Land Area To Be Used For Construction Of Apartments
1.131
42.2%
Construction Of Roads
0.654
24.4%
Pavements
0.2
7.5%
Green Belts
0.145
5.4%
Vehicle Parkings
0.277
10.3%
Any Other
0.274
10.2%
External services
Service
Provided by
Approval taken
Roads
No
WATER SUPPLY
Assurance For Water Supply
Yes
ELECTRICITY
Assurance For Electricity Supply
Yes
SEWAGE DISPOSAL
No
STORM WATER DRAINAGE
ASSURANCE FOR RAIN WATER HARVESTING PIT
Yes
4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
57.33
Submitted To HUDA
2
WATER SUPPLY SYSTEM
98.217
SUBMITTED TO HUDA
3
Storm Water Drainage
18.837
SUBMITTED TO HUDA
4
ELECTRICITY SUPPLY SYSTEM
0
As Per Project Report
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
34.902
SUBMITTED TO HUDA
6
Street Lighting
3.276
SUBMITTED TO HUDA
7
SECURITY AND FIRE FIGHTING
0
As Per Project Report
8
PLAYGROUNDS AND PARKS
0
YET TO BE PREPARED
9
Club House/Community Centre
0
YET TO BE PREPARED
10
SHOPPING AREA
0
Yet To Be Prepared
11
RENEWABLE ENERGY SYSTEM
0
AS PER PROJECT REPORT
12
School
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
Yet To Be Prepared
14
ANY OTHER
62.62
AS PER PROJECT REPORT
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.
22-02-2017
(date)
6. Date of approval of Building Plans
22-02-2017
(date)
(i) Details of the plots/apartments in the project:
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Total size of the plots/carpet area of the apartments
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL SHOPS
6409.327
357
2288129.739
308
49
0
2
APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL SHOP/ FOOD COURT
709.96
68
48277.28
56
12
0
3
APARTMENT/SHOPS/OTHER BUILDINGS Type RESTAURENT
667.317
9
6005.853
1
8
0
4
APARTMENT/SHOPS/OTHER BUILDINGS Type KIOSK
54.06
4
216.24
4
0
0
Total
438
2342629.112
369
69
0
(ii) Apartments/Shops/Other Buildings:-
(a) Status of construction activities in respect of sold/booked apartments.
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
Shops
369
0 CONSTRUCTION IS NEARING COMPLETION
(b) Time schedule of completion of already booked apartments:
Start Date
15-10-2014
Earlier date of completion
13-09-2019
Revised date of completion
30-09-2020
(c) Time schedule for development of infrastructure:
Start Date
27-09-2016
Percentage completion Upto the
date of application
83.11
Projected date of completion
30-06-2020
(d) Provide further details in the proforma REP-I Part-C-X.
(e) Plan of action for completing the Project along with requisite infrastructure.
(iii) Status in respect of plotted colony:-
(a)
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
0
0
(b) Schedule for development of Infrastructure:
Start Date
27-09-2016
Percentage completion
0
Projected date of completion
16-06-2019
(c) Provide further details in the proforma REP-I Part-C-X.
(d) Schedule of completing the project and handing over possession of the plots.
(iv) Vehicle parkings details of the project-
a) Underground parking
357
b) Stilt parking
0
c) Covered parking
0
d) Open parking
49
e) Independent garages
0
(v) Quarterly schedule of development of whole/remaining part of the project:
(a) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
Shops
5124.98
Plots
0
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
Shops
525.709
525.709
Plots
0
0
(b) Infrastructure
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
43.00
Water Supply System
63.84
Sewerage treatment & garbage disposal
26.18
Electricity Supply System
0.00
Storm Water Drainage
16.95
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
87.39
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
9.33
Water Supply System
12.19
12.19
Sewerage treatment & garbage disposal
3.73
0
Electricity Supply System
0
0
Storm Water Drainage
0.39
0
Parks and Playgrounds
0
0
Clubhouse/community centres
0
0
Shopping area
0
0
Other
0
0
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - C-X
1.Financial information:
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
438
ii. No. of Flats/ Apartments booked
369
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
13521.30 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
7016.27 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
1925.00 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
6505.03 Lakhs
vii. Amount invested in the project upto the date of application
9092.32 Lakhs
upto QPR 31.12.2019
Land cost (If any)
1709.23 Lakhs
Apartments
5022.93 Lakhs
Infrastructure
229.79 Lakhs
EDC/ Taxes Etc.
2130.37 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
1057.75 Lakhs
(a) In respect of existing allottees
0 Lakhs
(b) In respect of rest of the project
0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C)
170.84 Lakhs
2.Additional information:
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
57.33
43.00
II. WATER SUPPLY SYSTEM
98.217
63.84
III. STORM WATER DRAINAGE
18.837
16.95
IV. ELECTRICITY SUPPLY SYSTEM
0
0
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
34.902
26.18
VI. CLUB HOUSE/COMMUNITY CENTRE
0
0
VII. SCHOOL
0
0
VIII. ANY OTHER
0
0
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
0
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
0
0
XIII. COVERED PARKING
0
0
XIV. OPEN PARKING
0
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
0
0
XVII. OTHER FACILITIES AS PER PROJECT REPORT
65.896
87.39
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - D
Accounts related information:
1. Annex copy of the balance sheet of last 3 years
Yes
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.
No
3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch address
AXIS BANK LTD., K-12 PARK MAIN, NEW DELHI-16
Bank Account number
919020062156687
IFSC code
UTIB0000015
MICR code
110211003
Branch code
000015
4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
Mr. Ishaan Bhatia(Director) Saahil Bhatia (Director)
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)
No external Debts
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - E
Details of the statutory approvals:
1. Annex copies of the following in Folder E:
i. Lay out Plan
Yes
ii. Demarcation Plan
Yes
iii. Zoning Plan
Yes
iv. Building Plan
Yes
Site Plan
Yes
Floor Plan
Yes
Apartment Plans
No
Elevation Section
Yes
Detail of Permissible FAR
Yes
Detail of covered area achieved FAR
Yes
2. Annex copies of the following in Folder E:
I. ROADS AND PAVEMENT PLAN
Yes
II. ELECTRICITY SUPPLY PLAN
No
III. Water Supply Plan
Yes
IV. SEWERAGE AND GARBAGE DISPOSAL PLAN
No
V. STROM WATER DRAINAGE
Yes
Vi. 10% Land To Be Transferred To The Govt. For Community Facility
No
VII. STREET LIGHTING PLAN
No
VIII. PARKING PLAN
Yes
3. Statutory Approvals Status
Statutory Approvals
Statutory Approvals Status
Date
I. LICENSE GRANTED BY DTCP
ALREADY BEEN OBTAINED
26-10-2009
II. ENVIRONMENT CLEARANCE GRANTED BY SEIAA
ALREADY BEEN OBTAINED
17-10-2014
III. CONSENT TO ESTABLISH GRANTED BY HARYANA STATE POLLUTION CONTROL BOARD
ALREADY BEEN OBTAINED
18-08-2015
IV. AIRPORT CLEARANCE BY AAI (AIRPORT AUTHORITY OF INDIA)
ALREADY BEEN OBTAINED
01-04-2014
V. LOI
ALREADY BEEN OBTAINED
05-02-2009
VI. LC-IV
ALREADY BEEN OBTAINED
05-02-2009
VII. BR-III
ALREADY BEEN OBTAINED
23-07-2014
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________
Seal _____________
Date _____________
FORM REP-I
Part - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
(Annex a copy in Folder F)
Yes
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)
(Annex a copy in Folder F)
Yes
3. Gist of the important provisions of the Draft Agreement
(Annex a copy in Folder F)
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - G
Projects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - H
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
Bare Retails Shops, Common Area Is Having Tiled / Stone Flooring
2
WALL FINISHING DETAILS
Tile/Paint (Common Area)
3
KITCHEN DETAILS
Not Applicable
4
BATHROOM FITTINGS
Common Area- Jaquar/Hind Ware
5
WOOD WORK ETC
Not Applicable
6
DOORS AND WINDOS FRAMES
Glass Doors And Windows
7
GLASS WORK
Shop Front
8
ELECTRIC FITTINGS
Not Applicable Inside The Shops
9
CONDUCTING AND WIRING DETAILS
Db And Cabling Work Provided
10
CUPBOARD DETAILS
Not Applicable
11
WATER STORAGE
Under Ground And Overhead Rcc Tanks
12
LIFT DETAILS
05 Numbers Lmr Kone Make
13
EXTERNAL GLAZINGS
Not Applicable
13.1
WINDOWS/GLAZINGS
Glass Windows
14
DOORS
Not Applicable
14.1
MAIN DOORS
Glass Doors
14.2
INTERNAL DOORS
Not Applicable
15
AIR CONDITIONING
Chilled Water Tapping Provided
16
ELECTRICAL FITTINGS
Common Area Led Fittings Provided
17
CNG PIPE LINE
Not Applicable
18
PROVISION OF WIFI AND BROADBAND FACILITY
Cabling Provision Done
19
EXTERNAL FINISHING/COLOUR SCHEME
Plaster/Paint
20
INTERNAL FINISHING
Brick Work With Plaster/Block Work
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
NOT APPLICABLE
1 . 2
WALLS
NOT APPLICABLE
1 . 3
CEILING
NOT APPLICABLE
2 . Master Bedroom/Dressroom
2 . 1
FLOOR
Not Applicable
2 . 2
WALLS
Not Applicable
2 . 3
CEILING
Not Applicable
2 . 4
MODULAR WARDROBES
Not Applicable
3 . MASTER TOILET
3 . 1
Floor
NOT APPLICABLE
3 . 2
Walls
NOT APPLICABLE
3 . 3
Ceiling
NOT APPLICABLE
3 . 4
Counters
NOT APPLICABLE
3 . 5
Sanitary Ware/Cp Fittings
NOT APPLICABLE
3 . 6
Fitting/Fixtures
NOT APPLICABLE
4 . BED ROOMS
4 . 1
FLOOR
NOT APPLICABLE
4 . 2
WALLS
NOT APPLICABLE
4 . 3
CEILING
NOT APPLICABLE
4 . 4
WARDROBES
NOT APPLICABLE
5 . Toilet
5 . 1
FLOOR
Not Applicable
5 . 2
WALLS
Not Applicable
5 . 3
CEILING
Not Applicable
5 . 4
COUNTERS
Not Applicable
5 . 5
SANITARY WARE/CP FITTINGS
Not Applicable
5 . 6
FIXTURES
Not Applicable
6 . KITCHEN
6 . 1
Floor
NOT APPLICABLE
6 . 2
Walls
NOT APPLICABLE
6 . 3
Ceiling
NOT APPLICABLE
6 . 4
Counters
NOT APPLICABLE
6 . 5
Fixtures
NOT APPLICABLE
6 . 6
Kitchen Appliances
NOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
NOT APPLICABLE
7 . 2
WALLS & CEILING
NOT APPLICABLE
7 . 3
TOILET
NOT APPLICABLE
7 . 4
BALCONY
NOT APPLICABLE
8 . Sit-Outs
8 . 1
FLOOR
Not Applicable
8 . 2
WALLS & CEILING
Not Applicable
8 . 3
RAILINGS
Not Applicable
8 . 4
FIXTURES
Not Applicable
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
List of Uploaded Documents
Sr. No.
Document Description
Date of Document Upload
View Document
1
In Case Of Group Housing/ Commercial Sites, A Copy Of The Approved Site Plan
22-11-2019
View Document
2
SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN
22-11-2019
View Document
3
A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS
22-11-2019
View Document
4
Demarcation Plan
22-11-2019
View Document
5
ZONING PLAN
22-11-2019
View Document
6
DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD
22-11-2019
View Document
7
Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed.
22-11-2019
View Document
8
DETAIL OF COMMERCIAL UNITS FOR SALE
23-11-2019
View Document
9
COPY OF LICENSE ALONG WITH SCHEDULE OF LAND
23-11-2019
View Document
10
Bank Details Annexure A
17-02-2020
View Document
11
CERTIFICATE FROM CHARTERED ACCOUNTANT OF AMOUNT INCURRED ON PROJECT AND AMOUNT COLLECTED FROM CUSTOMERS
23-11-2019
View Document
12
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT
23-11-2019
View Document
13
In Case Of Plotted Colony, The Latest Layout Plan
23-11-2019
View Document
14
QPR DEC 2019 SIGNED WITH ANNEXURES ABC
07-02-2020
View Document
15
SERVICE PLAN LETTER
07-02-2020
View Document
16
Pollution Noc
07-02-2020
View Document
17
SERVICE PLAN ESTIMATE SUBMISSION - RECEIVING
07-02-2020
View Document
18
SITE PLAN
07-02-2020
View Document
19
Renewed License 59 Of 2009 Up To 2020
07-02-2020
View Document
20
SERVICE PLANS
07-02-2020
View Document
21
NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
07-02-2020
View Document
22
Lc IV
07-02-2020
View Document
23
REVISED BUILDING PLANS
07-02-2020
View Document
24
LOI
07-02-2020
View Document
25
Balance Sheet
07-02-2020
View Document
26
FOREST NOC
07-02-2020
View Document
27
AAI NOC
07-02-2020
View Document
28
Service Estimate
07-02-2020
View Document
29
NON ENCUMBRANCE CERTIFICATE
07-02-2020
View Document
30
CASH FLOW STATEMENT OF THE PROPOSED PROJECT
07-02-2020
View Document
31
Environment Clearance For Construction
07-02-2020
View Document
32
CTE RENEWAL UPTO OCTOBER 2021
07-02-2020
View Document
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 57.33 lakh
Submitted To HUDA
Water Supply System
₹ 98.22 lakh
Submitted To HUDA
Storm Water Drainage
₹ 18.84 lakh
Submitted To HUDA
Sewage Treatment & Garbage Disposal
₹ 34.9 lakh
Submitted To HUDA
Street Lighting
₹ 3.28 lakh
Submitted To HUDA
Any Other
₹ 62.62 lakh
As Per Project Report
Statutory approvals
Approval
Status
Date
License Granted By Dtcp
Already Been Obtained
26 Oct 2009
Environment Clearance Granted By Seiaa
Already Been Obtained
17 Oct 2014
Consent To Establish Granted By Haryana State Pollution Control Board
Already Been Obtained
18 Aug 2015
Airport Clearance By Aai (Airport Authority Of India)
Already Been Obtained
1 Apr 2014
Loi
Already Been Obtained
5 Feb 2009
Lc-IV
Already Been Obtained
5 Feb 2009
Br-III
Already Been Obtained
23 Jul 2014
Specifications (as filed)
Flooring Details Of Various Parts Of House
Bare Retails Shops, Common Area Is Having Tiled / Stone Flooring
Wall Finishing Details
Tile/Paint (Common Area)
Kitchen Details
Not Applicable
Bathroom Fittings
Common Area- Jaquar/Hind Ware
Wood Work Etc
Not Applicable
Doors And Windos Frames
Glass Doors And Windows
Glass Work
Shop Front
Electric Fittings
Not Applicable Inside The Shops
Conducting And Wiring Details
Db And Cabling Work Provided
Cupboard Details
Not Applicable
Water Storage
Under Ground And Overhead Rcc Tanks
Lift Details
05 Numbers Lmr Kone Make
External Glazings
Not Applicable
Windows/Glazings
Glass Windows
Doors
Not Applicable
Main Doors
Glass Doors
Internal Doors
Not Applicable
Air Conditioning
Chilled Water Tapping Provided
Electrical Fittings
Common Area Led Fittings Provided
Cng Pipe Line
Not Applicable
Provision Of Wifi And Broadband Facility
Cabling Provision Done
External Finishing/Colour Scheme
Plaster/Paint
Internal Finishing
Brick Work With Plaster/Block Work
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Commercial Project?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.