Registration period overHRERA PanchkulaInterim Rera

Ibiza Town

by Krrish Shalimar Projects Pvt Ltd · Sector-39, Surajkund Road, Faridabad.

RERA registration
216 OF 2017 Lapsed Project
Valid till
30 Jun 2021
Project ID
RERA-PKL-73-2018
Land area
10.15 acres
Estimated cost
₹ 5.14 Cr

RERA registration

Registration certificate216 OF 2017 Lapsed Project
Registration valid till30 Jun 2021
Project IDRERA-PKL-73-2018
AuthorityHRERA Panchkula (Interim Rera)
Project type (as filed)Ongoing
Project nameIbiza Town
PromoterKrrish Shalimar Projects Pvt Ltd
Promoter’s registered office406, 4TH Floor, Elegance Tower, 8 Jasola District Centre, New Delhi - 110025
CINU55101DL2010PTC205976
Site addressSector-39, Surajkund Road, Faridabad.
SectorSector 39
Tehsil / DistrictFaridabad / Faridabad
Application submitted15 Apr 2019

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyPut up for the first hearing.
Next hearingNot Required
  1. Hearing Examination By Authority View order
    Proceedings

    Adjournment 

  2. Application received by HRERA Panchkula
  3. Hearing Adjournment View order
    Proceedings

    Adjourned to 18.02.2019

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 11.03.2019

  2. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Approved for extension.

  3. Application submitted online
  1. Registration valid till

Land, licence & cost

Land area of the project10.15 acres
Total licensed area10.15 acres
Licence111 of 2011
FAR permissible / proposed14.8924764581 / 14.8924764581
Estimated project cost₹ 5.14 Cr
Cost of land₹ 0.85 Cr
Cost of construction₹ 2.55 Cr
EDC, taxes, levies and other costs₹ 0.26 Cr

How the land will be used

UseAcresShare
Plots To Be Sold0.9959.7%
Construction Of Roads3.0529.7%
Green Belts1.3613.2%
Vehicle Parkings4.1440.3%
Electricity Sub-Station0.5044.9%
Club House0.11%
Sewage And Solid Waste Treatment Facility0.1241.2%

External services

ServiceProvided byApproval taken
RoadsHUDANo
Water SupplyHUDAYes
ElectricityDHVBNYes
Sewage DisposalYesSTORM WATER DRAINAGE
HUDANo4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)1INTERNAL ROADS AND PAVEMENTS
250YET TO BE PREPARED2
Water Supply System425YET TO BE PREPARED
3STORM WATER DRAINAGE38.56
Yet To Be Prepared4ELECTRICITY SUPPLY SYSTEM
800YET TO BE PREPARED5
Sewage Treatment & Garbage Disposal132.37YET TO BE PREPARED
6STREET LIGHTING38.94
Yet To Be Prepared7SECURITY AND FIRE FIGHTING
449.48YET TO BE PREPARED8
Playgrounds And Parks500YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE350
Yet To Be Prepared10SHOPPING AREA
200YET TO BE PREPARED11
Renewable Energy System20.15YET TO BE PREPARED
12SCHOOL-1
Yet To Be Prepared13HOSPITAL/DISPENSARY
0YET TO BE PREPARED14
Any Other0YET TO BE PREPARED
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.NA(date)
6. Date of approval of Building PlansNA(date)
(i) Details of the plots/apartments in the project:Sr. No.Plot/ apartment type
Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectTotal size of the plots/carpet area of the apartments
Plots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type A1346.58
152204680.160
002
APARTMENT/SHOPS/OTHER BUILDINGS Type B1986.7168
135096.2800
03APARTMENT/SHOPS/OTHER BUILDINGS Type C
2502.2140100088.4
000
4APARTMENT/SHOPS/OTHER BUILDINGS Type D3634.14
414536.560
005
APARTMENT/SHOPS/OTHER BUILDINGS Type E4440.902
8881.800
0Total266
463283.200
0(ii) Apartments/Shops/Other Buildings:-(a) Status of construction activities in respect of sold/booked apartments.
TypeNumber of apartments booked/ soldWrite or Annex the stage of construction of the booked/ sold apartments in folder C
3 Bhk Deluxe1120
4 Bhk Deluxe450
4 Bhk Premium40
4 Bhk Deluxe Penthouse30
4 Bhk Premium Penthouse20
(b) Time schedule of completion of already booked apartments:Start Date28-02-2013
Earlier date of completion28-11-2016Revised date of completion
31-12-2018(c) Time schedule for development of infrastructure:Start Date
28-03-2015Percentage completion Upto the   date of application
0Projected date of completion31-12-2018
(d) Provide further details in the proforma REP-I Part-C-X.(e) Plan of action for completing the Project along with requisite infrastructure.OC APPLIED FOR 4 TOWERS INCLUDING EWS AND SHOPPING AREA
Balance 3 Towers Are In Progress(iii) Status in respect of plotted colony:-(a)
PlotsBooked/soldStage of handing over the possession (Write or Annex details)
Plot00
(b) Schedule for development of Infrastructure:Start Date28-03-2015
Percentage completion0Projected date of completion
31-12-2018(c) Provide further details in the proforma REP-I Part-C-X.(d) Schedule of completing the project and handing over possession of the plots.
(iv) Vehicle parkings details of the project-a) Underground parking355
b) Stilt parking79c) Covered parking
0d) Open parking57
e) Independent garages0(v) Quarterly schedule of development of whole/remaining part of the project:
(a) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureApartments20962.27
Shops0Plots
0Expenditure to be made in each quarter (In Lakhs)Particulars
Expenditure to be made in each quarter ()Apr-June
July-SepOct-DecJan-Mar
(b) InfrastructureExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureRoads & Pavements20
Water Supply System271.58Sewerage treatment & garbage disposal
43.54Electricity Supply System247.54
Storm Water Drainage0Parks and Playgrounds
49.56Clubhouse/community centres17.85
Shopping area0Other
0Expenditure to be made in each quarter (In Lakhs)Particulars
Expenditure to be made in each quarter ()Apr-June
July-SepOct-DecJan-Mar
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - C-X
1.Financial information:ParticularsRemarks, if any
i. No. of Flats/Apartments constructed266ii. No. of Flats/ Apartments booked
166iii. Total amount sale value of booked Flats, on the date of application/end of last quarter25967 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter22766 Lakhsv. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
3487 Lakhsvi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter3201 Lakhs
vii. Amount invested in the project upto the date of application38594 LakhsLand cost (If any)
8548 LakhsApartments21343 Lakhs
Infrastructure721 LakhsEDC/ Taxes Etc.
7983 Lakhsviii. Balance cost to be incurred for completion of the project and delivery of possession0 Lakhs
(a) In respect of existing allottees49.50 Lakhs(b) In respect of rest of the project
30.35 Lakhsix. The amount of loan raised from the banks/ financial institutions/ private persons against the projectAnnex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
12000 Lakhsx. Total liabilities against the project up-to-date. (Annex details in folder C)19420 Lakhs
2.Additional information:ParticularsEstimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)I. INTERNAL ROADS AND PAVEMENTS250
20.75II. WATER SUPPLY SYSTEM425
271.58III. STORM WATER DRAINAGE400
43.54IV. ELECTRICITY SUPPLY SYSTEM800
247.54V. SEWAGE TREATMENT & GARBAGE DISPOSAL0
0VI. CLUB HOUSE/COMMUNITY CENTRE0
0VII. SCHOOL0
0VIII. ANY OTHER0
0IX. SOLID WASTE COLLECTION & MGMT SYSTEM30
2.88X. CLUBHOUSE350
17.85XI. NEIGHBOURHOOD SHOPPING0
0XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.500
49.56XIII. COVERED PARKING300
300XIV. OPEN PARKING0
0XV. GARAGES0
0XVI. SECURITY SYSTEM60
0XVII. OTHER FACILITIES AS PER PROJECT REPORT0
0I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - DAccounts related information:
1. Annex copy of the balance sheet of last 3 yearsYes2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch addressSTATE BANK OF INDIA, GOKHALE MARG, LUCKNOWBank Account number
34179712365IFSC codeSBIN0004166
MICR code226002041Branch code
041664. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Amit Katyal, 406, Elegance Tower, 8 Jasola District Centre, New Delhi
Rajesh Katyal, 406, Elegance Tower, 8 Jasola District Centre, New DelhiKhalid Masood, 406, Elegance Tower, 8 Jasola District Centre, New DelhiKunal Seth, 406, Elegance Tower, 8 Jasola District Centre, New Delhi
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - EDetails of the statutory approvals:
1. Annex copies of the following in Folder E:i. Lay out PlanYes
ii. Demarcation PlanYesiii. Zoning Plan
Yesiv. Building PlanYes
Site PlanYesFloor Plan
YesApartment PlansNo
Elevation SectionYesDetail of Permissible FAR
YesDetail of covered area achieved FARYes
2. Annex copies of the following in Folder E:I. ROADS AND PAVEMENT PLANYes
II. Electricity Supply PlanYesIII. WATER SUPPLY PLAN
YesIV. SEWERAGE AND GARBAGE DISPOSAL PLANYes
V. Strom Water DrainageYesVI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY
YesVII. STREET LIGHTING PLANYes
Viii. Parking PlanYes3. Statutory Approvals Status
Statutory ApprovalsStatutory Approvals StatusDate
I. ForestAPPLIED FOR BUT YET TO RECEIVENA
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________Seal _____________
Date _____________FORM REP-IPart - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)Yes
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)Yes
3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - G
Projects launched by the promoter in last five years: (No Projects)I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - HSPECIFICATION OF CONSTRUCTIONSpecification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMASTER BR - LAMINATED/ WOODEN
Mbr Toilet Designer TileOTHER BEDROOMS IMPORTED MARBLEOTHER BEDROOM TOILET VITRIFIED TILE
Servant Room And Toilet Ceramic TileKITCHEN GRANITEAPARTMENT BALCONY VITRIFIED TILE
Main Staircase GraniteFIRE STAIRCASE KOTA STONE2
Wall Finishing DetailsPAINT AND POP ACRYLIC EMULSION3
Kitchen DetailsMODULAR MAKE MAGPPIE4
Bathroom FittingsBRAVAT AND ROCA5
Wood Work EtcTEAK AND MARANDI6
Doors And Windos FramesVEER DOOR AND LAMINATED DOORWINDOWS HAVE TOUGHENED GLASS
7GLASS WORKTOUGHENED GLASS IN MASTER AND OTHER BEDROOM TOILETS
8ELECTRIC FITTINGSCONDUIT USED HEAVY DUTY AKG OR BEC MAKE
Wire Used Is Frls Polycab Or Hewels MakeSWITCH SOCKET PANASONIC MAKELIGHTS ARE LED BASED GEAR UP MAKE
9CONDUCTING AND WIRING DETAILSCONDUIT USED HEAVY DUTY AKG OR BEC MAKE
Wire Used Is Frls Polycab Or Hewels Make10CUPBOARD DETAILS
Pre Lam Mdf Board11WATER STORAGE
2 Nos. Fire Tank Of 100 Kl Each1 RAW WATER TANK OF CAPACITY 120 KL1 DOMESTIC WATER TANK OF 120 KL
1 Treated Water Tank Of 140 KlOVERHEAD TANK INCLUDES 1 WATER TANK OF 33400 LITRES AND 1 FLUSHING TANK OF 5000 LITRES ON THE TERRACE OF EVERY TOWER12
Lift Details2 NOS. 15 PASSENGER 1020 KGS EACH IN EACH TOWER KONE MAKESPEED 1.75 METRES PER SECOND
Car Ceiling And Panels To Be SS Hairline FinishCAR ILLUMINATION WITH LED LIGHTS13
External GlazingsNA13.1
Windows/GlazingsNA14
DoorsNA14.1
Main DoorsVENEER DOORS14.2
Internal DoorsOTHER ROOMS LAMINATED DOORSERVANT TOILET PAINTED DOOR
Utility Balcony Door Upvc Fenesta Make15AIR CONDITIONING
Each Flat Is Quipped With Vrv Unit Of Various Capacities As Per Requirement 8 Hp To 12 Hp With Samsung Make16ELECTRICAL FITTINGS
Conduit Used Heavy Duty Akg Or Bec MakeWIRE USED IS FRLS POLYCAB OR HEWELS MAKESWITCH SOCKET PANASONIC MAKE
Lights Are Led Based Gear Up Make17CNG PIPE LINE
Na18PROVISION OF WIFI AND BROADBAND FACILITY
We Are Proposing Ftth Facility For Every Individual Customers At Present.19EXTERNAL FINISHING/COLOUR SCHEME
Texture Paint From Asian Paint20INTERNAL FINISHING
Acrylic EmulsionSPECIFICATION UNIT WISE1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1FLOORIMPORTED MARBLE
1 . 2WALLSACRYLIC EMULSION
1 . 3CEILINGACRYLIC EMULSION
2 . Master Bedroom/Dressroom2 . 1FLOOR
Laminated Or Wooden2 . 2WALLS
Acrylic Emulsion2 . 3CEILING
Acrylic Emulsion2 . 4MODULAR WARDROBES
Wooden Wardrobe Magppie Make3 . MASTER TOILET3 . 1
FloorDESIGNER TILE3 . 2
WallsDESIGNER TILE3 . 3
CeilingACRYLIC EMULSION3 . 4
CountersNA3 . 5
Sanitary Ware/Cp FittingsROCA OR EQUIVALENT QUALITY CP FITTING3 . 6
Fitting/FixturesVANITY AND GEYSER4 . BED ROOMS
4 . 1FLOORIMPORTED MARBLE
4 . 2WALLSACRYLIC EMULSION
4 . 3CEILINGACRYLIC EMULSION
4 . 4WARDROBESWOODEN WARDROBE MAGPPIE MAKE
5 . Toilet5 . 1FLOOR
Vitrified Tile5 . 2WALLS
Vitrified Tile5 . 3CEILING
Acrylic Emulsion5 . 4COUNTERS
Na5 . 5SANITARY WARE/CP FITTINGS
Roca Or Equivalent Quality Cp Fitting5 . 6FIXTURES
Vanity And Geyser6 . KITCHEN6 . 1
FloorGRANITE6 . 2
WallsGRANITE OR TILE AS PER DESIGN6 . 3
CeilingACRYLIC EMULSION6 . 4
CountersNA6 . 5
FixturesMODULAR MAKE MAGGPIE6 . 6
Kitchen AppliancesDOUBLE BOWL SINK WITH DRAIN BOARD, HOVE, CHIMNEY AND GEYSER7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1FLOORVITRIFIED TILE
7 . 2WALLS & CEILINGEXTERIOR GRADE PAINT
7 . 3TOILETOBD
7 . 4BALCONYMS OR SS RAILING AS PER DESIGN
8 . Sit-Outs8 . 1FLOOR
Tiles8 . 2WALLS & CEILING
Brick Or Aac Blocks8 . 3RAILINGS
Ms Or SS Railing As Per Design8 . 4FIXTURES
Electrical FixturesI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
List of Uploaded DocumentsSr. No.Document Description
Date of Document UploadView Document1
Service Plans Showing The Services On The Layout Plan15-04-2019View Document
2DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.15-04-2019
View Document3COPY OF LICENSE ALONG WITH SCHEDULE OF LAND
24-11-2018View Document4
In Case Of Group Housing/ Commercial Sites, A Copy Of The Approved Site Plan03-12-2018View Document
5A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS03-12-2018
View Document6NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
18-12-2018View Document7
In Case Of Plotted Colony, The Latest Layout Plan18-12-2018View Document
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________Documents Uploaded After Registration
Sr. No.Document DescriptionDate of Document Upload
View Document1Extension of Registration.
17-01-2020View Document2
Second extension of Registration.28-07-2020View Document
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________Print

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 2.5 CrYet To Be Prepared
Water Supply System₹ 4.25 CrYet To Be Prepared
Storm Water Drainage₹ 38.56 lakhYet To Be Prepared
Electricity Supply System₹ 8 CrYet To Be Prepared
Sewage Treatment & Garbage Disposal₹ 1.32 CrYet To Be Prepared
Street Lighting₹ 38.94 lakhYet To Be Prepared
Security And Fire Fighting₹ 4.49 CrYet To Be Prepared
Playgrounds And Parks₹ 5 CrYet To Be Prepared
Club House/Community Centre₹ 3.5 CrYet To Be Prepared
Shopping Area₹ 2 CrYet To Be Prepared
Renewable Energy System₹ 20.15 lakhYet To Be Prepared

Statutory approvals

ApprovalStatusDate
ForestApplied For But Yet To Receive

Specifications (as filed)

Flooring Details Of Various Parts Of HouseMaster Br - Laminated/ Wooden

Source: HRERA Panchkula, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Ibiza Town?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.