License No. 118 of 2007 dated 14.02007 which is valid upto 13.02.2019.
FAR permissible / proposed
1.75 / 1.75
Estimated project cost
₹ 30.31 Cr
Cost of land
₹ 5.41 Cr
Cost of construction
₹ 14.5 Cr
Infrastructure and other structures
₹ 4.95 Cr
EDC, taxes, levies and other costs
₹ 5.45 Cr
How the land will be used
Use
Area (as filed)
Share
Land Area To Be Used For Construction Of Apartments
2,809.69
23.3%
Construction Of Roads
6,507
54%
Parks And Playgrounds
723
6%
Area To Be Left For Transferring To The Government For Community Services
1,853.476
15.4%
Commercial
156.834
1.3%
External services
Service
Provided by
Approval taken
Roads
HSVP
Yes
Water Supply
HSVP
Yes
Electricity
DHBVNL
Yes
Sewage Disposal
HSVP
Yes
Storm Water Drainage
HSVP
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 1.44 Cr
As Per Project Report
Water Supply System
₹ 1.63 Cr
As Per Project Report
Storm Water Drainage
₹ 59.4 lakh
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 1.04 Cr
As Per Project Report
Street Lighting
₹ 14.85 lakh
As Per Project Report
Playgrounds And Parks
₹ 9.9 lakh
Yet To Be Prepared
Statutory approvals
Approval
Status
Date
License No. 118 Of 2007
Already Been Obtained
14 Feb 2007
Noc For Height Clearance From The Airport Authority Of India
Applied For But Yet To Receive
Specifications (as filed)
Flooring Details Of Various Parts Of House
Vitrified Tiles Of Approved Design Intent,
Wall Finishing Details
As Per Standard Design.
Kitchen Details
Tiles Above 2FT Of The Counter, Rest As Per Design.
Bathroom Fittings
Urinal, Washbasin, W.c., Taps, Ablution Taps And All Fixtures Of Medium Range To Be Fixed And Provided By The Contractor. Granite Partition In Urinal, Wash Basin Counter Of Granite
Wood Work Etc
As Per Standard Design.
Doors And Windos Frames
Main Door Will Be Of M.s. Section (F4, F7) Including All Fitting And Fixture. Ventilators Shall Be Of M.s. Section (F4, F7). All W.c. Doors Will Be Of Wpc(Alstone )Or Equivalent Pvc Make. Raw Section Of Doors And Windows Will Be Of Jindal/Hindalco
Glass Work
As Per Standard Design.
Electric Fittings
As Per Standard Design.
Conducting And Wiring Details
Pvc Conduits And Other Fitting Like Fan Boxes, Junction Boxes, M.s. Boxes Shall Be Provided As Per Drawings. Pvc Conduits Shall Be Of Poly Pack Or Setia Or Equivalent Make.
Cupboard Details
As Per Standard Design.
Water Storage
As Per Standard Design.
Lift Details
As Per Standard Design.
External Glazings
As Per Standard Design.
Windows/Glazings
As Per Standard Design.
Doors
As Per Standard Design.
Main Doors
As Per Standard Design.
Internal Doors
As Per Standard Design.
Air Conditioning
As Per Standard Design.
Electrical Fittings
As Per Standard Design.
Cng Pipe Line
As Per Standard Design.
Provision Of Wifi And Broadband Facility
As Per Standard Design.
External Finishing/Colour Scheme
As Per Standard Design.
Internal Finishing
As Per Standard Design.
Source: HRERA Panchkula, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Group Housing Colony (Phase-II), 12050 Sq.metrs.?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.