Registration period overHRERA Gurugram

Hightown

by Silverglades Infrastructure Private Limited · Revenue Estate Of Village Sukhrali, Sector 28

RERA registration
GGM/406/138/2020/22
Registered on
1 Sep 2020
Valid till
10 Oct 2026
Project ID
RERA-GRG-337-2019
Apartments
306 in 2 towers
Completion (as filed)
11 Oct 2025
Estimated cost
₹ 523.61 Cr

RERA registration

Registration certificateGGM/406/138/2020/22, dated 1 Sep 2020
Registration valid till10 Oct 2026
Project IDRERA-GRG-337-2019
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameHightown
PromoterSilverglades Infrastructure Private Limited
Promoter’s registered office404, Nirmal Tower, 26, Barakhamba Road, New Delhi-110001
CINU45201DL2005PTC138897
Site addressRevenue Estate Of Village Sukhrali, Sector 28
SectorSector 28
Tehsil / DistrictGurgaon / Gurugram
Layout plan approved12 Oct 2020
Building plans approved12 Oct 2020
Construction start (as filed)15 Oct 2020
Completion (as filed)11 Oct 2025
Application submitted16 Jan 2020

Authority, hearings & orders

Current statusExtension Certificate Uploaded
Initial scrutiny1st deficiency notice sent to the promoter
Next hearingNot Required
  1. Application submitted online
  2. Notice sent to the promoter By hand
  3. Hearing Examination By Authority
    Proceedings

    Deficiencies were pointed out vide notice no. HARERA/GGM/RPIN/2311 dated 28.01.2020. Accordingly, reply was submitted by the promoter on 06.02.2020 which was scrutinized and found that still there are major deficiencies which needs to be rectified by the promoter which are as follows: 1.    Copy of approved service estimates and plans not submitted. 2.    Copy of fire-fighting scheme approval not submitted 3.    Copy of approved building plan not submitted. 4.    Non encumbrance certificate not submitted 5.    Renewal of license no. 110 of 2013 not submitted. 6.    Online corrections not done by the promoter. 7.    Copy of mutation, jamabandi and aks-shijra certified on the recent date needs to be provided. 8.    Mining permission needs to be submitted. 9.    approvals of storm water drainage and sewerage applied but not submitted 10. Deficit fee cannot be calculated as approve building plan not submitted till date. Fees will be calculated after submission of approved building plan. 11. Information to revenue department about the fact that project land licensed and bonded for setting up of a colony not informed to the revenue department for entry in the record of ownership. 12. Copy of super imposed demarcation plan on the approved layout plan showing khasra numbers not submitted. 13. Allotment letter, application form, conveyance deed and payment receipt in the prescribed format needs to be submitted. 14. Revised builder buyer agreement as per prescribed format not submitted 15. Brochure of HIGHTOWN needs to be submitted. Hence, the promoter is given 15 days’ time the submit the deficit documents. Accordingly, the matter is fixed for hearing on 16.03.2020

  1. Hearing Objection
  2. Hearing Objection View order
    Proceedings

    Intimation about the online hearing was conveyed to the promoter vide email dated 05.06.2020. Since no one appeared on behalf of the promoter for the online hearing. 3 opportunities of hearing were given to the promoter, but he was not able to submit the mandatory documents as conveyed to him vide email dated 06.06.2020 and notice dated 28.01.2020, 29.02.2020. Hence, the authority has decided to issue show cause for the rejection of real estate project namely Hightown being developed by Silverglades Infrastructure Pvt Ltd following the due procedure as provided under section-5 of the Real Estate (Regulation and Development) Act 2016 and Rule-5 of the Haryana Real Estate (Regulation and Development) Rules, 2017. 

  3. Hearing Objection
    Proceedings

    Intimation about the online hearing was conveyed to the promoter vide email dated 05.06.2020. Since no one appeared on behalf of the promoter for the online hearing. 3 opportunities of hearing were given to the promoter, but he was not able to submit the mandatory documents as conveyed to him vide email dated 06.06.2020 and notice dated 28.01.2020, 29.02.2020. Hence, the authority has decided to issue show cause for the rejection of real estate project namely Hightown being developed by Silverglades Infrastructure Pvt Ltd following the due procedure as provided under section-5 of the Real Estate (Regulation and Development) Act 2016 and Rule-5 of the Haryana Real Estate (Regulation and Development) Rules, 2017. 

  1. Hearing Adjournment
    Proceedings

    Adjourned due to Video Conference technical issue, for dated 28.07.2020

  2. Hearing Adjournment
    Proceedings

    Adjourned for 13.08.2020.

  3. Hearing Adjournment
    Proceedings

    On the request of the promoter the matter was adjourned to next date of hearing on 1st September 2020 on account of the fact that their approval of TOD policy from the Department of Town & Country Planning are at advance stage.

  1. Hearing Approved And Ready For Certificate Issuing Process
    Proceedings

              During personal hearing, Sh. Vishnu Shokeen is present on behalf of the promoter. The promoter has submitted the affidavit declaring that he will submit the approved service estimates and plan, fire scheme approval, mining permission within 3 months. The promoter has obtained the in principal approval of building plan from DTCP, Haryana vide memo no. ZP-1085-JE(SK)-2019/7057 dated 08.03.2019. Therefore, the authority has decided to grant registration certificate on the basis of provisional building plan and direct the promoter to submit the final approval of building plan within 3 months along with other pending approvals from the date of grant of registration certificate. No sale shall be effected without approval of final building plan as per condition 4(F) imposed by the DTCP, Haryana in the in principal approved building plan.

  2. Hearing Objection
  3. Registration granted GGM/406/138/2020/22
  1. Registration valid till

Land, licence & cost

Licence110 of 2013
FAR permissible / proposed362 / 362
Estimated project cost₹ 523.61 Cr
Cost of land₹ 65.98 Cr
Cost of construction₹ 303.65 Cr
Infrastructure and other structures₹ 51.02 Cr
EDC, taxes, levies and other costs₹ 102.96 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments7,100.55836.2%
Construction Of Roads7,930.429640.4%
Parks And Playgrounds2,947.729915%
Vehicle Parkings2761.4%
Club House1,292.5056.6%
Any Other800.4%

Apartments 306 units · 2 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings111.001,19598
Apartment/Shops/Other Buildings115.001,2386
Apartment/Shops/Other Buildings134.001,44246
Apartment/Shops/Other Buildings143.001,5392
Apartment/Shops/Other Buildings185.001,991104
Apartment/Shops/Other Buildings232.002,4974
Apartment/Shops/Other Buildings18.0019446

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsN/ANo
Water SupplyEE HSVP, DIV III, GURUGRAMYes
ElectricityEE, DHBVN, GURUGRAMNo
Sewage DisposalCOMMISSIONER, MCGYes
Storm Water DrainageCOMMISSIONER, MCG (APPLIED)No
Electrical Load AvailabilityDHBVN, GURUGRAMYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 57.9 lakhSubmitted To Town & Country Planning
Water Supply System₹ 3.52 CrSubmitted To Town & Country Planning
Storm Water Drainage₹ 39.31 lakhSubmitted To Town & Country Planning
Electricity Supply System₹ 9.11 CrSubmitted To Town & Country Planning
Sewage Treatment & Garbage Disposal₹ 2.37 CrSubmitted To Town & Country Planning
Street Lighting₹ 7.45 lakhSubmitted To Town & Country Planning
Security And Fire Fighting₹ 60 lakhSubmitted To Town & Country Planning
Playgrounds And Parks₹ 1.5 CrSubmitted To Town & Country Planning
Club House/Community Centre₹ 15.44 CrSubmitted To Town & Country Planning
Renewable Energy System₹ 80 lakhSubmitted To Town & Country Planning
Parking₹ 5.7 CrSubmitted To Town & Country Planning
Underground Water Tank₹ 2.5 CrSubmitted To Town & Country Planning
Electrical Sub Station₹ 5 CrSubmitted To Town & Country Planning
Stp₹ 2 CrSubmitted To Town & Country Planning
Rain Water Harvesting₹ 62 lakhSubmitted To Town & Country Planning
Plantation Of Road Side Tress₹ 2.65 lakhSubmitted To Town & Country Planning
Services And Resurfacing Of Roads₹ 78.58 lakhSubmitted To Town & Country Planning

Statutory approvals

ApprovalStatusDate
Tod ApprovalAlready Been Obtained19 Aug 2019
Airport Height ClearanceAlready Been Obtained14 Sep 2020
Forest NocAlready Been Obtained11 Aug 2015
Water SupplyAlready Been Obtained7 Mar 2018
Electrical Load AvailabilityAlready Been Obtained17 Jan 2020
License ApprovalAlready Been Obtained27 Dec 2013
Zoning PlanAlready Been Obtained19 Aug 2019
Building Plan/ Site Plan ApprovalAlready Been Obtained12 Oct 2020
Environment ClearanceAlready Been Obtained1 Feb 2021
Sewage DisposalApplied For But Yet To Receive19 Jan 2021
Fire Scheme ApprovalApplied For But Yet To Receive
Service Plan Estimates ApprovalApplied For But Yet To Receive

Specifications (as filed)

Flooring Details Of Various Parts Of HouseCombination Of Laminated Wooden Flooring , Natural Stone & Tiles
Wall Finishing DetailsCombination Of Acrylic Emulsion Paint , Pop Punning
Kitchen DetailsAntislip Vitrified Tiles;Acrylic Emulsion Paint, Granite Stone Counter, Single Lever Cp Fittings &Double; Bowl SS Sink With Drain Board,Hob And Chimney, Modular Kitchen Cabinetry
Bathroom FittingsVanities With Mirror, Single Lever Cp Fittings With Wash Basin & European Wc
Wood Work EtcModular Kitchen Cabinetry
Doors And Windos FramesHardwood Door Frame For Internal Doors
Glass WorkN/A
Electric FittingsModular Switches
Conducting And Wiring DetailsUpvc Conduiting With Wiring
Cupboard DetailsModular Kitchen
Water StorageOht At Project Level
Lift Details12-18 Persons Approx. Each Lift Capacity
External GlazingsUpvc Frame / Aluminium Frame With Glass
Windows/GlazingsUpvc Frame / Aluminium Frame With Glass
DoorsInternal Polished Veneer/ Panelled/ Flush Shutter
Main DoorsWooden Panelled Door/Polished Veneer
Internal DoorsInternal Polished Veneer/ Panelled/ Flush Shutter
Air ConditioningVrv / Split Ac System
Electrical FittingsModular Switches
Cng Pipe LineProvision Only
Provision Of Wifi And Broadband FacilityProvision Only
External Finishing/Colour SchemeHigh Grade External Paint And Stone
Internal FinishingCombination Of Acrylic Emulsion Paint , Pop Punning

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Hightown?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.