Joyville Gurugram V
by Joyville Shapoorji Housing Private Limited · Village - Kherki,Majra Hadust - 52, Sec 102 ,Gurugram
- RERA registration
- GGM/345/77/2019/39
- Registered on
- 6 Sep 2019
- Valid till
- 31 Dec 2024
- Project ID
- RERA-GRG-236-2019
- Land area
- 8.85 acres
- Apartments
- 92 in 1 tower
- Completion (as filed)
- 31 Dec 2024
- Estimated cost
- ₹ 121.88 Cr
RERA registration
| Registration certificate | GGM/345/77/2019/39, dated 6 Sep 2019 |
|---|---|
| Registration valid till | 31 Dec 2024 |
| Project ID | RERA-GRG-236-2019 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Joyville Gurugram V |
| Promoter | Joyville Shapoorji Housing Private Limited |
| Promoter’s registered office | 41/44 Sp Centre Minno |
| CIN | U70109MH2007PTC166942 |
| Site address | Village - Kherki,Majra Hadust - 52, Sec 102 ,Gurugram |
| Tehsil / District | Gurgaon / Gurugram |
| Layout plan approved | 12 Nov 2018 |
| Building plans approved | 12 Nov 2018 |
| Construction start (as filed) | 1 Apr 2020 |
| Completion (as filed) | 31 Dec 2024 |
| Application submitted | 16 Apr 2019 |
Authority, hearings & orders
- Application submitted online
-
Hearing
Examination By Authority
Proceedings
1st deficiency notice is sent to the promoter
-
Hearing
Objection Compliance Done
Proceedings
deficiency conveyed to the promoter
- Application received by HRERA Gurugram
-
Hearing
Objection Compliance Done
Proceedings
deficiency conveyed to the promoter
-
Hearing
Objection
Proceedings
deficiency conveyed to the promoter
-
Hearing
Approved And Ready For Certificate Issuing Process
Proceedings
RC Approved dated 06-09-2019.
- Hearing Objection
- Registration granted GGM/345/77/2019/39
- Certificate uploaded RC Approved
- Registration valid till
Land, licence & cost
| Land area of the project | 8.85 acres |
|---|---|
| Total licensed area | 17.9 acres |
| Licence | 14/2018 |
| FAR permissible / proposed | 2.5 / 2.5 |
| Estimated project cost | ₹ 121.88 Cr |
| Cost of land | ₹ 20.05 Cr |
| Cost of construction | ₹ 53.94 Cr |
| Infrastructure and other structures | ₹ 3.53 Cr |
| EDC, taxes, levies and other costs | ₹ 44.36 Cr |
How the land will be used
| Use | Sq m | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 769.44 | 2.1% |
| Construction Of Roads | 13,466.18 | 37.6% |
| Parks And Playgrounds | 17,349.63 | 48.4% |
| Green Belts | 728.29 | 2% |
| Vehicle Parkings | 3,024.33 | 8.4% |
| Electricity Sub-Station | 493 | 1.4% |
Apartments 92 units · 1 tower
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 11,218.48 | - | 92 |
Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | ALL READY CONNECTED | Yes |
| Water Supply | HUDA | Yes |
| Electricity | DHBVN | Yes |
| Sewage Disposal | Yes | STORM WATER DRAINAGE |
| HUDA | Yes | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: |
| Sr. No. | Name of the facility | Estimated cost (In Lakhs)(Within the project area only) |
| Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) | 1 | INTERNAL ROADS AND PAVEMENTS |
| 36 | AS PER PROJECT REPORT | 2 |
| Water Supply System | 11 | AS PER PROJECT REPORT |
| 3 | STORM WATER DRAINAGE | 9 |
| As Per Project Report | 4 | ELECTRICITY SUPPLY SYSTEM |
| 0 | YET TO BE PREPARED | 5 |
| Sewage Treatment & Garbage Disposal | 24 | AS PER PROJECT REPORT |
| 6 | STREET LIGHTING | 6 |
| As Per Project Report | 7 | SECURITY AND FIRE FIGHTING |
| 26 | AS PER PROJECT REPORT | 8 |
| Playgrounds And Parks | 1 | AS PER PROJECT REPORT |
| 9 | CLUB HOUSE/COMMUNITY CENTRE | 0 |
| Yet To Be Prepared | 10 | SHOPPING AREA |
| 0 | YET TO BE PREPARED | 11 |
| Renewable Energy System | 0 | YET TO BE PREPARED |
| 12 | SCHOOL | 0 |
| Yet To Be Prepared | 13 | HOSPITAL/DISPENSARY |
| 0 | YET TO BE PREPARED | 14 |
| Any Other | 48 | AS PER PROJECT REPORT |
| 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. | 12-11-2018 | (date) |
| 6. Date of approval of Building Plans | 12-11-2018 | (date) |
| 7. New projects: | i) Likely date of starting the construction work | 01-04-2020 |
| ii) Likely date of completing the project | 31-12-2024 | iii) Sizes of the plots to be offered in the project |
| Sr. No | Plot Area(In Square Meter) | Number of plots in the project |
| 1 | 0 | 0 |
| Total | 0 | iv. Type of apartments to be constructed in the project: |
| Type | Carpet area(In Square Meter) | Number of apartments |
| Number of towers | Apartment/Shops/Other Buildings | 11218.48 |
| 92 | 1 | (vi) Quarterly schedule of development of whole/remaining part of the project: |
| (c) Apartments/Shops/Other Buildings | Expenditure incurred till the date of application (In Lakhs) | Particulars |
| Expenditure | Apartments | 0 |
| Shops | 0 | Plots |
| 0 | EDC | 266 |
| Idc | 94 | Land Cost |
| 2005 | Expenditure to be made in each quarter (In Lakhs) | Particulars |
| Year-2019 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 326 | 163 | 184 |
| 241 | Shops | 0 |
| 0 | 0 | 0 |
| Plots | 0 | 0 |
| 0 | 0 | (d) Infrastructure |
| Expenditure incurred till the date of application (In Lakhs) | Particulars | Expenditure |
| Roads & Pavements | 0 | Water Supply System |
| 0 | Sewerage treatment & garbage disposal | 0 |
| Electricity Supply System | 0 | Storm Water Drainage |
| 0 | Parks and Playgrounds | 0 |
| Clubhouse/community centres | 0 | Shopping area |
| 0 | Other | 0 |
| Expenditure to be made in each quarter (In Lakhs) | Particulars | Expenditure to be made in each quarter ( |
| 2019 | ) | Apr-June |
| July-Sep | Oct-Dec | Jan-Mar |
| It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - D |
| Accounts related information: | 1. Annex copy of the balance sheet of last 3 years | Yes |
| 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. | Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form. | No |
| 3. Bank account to which the deposits received from apartment buyers will be credited | Bank and Branch address | INDUSIND BANK, NARIMAN POINT MUMBAI |
| Bank Account number | 251220010016 | IFSC code |
| INDB0000006 | MICR code | 400234004 |
| Branch code | 000006 | 4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority) |
| Himanshu Jani b-102 whight | arch Mathuradas road | kandivali w near vajna wadi |
| 5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details) | - | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - E |
| Details of the statutory approvals: | 1. Annex copies of the following in Folder E: | i. Lay out Plan |
| Yes | ii. Demarcation Plan | Yes |
| iii. Zoning Plan | Yes | iv. Building Plan |
| Yes | Site Plan | Yes |
| Floor Plan | Yes | Apartment Plans |
| Yes | Elevation Section | Yes |
| Detail of Permissible FAR | Yes | Detail of covered area achieved FAR |
| Yes | 2. Annex copies of the following in Folder E: | I. ROADS AND PAVEMENT PLAN |
| Yes | II. ELECTRICITY SUPPLY PLAN | Yes |
| III. Water Supply Plan | Yes | IV. SEWERAGE AND GARBAGE DISPOSAL PLAN |
| Yes | V. STROM WATER DRAINAGE | Yes |
| Vi. 10% Land To Be Transferred To The Govt. For Community Facility | Yes | VII. STREET LIGHTING PLAN |
| Yes | VIII. PARKING PLAN | Yes |
| 3. Statutory Approvals Status | Statutory Approvals | Statutory Approvals Status |
| Date | I. BUILDING PLAN SANCTION | ALREADY BEEN OBTAINED |
| 12-11-2018 | II. ENVIRONMENT CLEARANCE | ALREADY BEEN OBTAINED |
| 20-08-2018 | III. SERVICE PLAN ESTIMATE | ALREADY BEEN OBTAINED |
| 04-02-2019 | IV. FIRE SCHEME | ALREADY BEEN OBTAINED |
| 05-03-2019 | It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees. | Signature _____________ |
| Seal _____________ | Date _____________ | FORM REP-I |
| Part - F | 1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers. | (Annex a copy in Folder F) |
| Yes | 2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules) | (Annex a copy in Folder F) |
| Yes | 3. Gist of the important provisions of the Draft Agreement | (Annex a copy in Folder F) |
| I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - G | Projects launched by the promoter in last five years: (No Projects) | I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - H | SPECIFICATION OF CONSTRUCTION |
| Specification of apartments and other buildings including the following: | 1 | FLOORING DETAILS OF VARIOUS PARTS OF HOUSE |
| Vitrified Or Laminated Wooden Flooring Or Ceramic Tile. | 2 | WALL FINISHING DETAILS |
| Obd Or Ceramic Tile | 3 | KITCHEN DETAILS |
| Kitchen Counter Top – Black Granite. | SINK – S.S. SINK WITHOUT DRAINBOARD. | 4 |
| Bathroom Fittings | CONCEALED BATHROOM FITTINGS. | 5 |
| Wood Work Etc | - | 6 |
| Doors And Windos Frames | DOOR FRAME : RED MIRANTI WITH PAINT | WINDOW FRAME : ALUMINIUM - POWDER - COATED |
| 7 | GLASS WORK | WINDOWS WITH CLEAR GLASS. |
| 8 | ELECTRIC FITTINGS | ALL SWITCHES AND SOCKETS WILL BE OF MODULAR TYPE - ANCHOR ROMA OR EQUIVALENT. |
| 9 | CONDUCTING AND WIRING DETAILS | CONCEALED TYPE BELOW FALSE CEILING. |
| 10 | CUPBOARD DETAILS | - |
| 11 | WATER STORAGE | NOT PROVIDE WITHIN THE FLATS. |
| 12 | LIFT DETAILS | 2NOS. PASSENGER AND 1 NOS. SERVICE ELEVATOR. |
| 13 | EXTERNAL GLAZINGS | - |
| 13.1 | WINDOWS/GLAZINGS | POWDER - COATED ALUMINIUM WINDOW WITH CLEAR GLASS - 5 MM THICK |
| 14 | DOORS | WOODEN FLUSH DOOR WITH LAMINATE ON BOTH SIDE. |
| 14.1 | MAIN DOORS | WOODEN FLUSH DOOR WITH LAMINATE ON BOTH SIDE. |
| 14.2 | INTERNAL DOORS | WOODEN FLUSH DOOR WITH LAMINATE ON BOTH SIDE. |
| 15 | AIR CONDITIONING | PROVISION FOR SPLIT AC IN BED ROOM AND LIVING ROOM. |
| 16 | ELECTRICAL FITTINGS | ALL SWITCHES AND SOCKETS WILL BE OF MODULAR TYPE - ANCHOR ROMA OR EQUIVALENT. |
| 17 | CNG PIPE LINE | PROVISION FOR CNG PIPE LINE. |
| 18 | PROVISION OF WIFI AND BROADBAND FACILITY | PROVISION OF WI-FI AND BROAD BAND FACILITY |
| 19 | EXTERNAL FINISHING/COLOUR SCHEME | EXTERIOR WALLS FINISHED WITH TEXTURED/WEATHER SHIELD PAYMENT |
| 20 | INTERNAL FINISHING | AS ABOVE DETAILED. |
| Specification Unit Wise | 1 . LIVING/DINING/FOYER/FAMILY LOUNGE | 1 . 1 |
| Floor | VITRIFIED TILE | 1 . 2 |
| Walls | OBD PAINT. | 1 . 3 |
| Ceiling | OBD PAINT. | 2 . MASTER BEDROOM/DRESSROOM |
| 2 . 1 | FLOOR | VITRIFIED TILE OR LAMINATED WOODEN FLOORING |
| 2 . 2 | WALLS | OBD PAINT. |
| 2 . 3 | CEILING | OBD PAINT. |
| 2 . 4 | MODULAR WARDROBES | - |
| 3 . Master Toilet | 3 . 1 | FLOOR |
| Ceramic Tiles | 3 . 2 | WALLS |
| Ceramic Tiles | 3 . 3 | CEILING |
| Modular False Ceiling | 3 . 4 | COUNTERS |
| - | 3 . 5 | SANITARY WARE/CP FITTINGS |
| Sanitary Fixtures Provided From Somany/Cera/Johnson Or Equivalent. | CP FITTINGS PROVIDED FROM JOHNSON / ESSCO/CERA OR EQUIVALENT. | 3 . 6 |
| Fitting/Fixtures | CONCEALED TYPE BELOW FALSE CEILING. | 4 . BED ROOMS |
| 4 . 1 | FLOOR | VITRIFIED TILE OR LAMINATED WOODEN FLOORING |
| 4 . 2 | WALLS | OBD PAINT. |
| 4 . 3 | CEILING | OBD PAINT. |
| 4 . 4 | WARDROBES | NA |
| 5 . Toilet | 5 . 1 | FLOOR |
| Ceramic Tiles | 5 . 2 | WALLS |
| Ceramic Tiles | 5 . 3 | CEILING |
| Modular False Ceiling | 5 . 4 | COUNTERS |
| - | 5 . 5 | SANITARY WARE/CP FITTINGS |
| Sanitary Fixtures Provided From Somany/Cera/Johnson Or Equivalent. | CP FITTINGS PROVIDED FROM JOHNSON / ESSCO/CERA OR EQUIVALENT | 5 . 6 |
| Fixtures | CONCEALED TYPE BELOW FALSE CEILING. | 6 . KITCHEN |
| 6 . 1 | FLOOR | VITRIFIED TILES |
| 6 . 2 | WALLS | PROVISION OF DADO TILES WILL BE UPTO 600 MM ABOVE COUNTER TOP. BALANCE WALL SURFACE WILL BE FINISHED WITH GYPSUM PLASTER + OBD PAINT. |
| 6 . 3 | CEILING | OBD PAINT |
| 6 . 4 | COUNTERS | BLACK GRANITE TOP. |
| 6 . 5 | FIXTURES | - |
| 6 . 6 | KITCHEN APPLIANCES | NA |
| 7 . Utility Rooms/Utility Balcony/Toilet | 7 . 1 | FLOOR |
| Na | 7 . 2 | WALLS & CEILING |
| Na | 7 . 3 | TOILET |
| Na | 7 . 4 | BALCONY |
| Na | 8 . SIT-OUTS | 8 . 1 |
| Floor | CERAMIC TILE. | 8 . 2 |
| Walls & Ceiling | OBD | 8 . 3 |
| Railings | - | 8 . 4 |
| Fixtures | - | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | List of Uploaded Documents | Sr. No. |
| Document Description | Date of Document Upload | View Document |
| 1 | COPY OF LICENSE ALONG WITH SCHEDULE OF LAND | 16-04-2019 |
| View Document | 2 | IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN |
| 16-04-2019 | View Document | 3 |
| Zoning Plan | 16-04-2019 | View Document |
| 4 | IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN | 16-04-2019 |
| View Document | 5 | DEMARCATION PLAN |
| 16-04-2019 | View Document | 6 |
| Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed. | 16-04-2019 | View Document |
| 7 | SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN | 29-06-2019 |
| View Document | 8 | CASH FLOW STATEMENT OF THE PROPOSED PROJECT |
| 29-06-2019 | View Document | 9 |
| Non Default Certificate From A Chartered Accountant | 29-06-2019 | View Document |
| 10 | A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS | 29-06-2019 |
| View Document | 11 | CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT |
| 29-06-2019 | View Document | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | Documents Uploaded After Registration | Sr. No. |
| Document Description | Date of Document Upload | View Document |
| 1 | OC uploaded | 10-07-2025 |
| View Document | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 36 lakh | As Per Project Report |
| Water Supply System | ₹ 11 lakh | As Per Project Report |
| Storm Water Drainage | ₹ 9 lakh | As Per Project Report |
| Sewage Treatment & Garbage Disposal | ₹ 24 lakh | As Per Project Report |
| Street Lighting | ₹ 6 lakh | As Per Project Report |
| Security And Fire Fighting | ₹ 26 lakh | As Per Project Report |
| Playgrounds And Parks | ₹ 1 lakh | As Per Project Report |
| Any Other | ₹ 48 lakh | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Building Plan Sanction | Already Been Obtained | 12 Nov 2018 |
| Environment Clearance | Already Been Obtained | 20 Aug 2018 |
| Service Plan Estimate | Already Been Obtained | 4 Feb 2019 |
| Fire Scheme | Already Been Obtained | 5 Mar 2019 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Vitrified Or Laminated Wooden Flooring Or Ceramic Tile. |
|---|---|
| Wall Finishing Details | Obd Or Ceramic Tile |
| Kitchen Details | Kitchen Counter Top – Black Granite. |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.