Registration period overHRERA GurugramInterim ReraOC / CC on record

Group Housing Colony

by Gatevida Developers Private Limited · Sector 112/113, Village Bajghera, Gurugram

RERA registration
186 OF 2017
Registered on
14 Sep 2017
Valid till
30 Jun 2020
Project ID
RERA-GRG-730-2020
Land area
4.038 acres
Estimated cost
₹ 143.4 Cr

RERA registration

Registration certificate186 OF 2017, dated 14 Sep 2017
Registration valid till30 Jun 2020
Project IDRERA-GRG-730-2020
AuthorityHRERA Gurugram (Interim Rera)
Project type (as filed)Ongoing
Project nameGroup Housing Colony
PromoterSector 113 Gatevida Developers Private Limited
Promoter’s registered officeFlat No. Gf-3, Naurang House, Plot NO.5, Block-134 21, Kasturba Gandhi Marg, New Delhi Central Delhi 110001
CINU45202DL2011PTC277182
Site addressSector 113 Gatevida Developers Private Limited
SectorSector 112
Tehsil / DistrictGurgaon / Gurugram
Layout plan approved2 Apr 2013
Building plans approved6 Mar 2016
Application submitted11 Dec 2020

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Next hearingNot Required
  1. Registration granted 186 OF 2017
  2. Registration valid till
  3. Application submitted online

Land, licence & cost

Land area of the project4.038 acres
Total licensed area8.875 acres
Licence85 OF 2012 UPTO 28th Aug, 2020
FAR permissible / proposed1.75 / 1.75
Estimated project cost₹ 143.4 Cr
Cost of land₹ 33.85 Cr
Cost of construction₹ 96.8 Cr
Infrastructure and other structures₹ 5.84 Cr
EDC, taxes, levies and other costs₹ 6.91 Cr

How the land will be used

UseSq mShare
Land Area To Be Used For Construction Of Apartments1,109.0866.8%
Construction Of Roads4,196.425.7%
Pavements865.85.3%
Parks And Playgrounds7,210.544.1%
Green Belts4812.9%
Vehicle Parkings62.50.4%
Electricity Sub-Station680.4%
Area To Be Left For Transferring To The Government For Community Services1,710.810.5%
Any Other637.5383.9%

External services

ServiceProvided byApproval taken
RoadsNANo
Water SupplyHUDAYes
ElectricityDHBVNYes
Sewage DisposalHUDAYes
Storm Water DrainageHUDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 1.25 CrSubmitted To HUDA
Water Supply System₹ 1.17 CrSubmitted To HUDA
Storm Water Drainage₹ 43.84 lakhSubmitted To HUDA
Electricity Supply System₹ 71.63 lakhSubmitted To HUDA
Sewage Treatment & Garbage Disposal₹ 80.24 lakhSubmitted To HUDA
Street Lighting₹ 12.35 lakhAs Per Project Report
Playgrounds And Parks₹ 4.52 lakhSubmitted To HUDA
Club House/Community Centre₹ 44.7 lakhSubmitted To HUDA
Any Other₹ 1.3 CrSubmitted To HUDA

Statutory approvals

ApprovalStatusDate
Height Approval From AaiAlready Been Obtained13 Dec 2011
Height Approval From AaiAlready Been Obtained27 Jun 2019
Building Plan Approval From Dt & Cp HaryanaAlready Been Obtained3 Jun 2016
Fire Noc From Haryana Fire ServiceAlready Been Obtained12 Apr 2017
Forest Department ClearanceAlready Been Obtained8 May 2013
Load Sanction ApprovalAlready Been Obtained28 Jun 2017
Occupancy CertificateAlready Been Obtained15 Feb 2019
Noc For Use Of Water For Construction From HUDAAlready Been Obtained21 Mar 2013

Specifications (as filed)

Flooring Details Of Various Parts Of HouseMarble, Laminated Wood, Engineered Wood, Tiles
Wall Finishing DetailsPlasticemulsionpaint, Ceramic Tile Dado In Toilet
Kitchen DetailsVitrified Tile Flooring, 600MM High Tile Dado On Walls, Stainless Steel Sink, Exhaust Fan
Bathroom FittingsVitrified Tile Flooring, Ceramic Tile Dado, Cp Fittings And Chinaware
Doors And Windos FramesExternal Windows/Doors –Aluminium , Internal Doors Wooden Painted/Polished Door Frames
Glass WorkSS Railing With Glass
Electric FittingsModular Switches
Conducting And Wiring DetailsConcealed Conduiting And Wiring
Water StorageUnder Ground And Over Head Water Tanks
Lift DetailsBranded Lifts
External GlazingsAluminium With Glass
Windows/GlazingsAluminium With Glass
DoorsInternal Doors Flush Doors With Veneer/Laminate
Main DoorsFlush Door With Veneer Polished
Internal DoorsFlushdoor With Laminate
Air ConditioningTower F-Air-Conditionerfittedinall Rooms,

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Group Housing Colony?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.