95 of 2011 Dated 28.10.2011 vide Endst. No. - LC - 1245-JE(VA)-2011/16185
FAR permissible / proposed
175 / 174.98
Estimated project cost
₹ 608.87 Cr
Cost of land
₹ 93.6 Cr
Cost of construction
₹ 333.85 Cr
Infrastructure and other structures
₹ 10.2 Cr
EDC, taxes, levies and other costs
₹ 171.22 Cr
How the land will be used
Use
Area (as filed)
Share
Land Area To Be Used For Construction Of Apartments
4,954.076
7.4%
Construction Of Roads
7,500
11.3%
Pavements
3,700
5.6%
Parks And Playgrounds
16,069.35
24.1%
Vehicle Parkings
29,532
44.3%
Electricity Sub-Station
330
0.5%
Club House
773
1.2%
Sewage And Solid Waste Treatment Facility
510
0.8%
Villas
3,248
4.9%
External services
Service
Provided by
Approval taken
Roads
HUDA
Yes
Water Supply
HUDA
No
Electricity
DHBVN
No
Sewage Disposal
HUDA
Yes
Storm Water Drainage
HUDA
Yes
Statutory approvals
Approval
Status
Date
License No 95/2011
Already Been Obtained
28 Oct 2011
Building Plan Approval
Already Been Obtained
1 May 2012
Fire Fighting Scheme Approval
Already Been Obtained
21 Sep 2012
Aai Noc
Already Been Obtained
13 Mar 2012
Environmental Clearance
Already Been Obtained
27 Dec 2012
Aravalli Clearance
Already Been Obtained
10 Feb 2012
Specifications (as filed)
Flooring Details Of Various Parts Of House
Vitrified Tile And Wooden Flooring In Master Bed
Wall Finishing Details
Acrylic Emulsion Paint
Kitchen Details
Semi Modular Kitchen
Bathroom Fittings
Cp Fitting And Chinaware Along With Gyser And Exhaust Fan
Wood Work Etc
Kitchen And Wardrobe In Rooms Only
Doors And Windos Frames
Polished Skin Door And Hardwood Door Frame, Aluminium Window
Glass Work
Window Fitted With Transparent Glass
Electric Fittings
Copper Wiring With Modular Switch
Conducting And Wiring Details
Pvt Conduct And Copper Wiring
Cupboard Details
Wooden Commercial Ply Wood Cupboard Only In Bedrooms
Water Storage
200000/- Ltr Water Storage Tank
Lift Details
One Service Lift And 1 Passenger Lift In All Tower
External Glazings
Weather Proof Exterior Paint
Windows/Glazings
Aluminum Glaze Window
Doors
Polished Skin Door With Hardwood Frame Door Frames
Main Doors
Polished Skin Door With Hardwood Frame Door Frames
Internal Doors
Polished Skin Door With Hardwood Frame Door Frames
Air Conditioning
1.5 Tons In Bed Room And Living Room
Electrical Fittings
Modular Switchs And Sockets
Cng Pipe Line
Not Applicable
Provision Of Wifi And Broadband Facility
Not Applicable
External Finishing/Colour Scheme
Exterior Paint
Internal Finishing
Designer Pop Cornice
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Assotech Blith?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.