Notice sent to the promoterHand Recieved By Ar And Uploaded Online
HearingExamination By AuthorityView order Proceedings
The matter is adjourned and to come up on 05.02.2025.
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Ar. Neeraj Gautam, Associate Architectural Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the project. Sh. Tarun Yadav, Sh. Harshvardhan Yadav and Sh. Manjeet Singh are present on behalf of the promoter. Approved as proposed. The certificate shall be issued after rectification of remaining deficiencies pointed out in para no. 21 above.
Registration grantedGGM/913/645/2025/16
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Licence
ZO002/EO018/UE029/GALOT/0000001441
FAR permissible / proposed
3.15 / 3.136
Estimated project cost
₹ 595.96 Cr
Cost of land
₹ 125.09 Cr
Cost of construction
₹ 298.26 Cr
Infrastructure and other structures
₹ 29.69 Cr
EDC, taxes, levies and other costs
₹ 142.92 Cr
How the land will be used
Use
Area (as filed)
Share
Land Area To Be Used For Construction Of Apartments
2,834.466
34.9%
Construction Of Roads
3,308.874
40.7%
Parks And Playgrounds
1,220.219
15%
Green Belts
729.961
9%
Electricity Sub-Station
28.73
0.4%
Guardroom
10
0.1%
Apartments 101 units · 1 tower
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
207.69
2,236
58
Apartment/Shops/Other Buildings
172.15
1,853
28
Apartment/Shops/Other Buildings
190.12
2,046
4
Apartment/Shops/Other Buildings
135.12
1,454
3
Apartment/Shops/Other Buildings
330.59
3,558
2
Apartment/Shops/Other Buildings
284.62
3,064
1
Apartment/Shops/Other Buildings
39.77
428
1
Apartment/Shops/Other Buildings
203.30
2,188
2
Apartment/Shops/Other Buildings
170.23
1,832
2
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
HSVP
Yes
Water Supply
GMDA
No
Electricity
DHBVN
No
Sewage Disposal
GMDA
No
Storm Water Drainage
GMDA
No
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 1.27 Cr
As Per Project Report
Water Supply System
₹ 3 Cr
As Per Project Report
Storm Water Drainage
₹ 2.5 Cr
As Per Project Report
Electricity Supply System
₹ 2 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 60 lakh
As Per Project Report
Street Lighting
₹ 25 lakh
As Per Project Report
Security And Fire Fighting
₹ 4 Cr
As Per Project Report
Playgrounds And Parks
₹ 1.25 Cr
As Per Project Report
Renewable Energy System
₹ 80 lakh
As Per Project Report
Stp
₹ 50 lakh
As Per Project Report
Electrical Sub Station
₹ 5 Cr
As Per Project Report
Underground Water Tank
₹ 3.52 Cr
As Per Project Report
Rainwater Harvesting
₹ 2.5 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
Zoning Plan
Already Been Obtained
11 Oct 2024
Assurance Of Water Supply
Already Been Obtained
25 Jun 2024
Noc For Use Of Treated Waste Water
Already Been Obtained
24 Apr 2024
Permission For Tree Cutting
Already Been Obtained
5 Feb 2024
Assurance Of Sewerage Connection
Already Been Obtained
25 Jun 2024
Assurance Certificate Of DHBVN For Power Supply
Already Been Obtained
12 Jun 2024
Noc For Aravali By Deputy Commissioner
Already Been Obtained
18 Jun 2024
Building Plan Approval
Already Been Obtained
5 Dec 2024
Noc For Height Clearance From Aai
Already Been Obtained
16 Jul 2024
Environment Clearance
Already Been Obtained
14 Nov 2024
Fire Scheme Approval
Already Been Obtained
21 Oct 2024
Service Plan Approval
Already Been Obtained
24 Sep 2024
Specifications (as filed)
Flooring Details Of Various Parts Of House
Stone / Tiles In Common Areas
Wall Finishing Details
Acrylic Emulsion Paint/ Oil Bound Distemper
Kitchen Details
Floor: Vitrified Tiles, Wall: Ceramic Tiles 2FT Above Counter And Obd Paint On Remaining Area, Ceiling: Obd Paint
Bathroom Fittings
All Provided With Standard Company Make
Wood Work Etc
Entrance Doors, Rooms & Toilet
Doors And Windos Frames
Wooden/ Upvc/ Aluminium /Ms Frame With Glass
Glass Work
4MM And Above As Per Specifications
Electric Fittings
As Per The Nbc
Conducting And Wiring Details
As Per The Nbc
Water Storage
Underground Tank & Over Head Tank
Lift Details
4 Nos Passenger Lift & 1NO Service Lift
Windows/Glazings
Upvc / Aluminum / Ms / Wooden Frames With Single / Double Glass Unit With Clear Glass In Shutters & Wire Mesh Shutters In Habitable Rooms. Upvc / Aluminium / Ms Frames With Frosted / Clear Glass In Toilet
Doors
Painted/Polished Frame With Painted / Laminated / Polished / Veneered Flush Door
Main Doors
Painted/Polished Frame With Painted / Laminated / Polished / Veneered Flush Door
Internal Doors
Painted/Polished Frame With Painted / Laminated / Polished / Veneered Flush Door
Air Conditioning
Air-Conditioning Apartment With Energy Efficient Vrv/Vrf System Excluding Toilets & Common Area.
Electrical Fittings
Modular Touch Switches With Copper Wiring, Standard Ceiling Fans In All Rooms (Except Toilets) Exhaust Fan In Toilet & Kitchen & Ceiling Light Fixtures In Balconies. Home Automation For Selected Services As Per Design
External Finishing/Colour Scheme
External Grade Paints/ As Per Nbc
Internal Finishing
Painting On Plaster Surface/ As Per Nbc
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Dalcore The Falcon?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.