Registration validHRERA Gurugram

Devasya Bharat

by Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd) · Sector 88A, Gurugram

RERA registration
GGM/1017/749/2025/120
Registered on
5 Dec 2025
Valid till
30 Sep 2033
Project ID
RERA-GRG-2050-2025
Land area
2.977 acres
Apartments
339 in 2 towers
Completion (as filed)
31 Dec 2033
Estimated cost
₹ 1,226.73 Cr

RERA registration

Registration certificateGGM/1017/749/2025/120, dated 5 Dec 2025
Registration valid till30 Sep 2033
Project IDRERA-GRG-2050-2025
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameDevasya Bharat
PromoterDevasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd)
Promoter’s registered officeD-4, District Centre Saket, Commercial Complex, New Delhi-110 017
CINU45201DL2004PTC125229
Site addressSector 88A, Gurugram
SectorSector 88A
Tehsil / DistrictGurgaon / Gurugram
Building plans approved12 Sep 2025
Construction start (as filed)1 Dec 2025
Completion (as filed)31 Dec 2033
Application submitted9 Oct 2025

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Notice sent to the promoter Dispatched
  3. Hearing Examination By Authority View order
    Proceedings

    Ar. Neeraj Gautam, Associate Architectural Executive and Ms. Asha, Chartered Accountant briefed about the facts of the project. Sh. Rakesh Kaul (CEO & MD), Sh. Saurabh Kumar (AR) are present on behalf of the promoter. It is noted that the license no. 144 of 2022 from which 1.34375 acres has been migrated into the license no. 141 of 2024 is already registered with the Authority vide RC no. 106 of 2022 as “India Rashtra”. Keeping in view the above, a prominent public notice inviting objections, if any, from the public in general and from the allottees of the earlier registered project “India Rashtra” (under License No. 144 of 2022) in particular, shall be issued by the promoter. The notice shall be published within three (3) days of this order in three newspapers of wide circulation (two in English and one in Hindi) inviting objections within ten (10) days from the date of publication. The said notice shall clearly state that the present application for registration pertains to a project under License No. 141 of 2024, granted by the Directorate of Town and Country Planning (DTCP), Haryana, over an area measuring 4 acres, including a part area of 1.34375 acres migrated from License No. 144 of 2022. Further, the Authorized Representative (AR) of the promoter is directed to remove and rectify all remaining deficiencies as listed at Serial No. 21 of the deficiency sheet before the next date of hearing. The matter to come up on 17.11.2025.

  1. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Ar. Neeraj Gautam, Associate Architectural Executive and Ms. Asha, Chartered Accountant briefed about the facts of the project. Sh. Rakesh Kaur (Managing Director) and Sh. Saurabh Kumar (Sr. Manager) are present on behalf of the promoter. The AR of the promoter proposes to submit the DD/BG of Rs. 25 lakhs as security to submit the service plans & estimates approval within 3 months of grant the registration. It is also expressly undertaken that in the event of failure to obtain and submit the aforesaid approvals within the stipulated time frames, the said security amount(s) shall be liable to be forfeited by the Authority. The AR request to grant registration to the project subject to the submission of service plans & estimates approval within 3 months, road access permission within two months and mining permission before commencement of construction and above DD/BG along with remaining deficiencies before issuance of the certificate. The Authority has taken note of the submissions made by the Authorized Representative of the promoter regarding the non-availability of the aforesaid statutory approvals as on date. In view of the submission of proposal to submit the Demand Draft / Bank Guarantee, amounting to Rs. 25,00,000/- (Rupees Twenty-Five Lakhs only) in lieu of timely submission of approved service plans and estimates, in favour of the Authority, the promoter is directed to submit of following approvals: a.       Service Plans and Estimates: within 3 months from the date of grant of registration; and b.       Mining permission: before commencement of construction c.        Road access permission: within 2 months from the date of grant of registration. In the event of non-submission of approved service plans and estimates within the prescribed time frame, the corresponding security amount shall stand forfeited by the Authority, and the failure to submit any of the above approvals/ permissions within the prescribed timeframe may also attract additional regulatory action as permissible under the Act of 2016, Rules and Regulations made thereunder. The Authority further observes that the license no. 144 of 2022 from which 1.34375 acres has been migrated into the license no. 141 of 2024 is already registered with the Authority vide RC no. 106 of 2022 as “India Rashtra”. Approved as proposed subject to rectification of deficiencies mentioned above at S. No. 21. Also, since the license no. 144 of 2022 from which 1.34375 acres has been migrated into the license no. 141 of 2024 is already registered with the Authority vide RC no. 106 of 2022 as “India Rashtra”, accordingly, the promoter is directed to apply for the amendment of registration certificate no. 106 of 2022 within 3 weeks from the date of this order along with all revised and updated documents. The Registration Certificate shall be issued after deposition of above BG/DD and rectification of other deficiencies as listed above at S. No. 21.

  2. Registration granted GGM/1017/749/2025/120
  3. Certificate uploaded RC Uploaded
  1. Registration valid till

Land, licence & cost

Land area of the project2.977 acres
Total licensed area4 acres
Licence141 of 2024 DATED 11.11.2024
FAR permissible / proposed3.62 / 3.61
Estimated project cost₹ 1,226.73 Cr
Cost of land₹ 312.81 Cr
Cost of construction₹ 448.08 Cr
Infrastructure and other structures₹ 23.95 Cr
EDC, taxes, levies and other costs₹ 441.9 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments1.11637.5%
Construction Of Roads0.5819.5%
Pavements0.67722.7%
Parks And Playgrounds0.60220.2%
Security0.0030.1%

Apartments 339 units · 2 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings131.401,4144
Apartment/Shops/Other Buildings141.051,518158
Apartment/Shops/Other Buildings177.341,9091
Apartment/Shops/Other Buildings187.662,02014
Apartment/Shops/Other Buildings189.562,04013
Apartment/Shops/Other Buildings194.882,09854
Apartment/Shops/Other Buildings375.704,0447
Apartment/Shops/Other Buildings379.624,0867
Apartment/Shops/Other Buildings28.063023
Apartment/Shops/Other Buildings28.273043
Apartment/Shops/Other Buildings29.283153
Apartment/Shops/Other Buildings30.923331
Apartment/Shops/Other Buildings33.993661
Apartment/Shops/Other Buildings34.073672
Apartment/Shops/Other Buildings49.605341
Apartment/Shops/Other Buildings56.326061
Apartment/Shops/Other Buildings19.0320548
Apartment/Shops/Other Buildings19.032056
Apartment/Shops/Other Buildings19.072056
Apartment/Shops/Other Buildings19.392096

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsALREADY CONNECTEDYes
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 3.5 CrAs Per Project Report
Water Supply System₹ 2.05 CrAs Per Project Report
Storm Water Drainage₹ 50 lakhAs Per Project Report
Electricity Supply System₹ 3 CrAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 85 lakhAs Per Project Report
Street Lighting₹ 15 lakhAs Per Project Report
Security And Fire Fighting₹ 4 CrAs Per Project Report
Playgrounds And Parks₹ 2.5 CrAs Per Project Report
Renewable Energy System₹ 25 lakhAs Per Project Report
Rain Water Harvesting₹ 35 lakhAs Per Project Report
Underground Water Tank₹ 80 lakhAs Per Project Report
Construction Of Circulation Road₹ 1.5 CrAs Per Project Report
Electrical Sub Station₹ 2 CrAs Per Project Report
Stp₹ 2.5 CrAs Per Project Report

Statutory approvals

ApprovalStatusDate
HUDA Construction Water NocAlready Been Obtained30 Jun 2025
Water SupplyAlready Been Obtained28 Nov 2024
Sewage DisposalAlready Been Obtained26 Nov 2024
Storm Water DrainageAlready Been Obtained26 Nov 2024
Electrical LoadAlready Been Obtained28 Nov 2024
Environment ClearanceAlready Been Obtained20 Feb 2025
Airport Height ClearanceAlready Been Obtained21 Oct 2024
Forest NocAlready Been Obtained9 Oct 2024
LoiAlready Been Obtained5 Aug 2024
Br-IIIAlready Been Obtained12 Sep 2025
LicenseAlready Been Obtained11 Nov 2024
Fire Scheme ApprovalAlready Been Obtained16 Oct 2025
Letter Of Phasing PlanAlready Been Obtained13 Jan 2025
Service Plan And EstimatesApplied For But Yet To Receive19 Sep 2025

Specifications (as filed)

Flooring Details Of Various Parts Of HouseVitrified Tile, Laminate Wooden Flooring, Anti Skid Vitrified Tiles, Ceramic Tile
Wall Finishing DetailsPremium Acrylic Emulsion/ Distemper/ Cladding
Kitchen DetailsVitrified Tiles, Vitrified Tiles 2' Above Kitchen Counter, Rest Of Walls In Acrylic Emulsion Paint¸ Acrylic Emulsion Paint¸ Prefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame, Aluminium / Upvc Glazing With Performance Glass
Bathroom FittingsVitrified Tile Upto False Ceiling, Moisture Resistant False Ceiling With Acrylic Emulsion Paint, Sink & Washbasin
Doors And Windos FramesPrefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame.
Glass WorkSingle Glazed
Electric FittingsHeavy Duty, Switches-Moduler, Mcb-C- Curve, Led Lights (In Common Area Only)
Conducting And Wiring DetailsPvc Conduit With 1.1 Kv Grade Flexible Copper Wire
Water StorageYes
Lift Details4 Flats Per Floor, 4 Lifts Per Floor
External GlazingsExterior Grade Texture Paint
Windows/GlazingsFull Height Windows- Aluminium Powder Coated Sections
DoorsMain Door To Flat - Hardwood Frame With Veneered Flush Door/ As Per Drawing
Main DoorsMain Door To Flat - Hardwood Frame With Veneered Flush Door/ As Per Drawing
Internal DoorsPrefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame/ As Per Drawing
Air ConditioningSplit Ac
Electrical FittingsLights, Switch Board, Socket, Switches
Cng Pipe LineAs Per Provision
Provision Of Wifi And Broadband FacilityAs Per Design
External Finishing/Colour SchemeExternal Grade Texture Paint
Internal FinishingPremium Acrylic Emulsion/ Distemper

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Devasya Bharat?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.