Hightown
by Silverglades Infrastructure Private Limited · Revenue Estate Of Village Sukhrali, Sector 28
- RERA registration
- GGM/406/138/2020/22
- Registered on
- 1 Sep 2020
- Valid till
- 10 Oct 2026
- Project ID
- RERA-GRG-337-2019
- Apartments
- 306 in 2 towers
- Completion (as filed)
- 11 Oct 2025
- Estimated cost
- ₹ 523.61 Cr
RERA registration
| Registration certificate | GGM/406/138/2020/22, dated 1 Sep 2020 |
|---|---|
| Registration valid till | 10 Oct 2026 |
| Project ID | RERA-GRG-337-2019 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Hightown |
| Promoter | Silverglades Infrastructure Private Limited |
| Promoter’s registered office | 404, Nirmal Tower, 26, Barakhamba Road, New Delhi-110001 |
| CIN | U45201DL2005PTC138897 |
| Site address | Revenue Estate Of Village Sukhrali, Sector 28 |
| Sector | Sector 28 |
| Tehsil / District | Gurgaon / Gurugram |
| Layout plan approved | 12 Oct 2020 |
| Building plans approved | 12 Oct 2020 |
| Construction start (as filed) | 15 Oct 2020 |
| Completion (as filed) | 11 Oct 2025 |
| Application submitted | 16 Jan 2020 |
Authority, hearings & orders
- Application submitted online
- Notice sent to the promoter By hand
-
Hearing
Examination By Authority
Proceedings
Deficiencies were pointed out vide notice no. HARERA/GGM/RPIN/2311 dated 28.01.2020. Accordingly, reply was submitted by the promoter on 06.02.2020 which was scrutinized and found that still there are major deficiencies which needs to be rectified by the promoter which are as follows: 1. Copy of approved service estimates and plans not submitted. 2. Copy of fire-fighting scheme approval not submitted 3. Copy of approved building plan not submitted. 4. Non encumbrance certificate not submitted 5. Renewal of license no. 110 of 2013 not submitted. 6. Online corrections not done by the promoter. 7. Copy of mutation, jamabandi and aks-shijra certified on the recent date needs to be provided. 8. Mining permission needs to be submitted. 9. approvals of storm water drainage and sewerage applied but not submitted 10. Deficit fee cannot be calculated as approve building plan not submitted till date. Fees will be calculated after submission of approved building plan. 11. Information to revenue department about the fact that project land licensed and bonded for setting up of a colony not informed to the revenue department for entry in the record of ownership. 12. Copy of super imposed demarcation plan on the approved layout plan showing khasra numbers not submitted. 13. Allotment letter, application form, conveyance deed and payment receipt in the prescribed format needs to be submitted. 14. Revised builder buyer agreement as per prescribed format not submitted 15. Brochure of HIGHTOWN needs to be submitted. Hence, the promoter is given 15 days’ time the submit the deficit documents. Accordingly, the matter is fixed for hearing on 16.03.2020
- Hearing Objection
-
Hearing
Objection View order
Proceedings
Intimation about the online hearing was conveyed to the promoter vide email dated 05.06.2020. Since no one appeared on behalf of the promoter for the online hearing. 3 opportunities of hearing were given to the promoter, but he was not able to submit the mandatory documents as conveyed to him vide email dated 06.06.2020 and notice dated 28.01.2020, 29.02.2020. Hence, the authority has decided to issue show cause for the rejection of real estate project namely Hightown being developed by Silverglades Infrastructure Pvt Ltd following the due procedure as provided under section-5 of the Real Estate (Regulation and Development) Act 2016 and Rule-5 of the Haryana Real Estate (Regulation and Development) Rules, 2017.
-
Hearing
Objection
Proceedings
Intimation about the online hearing was conveyed to the promoter vide email dated 05.06.2020. Since no one appeared on behalf of the promoter for the online hearing. 3 opportunities of hearing were given to the promoter, but he was not able to submit the mandatory documents as conveyed to him vide email dated 06.06.2020 and notice dated 28.01.2020, 29.02.2020. Hence, the authority has decided to issue show cause for the rejection of real estate project namely Hightown being developed by Silverglades Infrastructure Pvt Ltd following the due procedure as provided under section-5 of the Real Estate (Regulation and Development) Act 2016 and Rule-5 of the Haryana Real Estate (Regulation and Development) Rules, 2017.
-
Hearing
Adjournment
Proceedings
Adjourned due to Video Conference technical issue, for dated 28.07.2020
-
Hearing
Adjournment
Proceedings
Adjourned for 13.08.2020.
-
Hearing
Adjournment
Proceedings
On the request of the promoter the matter was adjourned to next date of hearing on 1st September 2020 on account of the fact that their approval of TOD policy from the Department of Town & Country Planning are at advance stage.
-
Hearing
Approved And Ready For Certificate Issuing Process
Proceedings
During personal hearing, Sh. Vishnu Shokeen is present on behalf of the promoter. The promoter has submitted the affidavit declaring that he will submit the approved service estimates and plan, fire scheme approval, mining permission within 3 months. The promoter has obtained the in principal approval of building plan from DTCP, Haryana vide memo no. ZP-1085-JE(SK)-2019/7057 dated 08.03.2019. Therefore, the authority has decided to grant registration certificate on the basis of provisional building plan and direct the promoter to submit the final approval of building plan within 3 months along with other pending approvals from the date of grant of registration certificate. No sale shall be effected without approval of final building plan as per condition 4(F) imposed by the DTCP, Haryana in the in principal approved building plan.
- Hearing Objection
- Registration granted GGM/406/138/2020/22
- Registration valid till
Land, licence & cost
| Licence | 110 of 2013 |
|---|---|
| FAR permissible / proposed | 362 / 362 |
| Estimated project cost | ₹ 523.61 Cr |
| Cost of land | ₹ 65.98 Cr |
| Cost of construction | ₹ 303.65 Cr |
| Infrastructure and other structures | ₹ 51.02 Cr |
| EDC, taxes, levies and other costs | ₹ 102.96 Cr |
How the land will be used
| Use | Area (as filed) | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 7,100.558 | 36.2% |
| Construction Of Roads | 7,930.4296 | 40.4% |
| Parks And Playgrounds | 2,947.7299 | 15% |
| Vehicle Parkings | 276 | 1.4% |
| Club House | 1,292.505 | 6.6% |
| Any Other | 80 | 0.4% |
Apartments 306 units · 2 towers
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 111.00 | 1,195 | 98 |
| Apartment/Shops/Other Buildings | 115.00 | 1,238 | 6 |
| Apartment/Shops/Other Buildings | 134.00 | 1,442 | 46 |
| Apartment/Shops/Other Buildings | 143.00 | 1,539 | 2 |
| Apartment/Shops/Other Buildings | 185.00 | 1,991 | 104 |
| Apartment/Shops/Other Buildings | 232.00 | 2,497 | 4 |
| Apartment/Shops/Other Buildings | 18.00 | 194 | 46 |
Areas are as filed with HRERA.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | N/A | No |
| Water Supply | EE HSVP, DIV III, GURUGRAM | Yes |
| Electricity | EE, DHBVN, GURUGRAM | No |
| Sewage Disposal | COMMISSIONER, MCG | Yes |
| Storm Water Drainage | COMMISSIONER, MCG (APPLIED) | No |
| Electrical Load Availability | DHBVN, GURUGRAM | Yes |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 57.9 lakh | Submitted To Town & Country Planning |
| Water Supply System | ₹ 3.52 Cr | Submitted To Town & Country Planning |
| Storm Water Drainage | ₹ 39.31 lakh | Submitted To Town & Country Planning |
| Electricity Supply System | ₹ 9.11 Cr | Submitted To Town & Country Planning |
| Sewage Treatment & Garbage Disposal | ₹ 2.37 Cr | Submitted To Town & Country Planning |
| Street Lighting | ₹ 7.45 lakh | Submitted To Town & Country Planning |
| Security And Fire Fighting | ₹ 60 lakh | Submitted To Town & Country Planning |
| Playgrounds And Parks | ₹ 1.5 Cr | Submitted To Town & Country Planning |
| Club House/Community Centre | ₹ 15.44 Cr | Submitted To Town & Country Planning |
| Renewable Energy System | ₹ 80 lakh | Submitted To Town & Country Planning |
| Parking | ₹ 5.7 Cr | Submitted To Town & Country Planning |
| Underground Water Tank | ₹ 2.5 Cr | Submitted To Town & Country Planning |
| Electrical Sub Station | ₹ 5 Cr | Submitted To Town & Country Planning |
| Stp | ₹ 2 Cr | Submitted To Town & Country Planning |
| Rain Water Harvesting | ₹ 62 lakh | Submitted To Town & Country Planning |
| Plantation Of Road Side Tress | ₹ 2.65 lakh | Submitted To Town & Country Planning |
| Services And Resurfacing Of Roads | ₹ 78.58 lakh | Submitted To Town & Country Planning |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Tod Approval | Already Been Obtained | 19 Aug 2019 |
| Airport Height Clearance | Already Been Obtained | 14 Sep 2020 |
| Forest Noc | Already Been Obtained | 11 Aug 2015 |
| Water Supply | Already Been Obtained | 7 Mar 2018 |
| Electrical Load Availability | Already Been Obtained | 17 Jan 2020 |
| License Approval | Already Been Obtained | 27 Dec 2013 |
| Zoning Plan | Already Been Obtained | 19 Aug 2019 |
| Building Plan/ Site Plan Approval | Already Been Obtained | 12 Oct 2020 |
| Environment Clearance | Already Been Obtained | 1 Feb 2021 |
| Sewage Disposal | Applied For But Yet To Receive | 19 Jan 2021 |
| Fire Scheme Approval | Applied For But Yet To Receive | |
| Service Plan Estimates Approval | Applied For But Yet To Receive |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Combination Of Laminated Wooden Flooring , Natural Stone & Tiles |
|---|---|
| Wall Finishing Details | Combination Of Acrylic Emulsion Paint , Pop Punning |
| Kitchen Details | Antislip Vitrified Tiles;Acrylic Emulsion Paint, Granite Stone Counter, Single Lever Cp Fittings &Double; Bowl SS Sink With Drain Board,Hob And Chimney, Modular Kitchen Cabinetry |
| Bathroom Fittings | Vanities With Mirror, Single Lever Cp Fittings With Wash Basin & European Wc |
| Wood Work Etc | Modular Kitchen Cabinetry |
| Doors And Windos Frames | Hardwood Door Frame For Internal Doors |
| Glass Work | N/A |
| Electric Fittings | Modular Switches |
| Conducting And Wiring Details | Upvc Conduiting With Wiring |
| Cupboard Details | Modular Kitchen |
| Water Storage | Oht At Project Level |
| Lift Details | 12-18 Persons Approx. Each Lift Capacity |
| External Glazings | Upvc Frame / Aluminium Frame With Glass |
| Windows/Glazings | Upvc Frame / Aluminium Frame With Glass |
| Doors | Internal Polished Veneer/ Panelled/ Flush Shutter |
| Main Doors | Wooden Panelled Door/Polished Veneer |
| Internal Doors | Internal Polished Veneer/ Panelled/ Flush Shutter |
| Air Conditioning | Vrv / Split Ac System |
| Electrical Fittings | Modular Switches |
| Cng Pipe Line | Provision Only |
| Provision Of Wifi And Broadband Facility | Provision Only |
| External Finishing/Colour Scheme | High Grade External Paint And Stone |
| Internal Finishing | Combination Of Acrylic Emulsion Paint , Pop Punning |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.