
Vehicle Parkings
0.5
6%
Club House
0.3906
4.7%
Sewage And Solid Waste Treatment Facility
1.4748
17.7%
Watersupplysystem
0.5
6%
Stormwaterdrainage
0.5
6%
Electricitysupplysystem
0.2
2.4%
Securityandfirefighting
0.2
2.4%
Sportsblock
0.3
3.6%
External services
Service
Provided by
Approval taken
Roads
GMDA
Yes
Water Supply
GMDA
Yes
Electricity
DHBVN
Yes
Sewage Disposal
GMDA
Yes
Storm Water Drainage
GMDA
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 3.54 Cr
As Per Project Report
Water Supply System
₹ 59.94 lakh
As Per Project Report
Storm Water Drainage
₹ 1.11 Cr
As Per Project Report
Electricity Supply System
₹ 1.68 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 60.23 lakh
As Per Project Report
Street Lighting
₹ 41.68 lakh
As Per Project Report
Security And Fire Fighting
₹ 11.55 lakh
As Per Project Report
Playgrounds And Parks
₹ 1.54 Cr
As Per Project Report
Club House/Community Centre
₹ 17.7 Cr
As Per Project Report
Parking
₹ 10.97 lakh
As Per Project Report
Stp
₹ 3.18 Cr
As Per Project Report
Underground Water Tank
₹ 1.96 Cr
As Per Project Report
Rain Water Harvesting
₹ 34.64 lakh
As Per Project Report
Electric Substation
₹ 2.39 Cr
As Per Project Report
Cnstruction Of Circulation Road
₹ 6.16 Cr
As Per Project Report
Electrification
₹ 1.5 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
License
Already Been Obtained
11 Nov 2011
Zoning
Already Been Obtained
11 Nov 2011
Specifications (as filed)
Flooring Details Of Various Parts Of House
Marble, Laminated Flooring And Wooden Floor/Tiles As Applicable
Wall Finishing Details
Emulsion Paint
Kitchen Details
Granite Counter And Modular Kitchen
Bathroom Fittings
Standard Make
Doors And Windos Frames
Laminated Flush Doors
Electric Fittings
Isi Standard
Conducting And Wiring Details
Isi Standard
Water Storage
If Applicable
Lift Details
As Per Applicable Norms
External Glazings
Aluminium Frames With Toughned Glass
Windows/Glazings
Aluminium Frames With Toughned Glass
Doors
Laminated Flush Doors
Main Doors
Laminated Flush Doors
Internal Doors
Laminated Flush Doors
Electrical Fittings
Isi Standards
External Finishing/Colour Scheme
Paint Finish
Internal Finishing
Paint Finish
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Lushlands?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.