RERA registration
Registration certificate61 OF 2017, dated 17 Aug 2017
Registration valid till28 Feb 2021
Project IDRERA-GRG-403-2019
AuthorityHRERA Gurugram (Interim Rera)
Project type (as filed)Ongoing
Project nameGodrej Aria @ 101 ( Vol. I)
PromoterWonder City Buildcon Private Limited
Promoter’s registered officeGodrej One, 5TH Floor, Pirojshanagar, Eastern Express Highway, Vikhroli (East) Mumbai Mumbai City Mh 400079
CINU70100MH2013PTC247696
Site addressSector 79
SectorSector 79
Tehsil / DistrictGurgaon / Gurugram
Layout plan approved7 Aug 2015
Building plans approved7 Aug 2015
Application submitted30 Nov 2019
Authority, hearings & orders
Current status Approved And Certificate Uploaded
Next hearing Not Required
17 Aug 2017
Registration granted
61 OF 2017
30 Nov 2019
Application submitted online
9 Dec 2019
Application received by HRERA Gurugram
28 Feb 2021
Registration valid till
Land, licence & cost
Land area of the project13.606 acres
Total licensed area17.431 acres
Licence47 of 2013 and 109 of 2014
FAR permissible / proposed123447.894 / 175
Estimated project cost₹ 412.74 Cr
Cost of land₹ 40.23 Cr
Cost of construction₹ 263.26 Cr
Infrastructure and other structures₹ 62 Cr
EDC, taxes, levies and other costs₹ 87.44 Cr
How the land will be used
Use Sq m Share
Land Area To Be Used For Construction Of Apartments7,682.77 14.7% Construction Of Roads9,562.48 18.3% Pavements2,288.64 4.4% Parks And Playgrounds13,084.76 25.1% Vehicle Parkings3,840.6 7.4% Electricity Sub-Station71.12 0.1% Club House1,014.814 1.9% Any Other14,600.24 28%
External services
Service Provided by Approval taken
RoadsHUDA /GMDA No Water SupplyHUDA /GMDA No ElectricityDHBVN Yes Sewage DisposalHUDA /GMDA No Storm Water DrainageHUDA /GMDA No
Facilities in the service plan
Facility Estimated cost Status
Internal Roads And Pavements₹ 8.15 Cr Yet To Be Prepared Water Supply System₹ 2.41 Cr Yet To Be Prepared Storm Water Drainage₹ 3.5 Cr Yet To Be Prepared Electricity Supply System₹ 8.91 Cr Yet To Be Prepared Sewage Treatment & Garbage Disposal₹ 1.49 Cr Yet To Be Prepared Street Lighting₹ 1.54 Cr Yet To Be Prepared Security And Fire Fighting₹ 1.67 Cr Yet To Be Prepared Playgrounds And Parks₹ 2.63 Cr Yet To Be Prepared Club House/Community Centre₹ 13.49 Cr Yet To Be Prepared Shopping Area₹ 1.21 Cr Yet To Be Prepared Renewable Energy System₹ 21.75 lakh Yet To Be Prepared Any Other₹ 16.79 Cr Yet To Be Prepared
Statutory approvals
Approval Status Date
LicenceAlready Been Obtained 6 Jun 2013
Renewal Of LicenceAlready Been Obtained 12 Jun 2019
Additional LicenceAlready Been Obtained 14 Aug 2014
Renewal Of Additional LicenceAlready Been Obtained 30 Sep 2019
Building PlanAlready Been Obtained 20 Aug 2014
Additional/Revised Building PlanAlready Been Obtained 7 Aug 2015
Environment ClearanceAlready Been Obtained 1 May 2017
Fire Scheme ApprovalAlready Been Obtained 12 Dec 2017
Service Plan EstimateAlready Been Obtained 8 Mar 2018
Specifications (as filed)
Flooring Details Of Various Parts Of HouseLaminated Wooden Floor In Bedrooms/Anti Skid Ceramic Tiles In Toilets/Anti Skid Tiles In Kitchen And Balcony Wall Finishing DetailsAcrylic Emulsion/Ceramic Tile 2'-0" Above Counter For Walls/Tile /Stone Architrave With Arcylic Emulsion For Tower Lobbies Kitchen DetailsAnti Skid Tile Floor/Ceramic Tile 2'-0" Above Counter For Walls/Granite Top With Stainless Steel Sink With Drainboard Bathroom FittingsAll Provided Of Standard Company Make Doors And Windos FramesExternal- Anodized/Power Coated Aluminum/Upvc ,Internal- Hardwood Frame Glass WorkOn External Building FaçAde And Entrance Lobbies Electric FittingsModular Switches Conducting And Wiring DetailsHigh Quality Fire Resistant Low Smoke Copper Wiring Water StorageUnderground And Overhead Storage Tank Lift DetailsTile/Stone Architrave With Acrylic Emulsion External GlazingsAnnealed Glass Windows/GlazingsAnnealed Glass DoorsExternal -Anodized/Powder Coated Aluminum/Upvc ,Internal- Teak Finish Flush Doors/Moulded Shutter/Laminated Flush Doors Main DoorsTeak Finish Flush Doors/Moulded Shutter Internal DoorsLaminated Flush Doors/Moulded Shutter Air ConditioningFor Tower 9,10,11,12,13&14; -Split Ac's In All Bedrooms For 1,2,3,4,8&15;-Provision Of Split Ac's In All Rooms Electrical FittingsModular Switches Provision Of Wifi And Broadband FacilityYes External Finishing/Colour SchemeGood Quality External Grade Texture Paint Internal FinishingWalls-Acrylic Emulsion/Tile Cladding , Floor- Laminated Wooden Floor/Antiskid Ceramic Tiles
Source: HRERA Gurugram, Form REP-I , read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.