Kst Whispering Heights
by Kst Infrastructure Ltd. · Sector-88
- RERA registration
- HRERA-PKL-FBD-141-2019
- Valid till
- 31 Dec 2026
- Project ID
- RERA-PKL-386-2019
- Land area
- 8 acres
- Estimated cost
- ₹ 193 Cr
RERA registration
| Registration certificate | HRERA-PKL-FBD-141-2019 |
|---|---|
| Registration valid till | 31 Dec 2026 |
| Project ID | RERA-PKL-386-2019 |
| Authority | HRERA Panchkula |
| Project type (as filed) | Ongoing |
| Project name | Kst Whispering Heights |
| Promoter | Kst Infrastructure Ltd. |
| Promoter’s registered office | 7 & 8 Vipul Agora M G Road Gurugram Haryana |
| CIN | U74899DL2006PTC146934 |
| Site address | Sector-88 |
| Sector | Sector 88 |
| Tehsil / District | Faridabad / Faridabad |
| Layout plan approved | 8 Feb 2008 |
| Building plans approved | 8 Feb 2008 |
| Application submitted | 2 Aug 2019 |
Authority, hearings & orders
-
Hearing
Examination By Authority View order
Proceedings
Adjourned to 01.07.2019
-
Hearing
Adjournment View order
Proceedings
Adjourned to 22.07.2019
-
Hearing
Adjournment View order
Proceedings
Adjourned to 05.08.2019
- Application submitted online
-
Hearing
Approved And Ready For Certificate Issuing Process View order
Proceedings
Approved for Registration.
- Application received by HRERA Panchkula
-
Hearing
Extension Approved View order
Proceedings
Extension Approved
- Registration valid till
Land, licence & cost
| Land area of the project | 8 acres |
|---|---|
| Total licensed area | 8 acres |
| Licence | 1029-1030 OF 2006 DATED 29-06-2006 |
| FAR permissible / proposed | 175 / 175 |
| Estimated project cost | ₹ 193 Cr |
| Cost of land | ₹ 31.27 Cr |
| Cost of construction | ₹ 142.73 Cr |
| Infrastructure and other structures | ₹ 19 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 1.512 | 18.9% |
| Construction Of Roads | 1.048 | 13.1% |
| Pavements | 0.334 | 4.2% |
| Parks And Playgrounds | 1.1 | 13.8% |
| Green Belts | 0.421 | 5.3% |
| Vehicle Parkings | 1.129 | 14.1% |
| Club House | 0.2 | 2.5% |
| Any Other | 2.256 | 28.2% |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | Yes | WATER SUPPLY |
| Yes | ELECTRICITY | Yes |
| Sewage Disposal | Yes | STORM WATER DRAINAGE |
| Yes | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: | Sr. No. |
| Name of the facility | Estimated cost (In Lakhs)(Within the project area only) | Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) |
| 1 | INTERNAL ROADS AND PAVEMENTS | 75 |
| As Per Project Report | 2 | WATER SUPPLY SYSTEM |
| 400 | AS PER PROJECT REPORT | 3 |
| Storm Water Drainage | 50 | AS PER PROJECT REPORT |
| 4 | ELECTRICITY SUPPLY SYSTEM | 500 |
| As Per Project Report | 5 | SEWAGE TREATMENT & GARBAGE DISPOSAL |
| 50 | AS PER PROJECT REPORT | 6 |
| Street Lighting | 10 | AS PER PROJECT REPORT |
| 7 | SECURITY AND FIRE FIGHTING | 150 |
| As Per Project Report | 8 | PLAYGROUNDS AND PARKS |
| 25 | AS PER PROJECT REPORT | 9 |
| Club House/Community Centre | 100 | AS PER PROJECT REPORT |
| 10 | SHOPPING AREA | 40 |
| As Per Project Report | 11 | RENEWABLE ENERGY SYSTEM |
| 0 | AS PER PROJECT REPORT | 12 |
| School | 100 | AS PER PROJECT REPORT |
| 13 | HOSPITAL/DISPENSARY | 0 |
| Yet To Be Prepared | 14 | ANY OTHER |
| 0 | YET TO BE PREPARED | 15 |
| Sewerage | 50 | YET TO BE PREPARED |
| 16 | COVERED PARKING | 300 |
| As Per Project Report | 17 | OPEN PARKING |
| 50 | AS PER PROJECT REPORT | 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. |
| 08-02-2008 | (date) | 6. Date of approval of Building Plans |
| 08-02-2008 | (date) | (i) Details of the plots/apartments in the project: |
| Sr. No. | Plot/ apartment type | Size of the plot/carpet area of the apartments |
| Total number of plots/apartments in the project | Total size of the plots/carpet area of the apartments | Plots/apartments booked/ sold upto the date of application |
| Yet to be sold/ booked | No. of towers to be/ being constructed for booked apartments | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-A | 109818.99 | 111 |
| 12189907.89 | 65 | 46 |
| 1 | 2 | APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-B |
| 111936.78 | 108 | 12089172.24 |
| 108 | 0 | 1 |
| 3 | APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-C | 88943.7 |
| 78 | 6937608.6 | 66 |
| 12 | 1 | 4 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-D | 47369.55584 | 74 |
| 3505347.13216 | 74 | 0 |
| 1 | 5 | APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-F |
| 47369.55584 | 74 | 3505347.13216 |
| 74 | 0 | 1 |
| 6 | APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-G | 40337.60008 |
| 54 | 2178230.40432 | 54 |
| 0 | 1 | 7 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type EWS | 13019.10927 | 88 |
| 1145681.61576 | 0 | 88 |
| 1 | 8 | APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL |
| 2136.580331 | 18 | 38458.445958 |
| 18 | 0 | 1 |
| Total | 605 | 41589753.460358 |
| 459 | 146 | 8 |
| (ii) Apartments/Shops/Other Buildings:- | (a) Status of construction activities in respect of sold/booked apartments. | Type |
| Number of apartments booked/ sold | Write or Annex the stage of construction of the booked/ sold apartments in folder C | FLATS |
| 459 | YES | (b) Time schedule of completion of already booked apartments: |
| Start Date | 01-09-2008 | Earlier date of completion |
| 31-12-2020 | Revised date of completion | 31-12-2022 |
| (c) Time schedule for development of infrastructure: | Start Date | 01-09-2008 |
| Percentage completion Upto the | date of application | 75.13 |
| Projected date of completion | 31-12-2022 | (d) Provide further details in the proforma REP-I Part-C-X. |
| Yes | (e) Plan of action for completing the Project along with requisite infrastructure. | (iii) Status in respect of plotted colony:- |
| (a) | Plots | Booked/sold |
| Stage of handing over the possession (Write or Annex details) | PLOT | 0 |
| 0 | (b) Schedule for development of Infrastructure: | Start Date |
| 01-09-2008 | Percentage completion | 80.948 |
| Projected date of completion | 31-12-2022 | (c) Provide further details in the proforma REP-I Part-C-X. |
| Yes | (d) Schedule of completing the project and handing over possession of the plots. | (iv) Vehicle parkings details of the project- |
| a) Underground parking | 0 | b) Stilt parking |
| 0 | c) Covered parking | 0 |
| d) Open parking | 0 | e) Independent garages |
| 0 | (v) Quarterly schedule of development of whole/remaining part of the project: | (a) Apartments/Shops/Other Buildings |
| Expenditure incurred till the date of application (In Lakhs) | Particulars | Expenditure |
| Apartments | 11871 | Shops |
| 0 | Plots | 0 |
| Expenditure to be made in each quarter (In Lakhs) | Particulars | Year-2019 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Apartments | 125 |
| Shops | 0 | Plots |
| 0 | Particulars | Year-2020 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Apartments | 200 |
| 200 | 200 | 200 |
| Shops | 0 | 0 |
| 0 | 0 | Plots |
| 0 | 0 | 0 |
| 0 | Particulars | Year-2021 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Apartments | 250 |
| 250 | 250 | 250 |
| Shops | 0 | 0 |
| 0 | 0 | Plots |
| 0 | 0 | 0 |
| 0 | Particulars | Year-2022 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Apartments | 150 |
| 75 | 75 | 52 |
| Shops | 0 | 0 |
| 0 | 0 | Plots |
| 0 | 0 | 0 |
| 0 | (b) Infrastructure | Expenditure incurred till the date of application (In Lakhs) |
| Particulars | Expenditure | Roads & Pavements |
| 25 | Water Supply System | 300 |
| Sewerage treatment & garbage disposal | 10 | Electricity Supply System |
| 300 | Storm Water Drainage | 25 |
| Parks and Playgrounds | 10 | Clubhouse/community centres |
| 10 | Shopping area | 40 |
| Other | 0 | Covered Parking |
| 100 | Fire Fighting and Security | 25 |
| Open Parking | 25 | Sewerage |
| 25 | Street Light | 5 |
| Expenditure to be made in each quarter (In Lakhs) | Particulars | Year-2019 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 10 |
| Water Supply System | 10 | Sewerage treatment & garbage disposal |
| 10 | Electricity Supply System | 20 |
| Storm Water Drainage | 5 | Parks and Playgrounds |
| 5 | Clubhouse/community centres | 0 |
| Shopping area | 0 | Other |
| 0 | Open Parking | 5 |
| Street Light | 2 | Sewerage |
| 10 | Fire Fighting and Security | 15 |
| Covered Parking | 15 | School |
| 0 | Particulars | Year-2020 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 10 |
| 10 | 5 | 0 |
| Water Supply System | 10 | 10 |
| 10 | 10 | Sewerage treatment & garbage disposal |
| 10 | 10 | 10 |
| 0 | Electricity Supply System | 20 |
| 20 | 20 | 20 |
| Storm Water Drainage | 5 | 5 |
| 0 | 0 | Parks and Playgrounds |
| 5 | 0 | 0 |
| 0 | Clubhouse/community centres | 25 |
| 25 | 25 | 15 |
| Shopping area | 0 | 0 |
| 0 | 0 | Other |
| 0 | 0 | 0 |
| 0 | Sewerage | 5 |
| 0 | 0 | 0 |
| Fire Fighting and Security | 15 | 15 |
| 15 | 15 | Covered Parking |
| 20 | 25 | 30 |
| 0 | Open Parking | 5 |
| 5 | 5 | 0 |
| School | 0 | 20 |
| 20 | 20 | Street Light |
| 0 | 0 | 0 |
| 0 | Particulars | Year-2021 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 0 |
| 0 | 0 | 0 |
| Water Supply System | 10 | 10 |
| 10 | 10 | Sewerage treatment & garbage disposal |
| 0 | 0 | 0 |
| 0 | Electricity Supply System | 15 |
| 15 | 15 | 15 |
| Storm Water Drainage | 0 | 0 |
| 0 | 0 | Parks and Playgrounds |
| 0 | 0 | 0 |
| 0 | Clubhouse/community centres | 0 |
| 0 | 0 | 0 |
| Shopping area | 0 | 0 |
| 0 | 0 | Other |
| 0 | 0 | 0 |
| 0 | Sewerage | 0 |
| 0 | 0 | 0 |
| Fire Fighting and Security | 10 | 10 |
| 10 | 5 | Covered Parking |
| 0 | 0 | 0 |
| 0 | School | 20 |
| 20 | 0 | 0 |
| Open Parking | 0 | 0 |
| 0 | 0 | Street Light |
| 0 | 0 | 0 |
| 0 | Particulars | Year-2022 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 0 |
| 0 | 0 | Water Supply System |
| 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 |
| 0 | Electricity Supply System | 15 |
| 10 | 5 | Storm Water Drainage |
| 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 |
| 0 | Clubhouse/community centres | 0 |
| 0 | 0 | Shopping area |
| 0 | 0 | 0 |
| Other | 0 | 0 |
| 0 | It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - C-X | 1.Financial information: | Particulars |
| Remarks, if any | i. No. of Flats/Apartments constructed | 499 |
| ii. No. of Flats/ Apartments booked | 459 | iii. Total amount sale value of booked Flats, on the date of application/end of last quarter |
| 21922 Lakhs | iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter | 12402 Lakhs |
| v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter | 6827 Lakhs | vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter |
| 2693 Lakhs | vii. Amount invested in the project upto the date of application | 15623 Lakhs |
| Land cost (If any) | 2752 Lakhs | Apartments |
| 11871 Lakhs | Infrastructure | 1000 Lakhs |
| EDC/ Taxes Etc. | 0 Lakhs | viii. Balance cost to be incurred for completion of the project and delivery of possession |
| 2402 Lakhs | (a) In respect of existing allottees | 0 Lakhs |
| (b) In respect of rest of the project | 900 Lakhs | ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project |
| Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C | 0 Lakhs | x. Total liabilities against the project up-to-date. (Annex details in folder C) |
| 0 Lakhs | 2.Additional information: | Particulars |
| Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs) | Actual expenditure incurred upto the date of application. (In Lakhs) | I. INTERNAL ROADS AND PAVEMENTS |
| 75 | 25 | II. WATER SUPPLY SYSTEM |
| 400 | 300 | III. STORM WATER DRAINAGE |
| 50 | 25 | IV. ELECTRICITY SUPPLY SYSTEM |
| 500 | 300 | V. SEWAGE TREATMENT & GARBAGE DISPOSAL |
| 50 | 10 | VI. CLUB HOUSE/COMMUNITY CENTRE |
| 0 | 0 | VII. SCHOOL |
| 100 | 0 | VIII. ANY OTHER |
| 10 | 5 | IX. SOLID WASTE COLLECTION & MGMT SYSTEM |
| 0 | 0 | X. CLUBHOUSE |
| 100 | 10 | XI. NEIGHBOURHOOD SHOPPING |
| 40 | 40 | XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC. |
| 25 | 10 | XIII. COVERED PARKING |
| 300 | 200 | XIV. OPEN PARKING |
| 50 | 25 | XV. GARAGES |
| 0 | 0 | XVI. SECURITY SYSTEM |
| 150 | 25 | XVII. OTHER FACILITIES AS PER PROJECT REPORT |
| 50 | 25 | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - D |
| Accounts related information: | 1. Annex copy of the balance sheet of last 3 years | Yes |
| 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. | Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form. | Yes |
| 3. Bank account to which the deposits received from apartment buyers will be credited | Bank and Branch address | INDIAN BANK ,SHOW ROOM NO 3, GROUND FLOOR, IORCHID SQUARE, B-BLOCK SUSHANT LOK, GURGAON 122002 |
| Bank Account number | 6575407734 | IFSC code |
| IDIB000S149 | MICR code | 110019038 |
| Branch code | 00S149 | 4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority) |
| Kuldeep Singh Tanwar, 92 Arjun Marg DLF Phase-1 Gurugram | 5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details) | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - E |
| Details of the statutory approvals: | 1. Annex copies of the following in Folder E: | i. Lay out Plan |
| Yes | ii. Demarcation Plan | Yes |
| iii. Zoning Plan | Yes | iv. Building Plan |
| Yes | Site Plan | Yes |
| Floor Plan | Yes | Apartment Plans |
| Yes | Elevation Section | Yes |
| Detail of Permissible FAR | Yes | Detail of covered area achieved FAR |
| Yes | 2. Annex copies of the following in Folder E: | I. ROADS AND PAVEMENT PLAN |
| Yes | II. ELECTRICITY SUPPLY PLAN | No |
| III. Water Supply Plan | Yes | IV. SEWERAGE AND GARBAGE DISPOSAL PLAN |
| Yes | V. STROM WATER DRAINAGE | Yes |
| Vi. 10% Land To Be Transferred To The Govt. For Community Facility | Yes | VII. STREET LIGHTING PLAN |
| Yes | VIII. PARKING PLAN | Yes |
| 3. Statutory Approvals Status | Statutory Approvals | Statutory Approvals Status |
| Date | I. BUILDING PLAN | ALREADY BEEN OBTAINED |
| Na | It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees. | Signature _____________ |
| Seal _____________ | Date _____________ | FORM REP-I |
| Part - F | 1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers. | (Annex a copy in Folder F) |
| Yes | 2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules) | (Annex a copy in Folder F) |
| Yes | 3. Gist of the important provisions of the Draft Agreement | (Annex a copy in Folder F) |
| I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - G | Projects launched by the promoter in last five years: (No Projects) | I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - H | SPECIFICATION OF CONSTRUCTION |
| Specification of apartments and other buildings including the following: | 1 | FLOORING DETAILS OF VARIOUS PARTS OF HOUSE |
| Na | 2 | WALL FINISHING DETAILS |
| O.b.d. Of Berger Asian, J&n, Ici Etc. | 3 | KITCHEN DETAILS |
| Ceramic Tiles/Marble | 4 | BATHROOM FITTINGS |
| Cera,Hindware,Parryware,Gem,Lurent Or Equivalent | 5 | WOOD WORK ETC |
| Na | 6 | DOORS AND WINDOS FRAMES |
| Hardwood With Glass | 7 | GLASS WORK |
| Na | 8 | ELECTRIC FITTINGS |
| Na | 9 | CONDUCTING AND WIRING DETAILS |
| Na | 10 | CUPBOARD DETAILS |
| Na | 11 | WATER STORAGE |
| Na | 12 | LIFT DETAILS |
| Schindler Or Equivalent | 13 | EXTERNAL GLAZINGS |
| Hardwood With Glass | 13.1 | WINDOWS/GLAZINGS |
| Hardwood With Glass | 14 | DOORS |
| Hardwood With Glass | 14.1 | MAIN DOORS |
| Hardwood | 14.2 | INTERNAL DOORS |
| Hardwood With Glass | 15 | AIR CONDITIONING |
| Na | 16 | ELECTRICAL FITTINGS |
| Na | 17 | CNG PIPE LINE |
| Na | 18 | PROVISION OF WIFI AND BROADBAND FACILITY |
| Bsnl | 19 | EXTERNAL FINISHING/COLOUR SCHEME |
| Spectrum/Unitile/Textured Paint/Weather Shield Of Ici, Berger Etc. | 20 | INTERNAL FINISHING |
| O.b.d. Of Berger Asian, J&n, Ici Etc | SPECIFICATION UNIT WISE | 1 . LIVING/DINING/FOYER/FAMILY LOUNGE |
| 1 . 1 | FLOOR | CERAMIC TILES/MARBLE |
| 1 . 2 | WALLS | O.B.D. OF BERGER ASIAN, J&N, ICI ETC. |
| 1 . 3 | CEILING | NA |
| 2 . Master Bedroom/Dressroom | 2 . 1 | FLOOR |
| Ceramic Tiles/White Mosaic Flooring | 2 . 2 | WALLS |
| O.b.d. Of Berger Asian, J&n, Ici Etc. | 2 . 3 | CEILING |
| Na | 2 . 4 | MODULAR WARDROBES |
| Na | 3 . MASTER TOILET | 3 . 1 |
| Floor | CERAMIC TILES/MARBLE | 3 . 2 |
| Walls | NA | 3 . 3 |
| Ceiling | NA | 3 . 4 |
| Counters | MARBLE SLAB | 3 . 5 |
| Sanitary Ware/Cp Fittings | CERA,HINDWARE,PARRYWARE,GEM,LURENT OR EQUIVALENT | 3 . 6 |
| Fitting/Fixtures | NA | 4 . BED ROOMS |
| 4 . 1 | FLOOR | CERAMIC TILES/WHITE MOSAIC FLOORING |
| 4 . 2 | WALLS | O.B.D. OF BERGER ASIAN, J&N, ICI ETC. |
| 4 . 3 | CEILING | NA |
| 4 . 4 | WARDROBES | NA |
| 5 . Toilet | 5 . 1 | FLOOR |
| Ceramic Tiles/Marble | 5 . 2 | WALLS |
| Ceramic Tiles Of Kajaria/Orient/Bell/Somani | 5 . 3 | CEILING |
| Na | 5 . 4 | COUNTERS |
| Marble Slab | 5 . 5 | SANITARY WARE/CP FITTINGS |
| Cera,Hindware,Parryware,Gem,Lurent Or Equivalent | 5 . 6 | FIXTURES |
| Na | 6 . KITCHEN | 6 . 1 |
| Floor | CERAMIC TILES/MARBLE | 6 . 2 |
| Walls | CERAMIC TILES 2 FT. ABOVE WORKING PLATFORM,REST O.B.D. | 6 . 3 |
| Ceiling | NA | 6 . 4 |
| Counters | MARBLE / GRANIT COUNTER WITH S.S. SINK | 6 . 5 |
| Fixtures | NA | 6 . 6 |
| Kitchen Appliances | NA | 7 . UTILITY ROOMS/UTILITY BALCONY/TOILET |
| 7 . 1 | FLOOR | MOSAIC /MARBLE |
| 7 . 2 | WALLS & CEILING | MARBLE/O.B.D. |
| 7 . 3 | TOILET | CERA,HINDWARE,PARRYWARE,GEM,LURENT OR EQUIVALENT |
| 7 . 4 | BALCONY | WHITE MOSAIC FLOORING |
| 8 . Sit-Outs | 8 . 1 | FLOOR |
| Na | 8 . 2 | WALLS & CEILING |
| Na | 8 . 3 | RAILINGS |
| Na | 8 . 4 | FIXTURES |
| Na | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| List of Uploaded Documents | Sr. No. | Document Description |
| Date of Document Upload | View Document | 1 |
| Service Plans Showing The Services On The Layout Plan | 05-01-2019 | View Document |
| 2 | A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS | 07-01-2019 |
| View Document | 3 | DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD |
| 05-01-2019 | View Document | 4 |
| In Case Of Group Housing/ Commercial Sites, A Copy Of The Approved Site Plan | 05-01-2019 | View Document |
| 5 | DEMARCATION PLAN | 05-01-2019 |
| View Document | 6 | NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT |
| 02-02-2019 | View Document | 7 |
| Certificate From A Chartered Accountant Certifying That The Informstion Provided By The Applicant In Form Rep-1-C-X Is Correct As Per The Books Of Accounts/ Balance Sheet Of The Applicant | 02-02-2019 | View Document |
| 8 | ZONING PLAN | 05-01-2019 |
| View Document | 9 | CASH FLOW STATEMENT OF THE PROPOSED PROJECT |
| 10-01-2019 | View Document | 10 |
| Copy Of License Along With Schedule Of Land | 04-01-2019 | View Document |
| 11 | DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. | 16-05-2019 |
| View Document | 12 | IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN |
| 16-05-2019 | View Document | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | Documents Uploaded After Registration | Sr. No. |
| Document Description | Date of Document Upload | View Document |
| 1 | Extension Uploaded | 16-04-2026 |
| View Document | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 75 lakh | As Per Project Report |
| Water Supply System | ₹ 4 Cr | As Per Project Report |
| Storm Water Drainage | ₹ 50 lakh | As Per Project Report |
| Electricity Supply System | ₹ 5 Cr | As Per Project Report |
| Sewage Treatment & Garbage Disposal | ₹ 50 lakh | As Per Project Report |
| Street Lighting | ₹ 10 lakh | As Per Project Report |
| Security And Fire Fighting | ₹ 1.5 Cr | As Per Project Report |
| Playgrounds And Parks | ₹ 25 lakh | As Per Project Report |
| Club House/Community Centre | ₹ 1 Cr | As Per Project Report |
| Shopping Area | ₹ 40 lakh | As Per Project Report |
| School | ₹ 1 Cr | As Per Project Report |
| Sewerage | ₹ 50 lakh | Yet To Be Prepared |
| Covered Parking | ₹ 3 Cr | As Per Project Report |
| Open Parking | ₹ 50 lakh | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Building Plan | Already Been Obtained |
Specifications (as filed)
| Wall Finishing Details | O.b.d. Of Berger Asian, J&n, Ici Etc. |
|---|---|
| Kitchen Details | Ceramic Tiles/Marble |
| Bathroom Fittings | Cera,Hindware,Parryware,Gem,Lurent Or Equivalent |
| Doors And Windos Frames | Hardwood With Glass |
| Lift Details | Schindler Or Equivalent |
| External Glazings | Hardwood With Glass |
| Windows/Glazings | Hardwood With Glass |
| Doors | Hardwood With Glass |
| Main Doors | Hardwood |
| Internal Doors | Hardwood With Glass |
| Provision Of Wifi And Broadband Facility | Bsnl |
| External Finishing/Colour Scheme | Spectrum/Unitile/Textured Paint/Weather Shield Of Ici, Berger Etc. |
| Internal Finishing | O.b.d. Of Berger Asian, J&n, Ici Etc |
Source: HRERA Panchkula, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.