HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Ms. Deepika, Planning Executive and Ms. Asha, Chartered Accountant briefed about the facts of the project. Sh. Karan Trehan (AR) and Sh. Vikash Singh (AR) are present on behalf of the promoter. Approved as proposed subject to corrections mentioned in the above office note and submission of above clearances within three months, RC will be issued after rectification of deficiencies.
Registration grantedGGM/870/602/2024/97
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
5.158 acres
Total licensed area
5.158 acres
Licence
HSVP land - e-auction, GH25 at Sector 43, Urban Estate Gurugram II on free hold basis
FAR permissible / proposed
3.198 / 3.197
Estimated project cost
₹ 1,403.16 Cr
Cost of land
₹ 664.19 Cr
Cost of construction
₹ 506.01 Cr
Infrastructure and other structures
₹ 82.7 Cr
EDC, taxes, levies and other costs
₹ 150.27 Cr
How the land will be used
Use
Sq m
Share
Land Area To Be Used For Construction Of Apartments
3,522.236
16.9%
Construction Of Roads
5,811.014
27.8%
Pavements
3,368.385
16.1%
Parks And Playgrounds
451.6
2.2%
Green Belts
4,174.2
20%
Vehicle Parkings
327.1
1.6%
Electricity Sub-Station
130.478
0.6%
Club House
1,265.77
6.1%
Sewage And Solid Waste Treatment Facility
547.64
2.6%
Waterbody
1,273
6.1%
Apartments 251 units · 2 towers
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
126.12
1,358
2
Apartment/Shops/Other Buildings
201.23
2,166
2
Apartment/Shops/Other Buildings
207.97
2,239
60
Apartment/Shops/Other Buildings
212.60
2,288
60
Apartment/Shops/Other Buildings
141.13
1,519
2
Apartment/Shops/Other Buildings
146.47
1,577
58
Apartment/Shops/Other Buildings
242.54
2,611
2
Apartment/Shops/Other Buildings
242.54
2,611
2
Apartment/Shops/Other Buildings
242.54
2,611
60
Apartment/Shops/Other Buildings
16.93
182
2
Apartment/Shops/Other Buildings
16.97
183
1
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
HSVP
No
Water Supply
HSVP
Yes
Electricity
DHBVN
Yes
Sewage Disposal
HSVP
Yes
Storm Water Drainage
HSVP
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 3.46 Cr
Yet To Be Prepared
Water Supply System
₹ 4.64 Cr
Yet To Be Prepared
Storm Water Drainage
₹ 1.07 Cr
Yet To Be Prepared
Electricity Supply System
₹ 21.74 Cr
Yet To Be Prepared
Sewage Treatment & Garbage Disposal
₹ 33 lakh
Yet To Be Prepared
Street Lighting
₹ 1.23 Cr
Yet To Be Prepared
Security And Fire Fighting
₹ 12.41 Cr
Yet To Be Prepared
Club House/Community Centre
₹ 29.15 Cr
Yet To Be Prepared
Softscape
₹ 3.21 Cr
Yet To Be Prepared
Hardscape
₹ 3.58 Cr
Yet To Be Prepared
Electrical Sub Station
₹ 1.55 Cr
Yet To Be Prepared
Signages
₹ 32 lakh
Yet To Be Prepared
Statutory approvals
Approval
Status
Date
Zoning Plan
Already Been Obtained
1 Aug 2024
Noc For Height Clearance
Already Been Obtained
9 Apr 2024
Sanction Of Ultimate Load Assurance
Already Been Obtained
29 Mar 2024
Building Plan Approval
Already Been Obtained
30 Aug 2024
Assurance Of Stp Treated Water Connection For Construction Purpose
Already Been Obtained
20 Mar 2024
Assurance Of Water Supply
Already Been Obtained
29 Mar 2024
Tree Cutting Approval
Already Been Obtained
19 Jul 2024
Assurance Of Sewerage Connection
Already Been Obtained
20 Mar 2024
Assurance Of Storm Water Connection
Already Been Obtained
20 Mar 2024
Ec
Applied For But Yet To Receive
20 Mar 2024
Fire Scheme Approval
Yet To File For Approval
Service Plan Estimate
Yet To File For Approval
Specifications (as filed)
Flooring Details Of Various Parts Of House
Vitrified Tiles/Ceramic Tiles
Wall Finishing Details
Acrylic Emulsion Paint/ Oil Bound Distemper
Kitchen Details
Floor: Vitrified Tiles, Wall: Ceramic Tiles 2FT Above Counter And Obd Paint On Remaining Area, Ceiling: Obd Paint
Bathroom Fittings
All Provided With Standard Company Make
Wood Work Etc
Laminated/Painted Flush Doors/Moulded Shutter With Wooden Frame (Pre-Hung Level With Laminate)
Doors And Windos Frames
Laminated/Painted/Power Coated Frames Of Wooden/Aluminium/Upvc Material
Glass Work
4MM And Above As Per Specifications
Electric Fittings
As Per Building Norms
Conducting And Wiring Details
As Per Building Norms
Water Storage
Under Ground Water Tank & Overhead Water Tank
Lift Details
Tower A & B: 3 Passenger Lift & 1 Service Lift
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Godrej Miraya?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.