LapsedHRERA GurugramInterim Rera

Commercial Project

by Gentle Realtors Pvt. Ltd & Luminos Builders Pvt. Ltd · Sector-66, Badshahpur, Gurugram- Manesar Urban Complex, Gurugram

RERA registration
20 OF 2018
Registered on
2 Feb 2018
Valid till
31 Dec 2024
Project ID
RERA-GRG-600-2020
Land area
4.843 acres
Estimated cost
₹ 600.39 Cr

RERA registration

Registration certificate20 OF 2018, dated 2 Feb 2018
Registration valid till31 Dec 2024
Project IDRERA-GRG-600-2020
AuthorityHRERA Gurugram (Interim Rera)
Project type (as filed)Ongoing
Project nameCommercial Project
PromoterGentle Realtors Private Limited Luminos Builders Pvt. Ltd.
Promoter’s registered officeLgf C-34, Sushant Shopping Arcade, Sushant Lok, Phase - 1, Gurugram - 122002, Haryana
CINU45201HR2006PTC044855
Site addressSector 66, Gurugram
SectorSector 66
Tehsil / DistrictBadshahpur St / Gurugram
Layout plan approved9 May 2018
Building plans approved9 May 2018
Application submitted12 Feb 2020

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Next hearingNot Required
  1. Registration granted 20 OF 2018
  2. Application submitted online
  3. Application received by HRERA Gurugram
  1. Registration valid till

Land, licence & cost

Land area of the project4.843 acres
Total licensed area4.843 acres
Licence165 of 2008 dated 8.09.2008
FAR permissible / proposed32982.94 / 175
Estimated project cost₹ 600.39 Cr
Cost of land₹ 278.41 Cr
Cost of construction₹ 153.52 Cr
Infrastructure and other structures₹ 60.46 Cr
EDC, taxes, levies and other costs₹ 108 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments1.75436.2%
Construction Of Roads0.98420.3%
Pavements0.4739.8%
Green Belts1.60833.2%
Vehicle Parkings0.0150.3%
Rain Water Harvesting0.0090.2%

External services

ServiceProvided byApproval taken
RoadsHSVP/ GMDANo
Water SupplyHSVP/ GMDANo
ElectricityDHBVNLNo
Sewage DisposalHSVP/ GMDANo
Storm Water DrainageHSVP/ GMDANo

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 1.46 CrAs Per Project Report
Water Supply System₹ 48.6 lakhAs Per Project Report
Storm Water Drainage₹ 29.09 lakhAs Per Project Report
Electricity Supply System₹ 4.43 CrAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 56.24 lakhAs Per Project Report
Street Lighting₹ 69 lakhAs Per Project Report
Security And Fire Fighting₹ 5.42 CrAs Per Project Report
Playgrounds And Parks₹ 22.81 lakhAs Per Project Report
Renewable Energy System₹ 70 lakhAs Per Project Report
Any Other₹ 29.44 CrAs Per Project Report
Parking₹ 3.21 CrAs Per Project Report
Underground Water Tank₹ 1.38 CrAs Per Project Report
Rain Water Harvesting₹ 17.73 lakhAs Per Project Report

Statutory approvals

ApprovalStatusDate
LicenceAlready Been Obtained8 Sep 2008
Zoning PlanAlready Been Obtained31 Oct 2013
Building PlanAlready Been Obtained9 May 2018
Environment ClearanceAlready Been Obtained30 Jan 2018
AravaliAlready Been Obtained13 May 2014
ForestAlready Been Obtained5 May 2014
Noc For Height ClearanceAlready Been Obtained3 Nov 2017
Harera RegistrationAlready Been Obtained2 Feb 2018

Specifications (as filed)

Flooring Details Of Various Parts Of HouseRcc Slab
Wall Finishing DetailsPainted/White Wash Masonry Wall/Partition
Bathroom FittingsChinaware & Cp Fittings Of Standard Makes, Washbasin With & Without Counter
Doors And Windos FramesPowder Coated Aluminium Frame
Glass WorkGlass Thickness Of 5 To 12 Mm
Electric FittingsPublic Areas & Toilets To Be Provided With Led Light Fixtures.
Conducting And Wiring DetailsIsi Approved Conduits & Wires
Water StorageRcc Tank
Lift DetailsSchindler/Thyseenkrup/Hitachi/Kone
External GlazingsPowder Coated Aluminium Glazing With Glass Of 5-12 Mm Thick Glass
Windows/GlazingsPowder Coated Aluminium Glazing With Glass Of 5-12 Mm Thick Glass
DoorsAluminium Doors / Glass Doors
Main DoorsAluminium Doors / Glass Doors
Internal DoorsMs/Aluminium/Wooden Doors
Air ConditioningChilled Water Ac System For Office & Provision For Water Cooled Dx System Upto Tap Off Inside Shop
Electrical FittingsProvision Of Wire / Cable Up To Distribution Board Isi /Bis Approved
Provision Of Wifi And Broadband FacilityProvision Of Ont Box Only
External Finishing/Colour SchemePaint/Glass/Acp
Internal FinishingAntiskid Tiles/Ips On Floor, Paint /White Wash Finish On Wall & Ceiling In Public Areas

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Commercial Project?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.