Chintels Corporate Park, Sector-114, Gurugram-122017
CIN
U99999DL1985PLC020826
Site address
Sector 109, Gurugram
Sector
Sector 109
Tehsil / District
Gurgaon / Gurugram
Layout plan approved
26 Jul 2013
Building plans approved
26 Jul 2013
Application submitted
8 Jan 2020
Authority, hearings & orders
Current statusApproved And Certificate Uploaded
Next hearingNot Required
Registration granted125 OF 2017
Registration valid till
Application submitted online
Application received by HRERA Gurugram
Land, licence & cost
Licence
licence no. 50 of 2012 and 250 of 2007
FAR permissible / proposed
23017.31 / 174.45
Estimated project cost
₹ 155.41 Cr
Cost of land
₹ 8.38 Cr
Cost of construction
₹ 80 Cr
Infrastructure and other structures
₹ 20 Cr
EDC, taxes, levies and other costs
₹ 47.03 Cr
How the land will be used
Use
Area (as filed)
Share
Land Area To Be Used For Construction Of Apartments
1,032
7.8%
Construction Of Roads
1,742
13.2%
Pavements
361
2.7%
Parks And Playgrounds
7,000
53.2%
Green Belts
634
4.8%
Vehicle Parkings
1,500
11.4%
Electricity Sub-Station
25
0.2%
Club House
480
3.6%
Any Other
378
2.9%
External services
Service
Provided by
Approval taken
Roads
SELF
Yes
Water Supply
HUDA
Yes
Electricity
DHBVN
Yes
Sewage Disposal
HUDA
Yes
Storm Water Drainage
HUDA
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 2.75 Cr
As Per Project Report
Water Supply System
₹ 1.8 Cr
As Per Project Report
Storm Water Drainage
₹ 70 lakh
As Per Project Report
Electricity Supply System
₹ 5.01 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 91 lakh
As Per Project Report
Street Lighting
₹ 10 lakh
As Per Project Report
Security And Fire Fighting
₹ 3 Cr
As Per Project Report
Playgrounds And Parks
₹ 1.03 Cr
As Per Project Report
Club House/Community Centre
₹ 3.3 Cr
As Per Project Report
Shopping Area
₹ 1.2 Cr
As Per Project Report
Renewable Energy System
₹ 20 lakh
As Per Project Report
Statutory approvals
Approval
Status
Date
Occupation Certificate
Already Been Obtained
12 Feb 2019
Specifications (as filed)
Flooring Details Of Various Parts Of House
Living Dining Lobby Engineering Marble Bedrooms Wooden Flooring Toilets
Wall Finishing Details
Plaster And Painted
Kitchen Details
Modular Kitchen
Bathroom Fittings
Kohler
Wood Work Etc
Cupboard And Kitchen
Doors And Windos Frames
External Aluminum Internal Wooden
Glass Work
Toughened Glass
Electric Fittings
Panasonic Switches And Sockets
Conducting And Wiring Details
Frls Pvc Conduiting Wiring Poly Cab
Cupboard Details
Pre- Laminated Mdf With Pu Finished Paint
Water Storage
Overhead Water Tank
Lift Details
2NOS Per Tower
External Glazings
Aluminum And Glass Work
Windows/Glazings
Aluminum And Glass Work
Doors
Wooden Flush Door
Main Doors
Wooden Flush Door
Internal Doors
Wooden Flush Door
Air Conditioning
Vrv System Lg Make
Electrical Fittings
Panasonic Switches And Sockets
Cng Pipe Line
Gas Pipeline
Provision Of Wifi And Broadband Facility
Ftts Services
External Finishing/Colour Scheme
Texture Paint
Internal Finishing
Plaster And Paint
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Chintels Serenity-Tower NO.3,4,5, EWS Block?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.