318-319, Third Floor, DLF Star Tower, Sector - 30, Gurugram, Hr - 122001
CIN
U70102HR2009PTC039647
Site address
Sector 25-26, Garhi Bolni Road, Rewari, Haryana
Sector
Sector 25
Tehsil / District
Rewari / Rewari
Layout plan approved
5 Apr 2022
Building plans approved
5 Apr 2022
Construction start (as filed)
1 Apr 2024
Completion (as filed)
31 Dec 2030
Application submitted
1 Nov 2025
Authority, hearings & orders
Current statusApproved And Certificate Uploaded
Initial scrutinyListed for hearing on 26-11-2025
Next hearingNot Required
Application submitted online
Application received by HRERA Panchkula
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
APPROVED AND READY FOR CERTIFICATE ISSUING PROCESS
Registration valid till
Land, licence & cost
Land area of the project
2 acres
Total licensed area
50.731 acres
Licence
License No 90 of 2009
FAR permissible / proposed
1.5 / 1.46
Estimated project cost
₹ 47.6 Cr
Cost of land
₹ 0.63 Cr
Cost of construction
₹ 41.94 Cr
Infrastructure and other structures
₹ 1.1 Cr
EDC, taxes, levies and other costs
₹ 3.93 Cr
How the land will be used
Use
Sq m
Share
Land Area To Be Used For Construction Of Apartments
2,830.6
35%
Construction Of Roads
2,050
25.3%
Pavements
474
5.9%
Vehicle Parkings
2,100
25.9%
Sewage And Solid Waste Treatment Facility
160
2%
Any Other
479.4
5.9%
Apartments 147 units · 4 towers
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
97.35
1,048
27
Apartment/Shops/Other Buildings
56.47
608
108
Apartment/Shops/Other Buildings
64.76
697
2
Apartment/Shops/Other Buildings
38.21
411
8
Apartment/Shops/Other Buildings
12.00
129
1
Apartment/Shops/Other Buildings
27.50
296
1
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
HSVP
Yes
Water Supply
HSVP
Yes
Electricity
DHBVNL
Yes
Sewage Disposal
HSVP
Yes
Storm Water Drainage
HSVP
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 23.22 lakh
Submitted To Town & Country Planning
Water Supply System
₹ 9.83 lakh
Submitted To Town & Country Planning
Storm Water Drainage
₹ 6.18 lakh
Submitted To Town & Country Planning
Electricity Supply System
₹ 3.07 lakh
Submitted To Town & Country Planning
Sewage Treatment & Garbage Disposal
₹ 7.77 lakh
Submitted To Town & Country Planning
Playgrounds And Parks
₹ 3.48 lakh
Submitted To Town & Country Planning
Any Other
₹ 2.64 lakh
Submitted To Town & Country Planning
Other Facilities As Per Project Report
₹ 31.46 lakh
Submitted To Town & Country Planning
Statutory approvals
Approval
Status
Date
License No. 90 Of 2009
Already Been Obtained
Revised Layout Plan
Already Been Obtained
21 Jan 2021
Completion Certificate Of License No 90 Of 2009
Already Been Obtained
30 Jun 2023
Approval Of Standard Design Cum SCO
Already Been Obtained
5 Apr 2022
Part Completion Of 50.73125 Acres
Already Been Obtained
11 Jun 2015
Specifications (as filed)
Flooring Details Of Various Parts Of House
For SCO Building: 1. Common Area And Staircase - Granite - Color Mix - Locally Available 2. Toilet - Vetrified Tiles - Orient Or Equivalent 3. Shop Area - Pcc + Cement Sand Smooth Finish 4. Balcony - Non Slip Tiles - Orient Or Equivalent
Wall Finishing Details
For SCO Building: 1. Common Area And Staircase - Granite (Mix Color - Locally Available) + Cement Sand Plaster Wall - Jk Cement Or Equivalent 2. Toilet - Vetrified Tiles - Orient Or Equivalent 3. Shop Area - Cement Sand Smooth Plaster - Jk Cement Or Equivalent 4. Balcony - Texture Paint - Asian Paints Or Equivalent
Kitchen Details
Bareshell With Wet Points
Bathroom Fittings
For SCO Building Toilet: 1. Chinaware (Wc + Washbasin) - Hindware Or Equivalent 2. C.p. Fittings (Tap, Health Faucet, Towel Rail) - Hindware Or Equivalent 3. Exhaust Fan - Havells Or Equivalent 4. Led Lights - Surya Or Equivalent
Doors And Windos Frames
For SCO Building: 1. Window Frames: Upvc (Black) - Matrix Windows Or Equivalent 2. Main Door: Wooden - Local Available
Glass Work
For SCO Buildings: All Glass Windows Will Be Tinted Toughened Glass 1. Glass Make: Saint Gobain Provided Through Matrix Windows Or Equivalent
Electric Fittings
For SCO Buildings: 1. Toilet: Switches + Socket (Legrand Or Equivalent) + Led Light (Surya Or Equivalent) 2. Common Area: Light Fittings (Surya Or Equivalent), Fire Pump Set - L&t Or Equivalent, Fire Alarm And Fire Detection System - Agni Or Equivalent 3. Staircase: Light Fittings - Surya Or Equivalent
Conducting And Wiring Details
1. Pvc Conduits - Akg Or Equivalent 2. Isi Standard Make Wires - Polycab Or Equivalent
Water Storage
Terrace Level Pvc Water Storage Tanks - Vectus Or Equivalent
Lift Details
Mrl Lift - Kone Or Equivalent
External Glazings
Covered In Point 13.1
Windows/Glazings
Windows On Front And Back Side Of The Building On Each Floor With Toughened Glass Same As Point 06 And 07
Main Doors
Shutters Installed & Painted Grey
Internal Doors
1. Shop Door: Double Leaf Wooden Door - Locally Available 2. Bathroom Door: Upvc Door - Matrix With Frosted Glass Or Equivalent 3. Balcony Door: Upvc Door - Matrix With Glass Or Equivalent 4. Common Area Staircase Door: Fire Rated Doors In The Common Area Staircase -
Electrical Fittings
Already Covered In Point 08
Provision Of Wifi And Broadband Facility
Lv Shaft Provided
External Finishing/Colour Scheme
1. Texture Paint - Asian Paint Or Equivalent - Off White Or Equivalent
Internal Finishing
Already Covered From Point 01 To 05
Source: HRERA Panchkula, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Gurutek Galleria Commercial Floors?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.