B-2/3, Kh No 8/8, Second Floor , Chattarpur Ext, New Delhi 110074
CIN
U74899DL1983PTC014992
Site address
Sector-37C, Gurugram
Sector
Sector 37C
Tehsil / District
Kadipur St / Gurugram
Layout plan approved
8 Oct 2018
Building plans approved
8 Oct 2018
Construction start (as filed)
31 Jan 2019
Completion (as filed)
31 Jan 2023
Application submitted
23 Oct 2018
Authority, hearings & orders
Current statusExtension Certificate Uploaded
Next hearingNot Required
Application submitted online
Registration grantedGGM/294/2018/26
Application received by HRERA Gurugram
Registration valid till
Land, licence & cost
Land area of the project
20,100.704 acres
Total licensed area
5 acres
Licence
15 of 2018
FAR permissible / proposed
45403.469 / 228
Estimated project cost
₹ 142.93 Cr
Cost of land
₹ 34.14 Cr
Cost of construction
₹ 86.5 Cr
Infrastructure and other structures
₹ 12.16 Cr
EDC, taxes, levies and other costs
₹ 10.13 Cr
How the land will be used
Use
Acres
Share
Land Area To Be Used For Construction Of Apartments
5,893.849
29.3%
Construction Of Roads
1,960.012
9.8%
Green Belts
4,020.224
20%
Vehicle Parkings
7,780.841
38.7%
Club House
222.889
1.1%
Any Other
222.889
1.1%
Apartments 782 units · 5 towers
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
59.80
644
48
Apartment/Shops/Other Buildings
53.75
579
334
Apartment/Shops/Other Buildings
51.00
549
334
Apartment/Shops/Other Buildings
18.06
194
9
Apartment/Shops/Other Buildings
18.56
200
16
Apartment/Shops/Other Buildings
16.62
179
4
Apartment/Shops/Other Buildings
16.19
174
2
Apartment/Shops/Other Buildings
18.50
199
16
Apartment/Shops/Other Buildings
14.82
160
5
Apartment/Shops/Other Buildings
16.66
179
14
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
No
WATER SUPPLY
HSVP 139144 Dated 10.07.2018
Yes
ELECTRICITY
Applied For Dated 08.10.2018
Yes
SEWAGE DISPOSAL
HSVP 139139 Dated 10.07.2018
Yes
STORM WATER DRAINAGE
HSVP 139139 Dated 10.07.2018
Yes
4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
300
AS PER PROJECT REPORT
2
Water Supply System
125
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
77
As Per Project Report
4
ELECTRICITY SUPPLY SYSTEM
437
AS PER PROJECT REPORT
5
Sewage Treatment & Garbage Disposal
50
AS PER PROJECT REPORT
6
STREET LIGHTING
25
As Per Project Report
7
SECURITY AND FIRE FIGHTING
100
AS PER PROJECT REPORT
8
Playgrounds And Parks
15
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
10
As Per Project Report
10
SHOPPING AREA
20
AS PER PROJECT REPORT
11
Renewable Energy System
40
AS PER PROJECT REPORT
12
SCHOOL
10
As Per Project Report
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
Any Other
7
AS PER PROJECT REPORT
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.
08-10-2018
(date)
6. Date of approval of Building Plans
08-10-2018
(date)
7. New projects:
i) Likely date of starting the construction work
31-01-2019
ii) Likely date of completing the project
31-01-2023
iii) Sizes of the plots to be offered in the project
Sr. No
Plot Area(In Square Meter)
Number of plots in the project
1
0
0
Total
0
iv. Type of apartments to be constructed in the project:
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
59.8
48
4
Apartment/Shops/Other Buildings
53.749
334
2
Apartment/Shops/Other Buildings
50.996
334
5
Apartment/Shops/Other Buildings
18.063
9
1
Apartment/Shops/Other Buildings
18.561
16
1
Apartment/Shops/Other Buildings
16.624
4
1
Apartment/Shops/Other Buildings
16.1898
2
1
Apartment/Shops/Other Buildings
18.497
16
1
Apartment/Shops/Other Buildings
14.823
5
1
Apartment/Shops/Other Buildings
16.658
14
1
Apartment/Shops/Other Buildings
0
0
0
(vi) Quarterly schedule of development of whole/remaining part of the project:
(c) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
Shops
0
Plots
0
(d) Infrastructure
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - D
Accounts related information:
1. Annex copy of the balance sheet of last 3 years
Yes
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.
No
3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch address
NEW DELHI
Bank Account number
000000000
IFSC code
XXXX11110
MICR code
XXXX11110
Branch code
000000
4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
XXXXXX
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - E
Details of the statutory approvals:
1. Annex copies of the following in Folder E:
i. Lay out Plan
Yes
ii. Demarcation Plan
Yes
iii. Zoning Plan
Yes
iv. Building Plan
Yes
Site Plan
Yes
Floor Plan
Yes
Apartment Plans
Yes
Elevation Section
Yes
Detail of Permissible FAR
Yes
Detail of covered area achieved FAR
Yes
2. Annex copies of the following in Folder E:
I. ROADS AND PAVEMENT PLAN
No
II. Electricity Supply Plan
No
III. WATER SUPPLY PLAN
No
IV. SEWERAGE AND GARBAGE DISPOSAL PLAN
No
V. Strom Water Drainage
No
VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY
No
VII. STREET LIGHTING PLAN
No
Viii. Parking Plan
No
3. Statutory Approvals Status
Statutory Approvals
Statutory Approvals Status
Date
I. Denarcation Plan Zp-1238-Ad(Ra)/2018/28705
ALREADY BEEN OBTAINED
10-10-2018
II. Zoning Plan 6313/2018
ALREADY BEEN OBTAINED
15-02-2018
III. Environmental Clearance Seiaa/Hr/2018/1105
ALREADY BEEN OBTAINED
20-08-2018
IV. Forest Noc Ncw-M4Y-B7RG
ALREADY BEEN OBTAINED
03-07-2018
V. Natural Conservation Noc 34
ALREADY BEEN OBTAINED
04-08-2018
Vi. Airport Authority Noc Aai/Rhq/Nr/Atm/Noc/2018,264/1404-1407
ALREADY BEEN OBTAINED
04-09-2018
Vii. HUDA Construction Water Noc A1/Admin 2018/Noc/9166
ALREADY BEEN OBTAINED
02-07-2018
Viii. Water Supply Assurance HSVP 139144
ALREADY BEEN OBTAINED
10-07-2018
Ix. Sewerage Connection Assurance HSVP 139139
ALREADY BEEN OBTAINED
10-07-2018
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________
Seal _____________
Date _____________
FORM REP-I
Part - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
(Annex a copy in Folder F)
Yes
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)
(Annex a copy in Folder F)
Yes
3. Gist of the important provisions of the Draft Agreement
(Annex a copy in Folder F)
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - G
Projects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - H
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
TILES
2
WALL FINISHING DETAILS
OIL BOUND DISTEMPER
3
KITCHEN DETAILS
OIL BOUND DISTEMPER
4
BATHROOM FITTINGS
ISI MARKED CP FITTINGS, W.C & /WASGBASIN
5
WOOD WORK ETC
NA
6
DOORS AND WINDOS FRAMES
DOORS WITH WOODEN FRAME. WINDOWS- AL. POWDER COATED/MS SECTIONS
7
GLASS WORK
4-5 MM ANNEALED GLASS
8
ELECTRIC FITTINGS
ISI MARKED SWITCHES & SOCKETS
9
CONDUCTING AND WIRING DETAILS
COPPER WIRING IN CONCEALED CONDUITS
10
CUPBOARD DETAILS
NA
11
WATER STORAGE
OVER HEAD TANKS
12
LIFT DETAILS
AS PER ISI STANDARDS
13
EXTERNAL GLAZINGS
A1 POWDER COATED/MS SECTIONS WITH 4-5 MM ANNEALED ISI MARKED GLASS
13.1
WINDOWS/GLAZINGS
A1 POWDER COATED/MS SECTIONS WITH 4-5 MM ANNEALED ISI MARKED GLASS
14
DOORS
NA
14.1
MAIN DOORS
BOTH SIDE LAMINATED FLUSH DOOR
14.2
INTERNAL DOORS
FLUSH DOORS (PAINTED BOTH SIDE)
15
AIR CONDITIONING
NA
16
ELECTRICAL FITTINGS
AS MENTIONED IN POINT NO 8 ABOVE.
17
CNG PIPE LINE
NA
18
PROVISION OF WIFI AND BROADBAND FACILITY
NA
19
EXTERNAL FINISHING/COLOUR SCHEME
EXTERNAL GRADE PAINT
20
INTERNAL FINISHING
OIL BOUND DISTEMPER
Specification Unit Wise
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
Floor
TILES
1 . 2
Walls
OIL BOUND DISTEMPER
1 . 3
Ceiling
OIL BOUND DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
TILES
2 . 2
WALLS
OIL BOUND DISTEMPER
2 . 3
CEILING
OIL BOUND DISTEMPER
2 . 4
MODULAR WARDROBES
NA
3 . Master Toilet
3 . 1
FLOOR
Tiles
3 . 2
WALLS
Oil Bound Distemper
3 . 3
CEILING
Oil Bound Distemper
3 . 4
COUNTERS
Na
3 . 5
SANITARY WARE/CP FITTINGS
Isi Marked, Cp Fittings, W.c. & Washbasin
3 . 6
FITTING/FIXTURES
Isi Marked
4 . BED ROOMS
4 . 1
Floor
TILES
4 . 2
Walls
OIL BOUND DISTEMPER
4 . 3
Ceiling
OIL BOUND DISTEMPER
4 . 4
Wardrobes
NA
5 . TOILET
5 . 1
FLOOR
TILES
5 . 2
WALLS
OIL BOUND DISTEMPER
5 . 3
CEILING
OIL BOUND DISTEMPER
5 . 4
COUNTERS
NA
5 . 5
SANITARY WARE/CP FITTINGS
ISI MARKED, CP FITTINGS, W.C. & WASHBASIN
5 . 6
FIXTURES
ISI MARKED
6 . Kitchen
6 . 1
FLOOR
Tiles
6 . 2
WALLS
Oil Bound Distemper
6 . 3
CEILING
Oil Bound Distemper
6 . 4
COUNTERS
Indian Marble
6 . 5
FIXTURES
Isi Marked
6 . 6
KITCHEN APPLIANCES
Na
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
Floor
TILES
7 . 2
Walls & Ceiling
OIL BOUND DISTEMPER
7 . 3
Toilet
TILES & OIL BOUND DISTEMPER
7 . 4
Balcony
TILES & OIL BOUND DISTEMPER
8 . SIT-OUTS
8 . 1
FLOOR
VITRIFIED TILES
8 . 2
WALLS & CEILING
OIL BOUND DISTEMPER
8 . 3
RAILINGS
MS RAILING WITH ENAMEL PAINT FINISH
8 . 4
FIXTURES
ISI MARKED
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
List of Uploaded Documents
Sr. No.
Document Description
Date of Document Upload
View Document
1
DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD
23-10-2018
View Document
2
Zoning Plan
23-10-2018
View Document
3
DEMARCATION PLAN
23-10-2018
View Document
4
COPY OF LICENSE ALONG WITH SCHEDULE OF LAND
23-10-2018
View Document
5
A Complete Set Of The Last Approved Building Plans
23-10-2018
View Document
6
CASH FLOW STATEMENT OF THE PROPOSED PROJECT
23-10-2018
View Document
7
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT
23-10-2018
View Document
8
Service Plans Showing The Services On The Layout Plan
23-10-2018
View Document
9
NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
23-10-2018
View Document
10
IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
23-10-2018
View Document
11
Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed.
23-10-2018
View Document
12
FOREST CLEARANCE
23-10-2018
View Document
13
NOC FOR NON CONSERVATION ZONE
23-10-2018
View Document
14
HSVP Noc
23-10-2018
View Document
15
AIRPORT AUTHORITY NOC
23-10-2018
View Document
16
BALANCE SHEET
23-10-2018
View Document
17
Details Of Registered Agents
23-10-2018
View Document
18
BALANCE SHEET 2017
23-10-2018
View Document
19
DETAILS OF ARCHITECT
23-10-2018
View Document
20
Details Of Ca
23-10-2018
View Document
21
DETAILS OF STRUCTURE ENGINEER
23-10-2018
View Document
22
SALE DEED
23-10-2018
View Document
23
Address Proof Of Company
23-10-2018
View Document
24
AUTHORIZED SIGNATORY
23-10-2018
View Document
25
COMPANY GST CERTIFICATE
23-10-2018
View Document
26
Company Pan Card
23-10-2018
------
27
IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN
23-10-2018
View Document
28
MOA AND AOA
23-10-2018
View Document
29
Director Details
23-10-2018
View Document
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Documents Uploaded After Registration
Sr. No.
Document Description
Date of Document Upload
View Document
1
PROJECT CONTINUATION- RC/REP/HARERA/GGM/26 of 2018/7(3)/63/2025/05 DATED 07.03.2025
04-04-2025
View Document
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
HUDA Construction Water Noc A1/Admin 2018/Noc/9166
Already Been Obtained
2 Jul 2018
Water Supply Assurance HSVP 139144
Already Been Obtained
10 Jul 2018
Sewerage Connection Assurance HSVP 139139
Already Been Obtained
10 Jul 2018
Specifications (as filed)
Flooring Details Of Various Parts Of House
Tiles
Wall Finishing Details
Oil Bound Distemper
Kitchen Details
Oil Bound Distemper
Bathroom Fittings
Isi Marked Cp Fittings, W.c & /Wasgbasin
Doors And Windos Frames
Doors With Wooden Frame. Windows- Al. Powder Coated/Ms Sections
Glass Work
4-5 Mm Annealed Glass
Electric Fittings
Isi Marked Switches & Sockets
Conducting And Wiring Details
Copper Wiring In Concealed Conduits
Water Storage
Over Head Tanks
Lift Details
As Per Isi Standards
External Glazings
A1 Powder Coated/Ms Sections With 4-5 Mm Annealed Isi Marked Glass
Windows/Glazings
A1 Powder Coated/Ms Sections With 4-5 Mm Annealed Isi Marked Glass
Main Doors
Both Side Laminated Flush Door
Internal Doors
Flush Doors (Painted Both Side)
Electrical Fittings
As Mentioned In Point No 8 Above.
External Finishing/Colour Scheme
External Grade Paint
Internal Finishing
Oil Bound Distemper
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Aashiyara?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.