Registration validHRERA Gurugram

Aanandam Ora

by Ora Land And Housingprivate Limited · Sector 93, Gurugram

RERA registration
GGM/711/443/2023/55
Registered on
17 Apr 2023
Valid till
31 Mar 2027
Project ID
RERA-GRG-1340-2023
Land area
15.7 acres
Plots
306
Completion (as filed)
31 Mar 2027
Estimated cost
₹ 113.24 Cr

RERA registration

Registration certificateGGM/711/443/2023/55, dated 17 Apr 2023
Registration valid till31 Mar 2027
Project IDRERA-GRG-1340-2023
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameAanandam Ora
PromoterOra Land And Housingprivate Limited
Promoter’s registered officeJ-10/5, DLF Phase - 2, M.g.road, Gurgaon
CINU45200DL2008PTC182068
Site addressSector 93, Gurugram
SectorSector 93
Tehsil / DistrictHarsaru St / Gurugram
Layout plan approved16 Feb 2023
Construction start (as filed)1 Mar 2023
Completion (as filed)31 Mar 2027
Application submitted29 Mar 2023

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing fixed
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter Dispatched To Ar
  1. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Ar. Neeraj Gautam, Associate Architectural Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Rasendra Kumar Pathak (AR) is present on the behalf of the promoter. The Authority directed the promoter to submit an undertaking regarding no sale in the previous license no. 108 of 2022. The promoter shall submit two BG/DD amounting to Rs. 25 lakhs each as a security amount for submission of approved zoning plan and approved service plans and estimates within three months. The Authority decided to grant the registration certificate subject to submission of above.

  2. Registration granted GGM/711/443/2023/55
  3. Certificate uploaded RC Uploaded
  1. Registration valid till

Land, licence & cost

Land area of the project15.7 acres
Total licensed area15.7 acres
Licence108 0f 2022 and 33 of 2023
Estimated project cost₹ 113.24 Cr
Cost of land₹ 68.84 Cr
Infrastructure and other structures₹ 17.65 Cr
EDC, taxes, levies and other costs₹ 26.76 Cr

How the land will be used

UseSq mShare
Plots To Be Sold33,207.651.3%
Construction Of Roads14,346.6722.2%
Parks And Playgrounds5,129.397.9%
Area To Be Left For Transferring To The Government For Community Services6,355.459.8%
Areaundertwentyfourmtrroad1,996.793.1%
Commercial2,472.153.8%
Milkbooth27.50%
Ugtone2000.3%
Ugttwo2000.3%
Essone1500.2%
Esstwo1500.2%
Undergroundstp4500.7%

Plots 306 plots

Plot size (sq m)Sq ydSq ftPlots
50.67615451
54.35655851
55.29665951
55.47665971
56.01676031
56.11676041
56.21676051
56.30676061
56.43676071
56.53686081
56.62686091
56.72686111
56.82686121
56.95686131
57.04686141
69.74837511
73.70887931
74.71898041
76.01918181
76.59928241
77.06928291
77.52938341
77.95938391
78.39948441
78.78948481
78.85948491
80.32968651
83.07998941
84.451019091
86.411039301
87.321049401
88.291069501
88.751069551
88.891069571
89.041069581
90.011089691
90.441089731
90.481089747
91.1810998215
91.331099831
91.891109891
92.821119991
93.061111,0021
93.361121,0051
93.371121,0051
93.471121,0061
93.671121,0081
93.801121,0101
93.841121,0101
93.881121,0111
93.941121,0111
93.981121,0123
94.051121,0121
94.081131,0131
94.121131,0132
94.181131,0141
94.191131,0141
94.191131,0141
94.261131,01516
94.291131,0151
94.331131,0152
94.571131,0181
94.581131,0181
94.971141,0221
95.391141,0271
95.811151,0311
95.841151,0321
96.201151,0351
96.621161,0401
96.841161,0421
97.051161,0451
97.441171,0491
97.831171,0531
97.871171,0531
98.251181,0581
98.671181,0621
99.061181,0661
99.301191,0692
99.371191,0701
99.471191,0711
99.531191,0711
99.601191,0721
99.701191,0731
99.711191,07315
99.801191,0741
99.871191,0751
99.931201,0761
100.001201,0761
100.101201,0771
100.201201,0791
100.271201,0791
100.331201,0801
100.431201,0811
100.531201,0822
100.651201,0831
100.751201,0841
100.871211,0861
101.441211,0921
101.791221,0961
101.911221,0971
102.781231,1061
103.101231,11010
103.611241,1151
104.401251,1245
104.481251,1251
105.351261,1341
106.181271,1431
107.051281,1522
107.601291,1581
109.991321,1841
110.281321,1871
111.651341,2021
111.951341,2051
112.021341,2061
112.091341,2071
112.161341,2071
112.231341,2081
112.341341,2091
112.451341,2101
112.521351,2111
112.601351,2121
115.151381,2398
117.981411,2701
121.481451,3081
122.171461,3151
122.391461,3171
122.771471,3211
124.291491,3382
124.761491,3431
125.471501,3511
125.651501,3526
127.041521,3671
127.821531,37617
128.051531,3781
128.261531,3811
128.441541,3821
128.471541,3831
128.581541,3841
128.901541,3871
128.951541,3881
129.171541,3901
129.391551,3931
129.611551,3951
129.831551,3981
130.061561,4001
130.281561,4021
130.541561,4051
130.801561,4081
131.021571,4101
131.241571,4131
131.571571,4161
132.461581,4261
132.961591,4311
133.001591,4321
133.691601,4391
134.521611,4481
134.851611,4521
134.851611,4521
135.001611,4533
135.181621,4551
135.391621,4571
136.441631,4691
137.031641,4759
137.721651,4821
137.891651,4841
139.181661,4981
139.211661,4983
139.551671,5021
139.841671,5051
140.021671,5071
140.061681,5081
140.341681,5111
142.371701,5324
142.661711,5361
144.161721,5521
144.891731,5604
145.491741,5661
145.791741,5691
146.081751,5721
146.381751,5761
146.511751,5771
149.731791,6129

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
GMDANoELECTRICITY
DHBVNNoSEWAGE DISPOSAL
GMDANoSTORM WATER DRAINAGE
GMDANo4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)1INTERNAL ROADS AND PAVEMENTS
460.00YET TO BE PREPARED2
Water Supply System130.00YET TO BE PREPARED
3STORM WATER DRAINAGE84.50
Yet To Be Prepared4ELECTRICITY SUPPLY SYSTEM
380.00YET TO BE PREPARED5
Sewage Treatment & Garbage Disposal90.00YET TO BE PREPARED
6STREET LIGHTING60.40
Yet To Be Prepared7SECURITY AND FIRE FIGHTING
40.00YET TO BE PREPARED8
Playgrounds And Parks90.00YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0
Yet To Be Prepared10SHOPPING AREA
0YET TO BE PREPARED11
Renewable Energy System0YET TO BE PREPARED
12SCHOOL0
Yet To Be Prepared13HOSPITAL/DISPENSARY
0YET TO BE PREPARED14
Any Other0YET TO BE PREPARED
15STP170.00
Yet To Be Prepared16UGT
120.00YET TO BE PREPARED17
Rwh40.00YET TO BE PREPARED
18ELECTRICAL SUB STATION100.00
Yet To Be Prepared5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.16-02-2023
(date)6. Date of approval of Building PlansNA
(date)7. New projects:i) Likely date of starting the construction work
01-03-2023ii) Likely date of completing the project31-03-2027
iii) Sizes of the plots to be offered in the projectSr. NoPlot Area(In Square Meter)
Number of plots in the project150.6736
1254.3453
1355.2942
1455.4688
1556.0145
1656.1108
1756.2071
1856.3034
1956.4318
11056.5281
11156.6244
11256.7207
11356.8170
11456.9454
11557.0417
11669.7447
11773.6960
11874.7050
11976.0105
12076.5924
12177.0572
12277.5220
12377.9536
12478.3852
12578.7805
12678.8500
12780.3199
12884.4467
12986.4075
13087.3155
13188.2927
13288.7458
13388.8856
13489.0400
13590.0099
13690.4402
13790.4800
73891.1845
153991.3304
14091.8866
14192.8158
14293.0559
14394.1850
14493.3586
14593.3725
14693.4675
14793.6733
14893.7950
14993.8442
15093.8791
15193.9393
15293.9820
35394.0506
15494.0849
15594.1192
25694.1842
15794.1878
15894.2564
165994.2907
16094.3250
26194.5651
16294.5750
16394.9650
16495.3875
16595.8100
16695.8377
16796.2000
16896.6225
16996.8394
17097.0450
17197.4350
17297.8250
17397.8687
17498.2475
17598.6700
17699.0600
17799.3006
27899.3672
17999.4671
18099.5337
18199.6003
18299.7002
18399.7100
158499.8001
18599.8667
18699.9333
18799.9999
188100.0998
189100.1997
190100.2663
191100.3329
192100.4328
193100.5290
294100.6472
195100.7523
196100.8678
197101.7944
198101.9139
199102.7814
1100103.1030
10101103.6142
1102104.4008
5103104.4817
1104105.3492
1105106.1820
1106107.0495
2107107.6047
1108109.9926
1109110.2825
1110111.6500
1111111.9461
1112112.0183
1113112.0905
111483.0691
1115112.1627
1116112.2349
1117112.3432
1118112.4515
1119112.5237
1120112.5959
1121115.1488
8122117.9763
1123121.4785
1124122.1652
1125122.3881
1126124.2877
2127124.7566
1128125.4745
1129125.6500
6130127.0439
1131127.8202
17132128.0515
1133128.2623
1134128.4381
1135128.4733
1136128.5765
1137128.8970
1138128.9450
1139129.1670
1140129.3890
1141129.6110
1142129.8330
1143130.0550
1144130.2770
1145130.5360
1146130.7950
1147131.0170
1148131.2390
1149131.5720
1150132.4558
1151132.9570
1152132.9988
1153133.6866
1154134.5192
1155134.8545
1156134.8545
1157135.0000
3158135.1779
1159135.3880
1160136.4378
1161137.0325
9162137.7207
1163137.8858
1164139.1800
1165139.2138
3166139.5510
1167139.8406
1168140.0154
1169140.0578
1170140.3384
1171142.3695
4172142.6575
1173144.1600
1174144.8876
4175145.4860
1176145.7852
1177146.0844
1178146.3836
1179146.5100
1180149.7346
9181101.4443
1182122.7660
1Total306
iv. Type of apartments to be constructed in the project:TypeCarpet area(In Square Meter)
Number of apartmentsNumber of towersApartment/Shops/Other Buildings
000
(vi) Quarterly schedule of development of whole/remaining part of the project:(c) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)
ParticularsExpenditureExpenditure to be made in each quarter (In Lakhs)
ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-Dec
Jan-Mar(d) InfrastructureExpenditure incurred till the date of application (In Lakhs)
ParticularsExpenditureExpenditure to be made in each quarter (In Lakhs)
ParticularsYear-2023Jan-Mar
Apr-JuneJuly-SepOct-Dec
Roads & Pavements1020
2020Water Supply System
01111
11Sewerage treatment & garbage disposal0
999
Electricity Supply System00
00Storm Water Drainage
077
7Parks and Playgrounds0
066
Clubhouse/community centres00
00Shopping area
000
0Other0
000
Stp13It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - DAccounts related information:
1. Annex copy of the balance sheet of last 3 yearsYes2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch addressHDFC BANK, CYBER CITY, GURUGRAM,HARYANABank Account number
57500001054424IFSC codeHDFC0000929
MICR code110240120Branch code
0009294. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Sanjay Aggarwal, Address: A-202, VidyutApartment, 81, Patparganj, Delhi HemlataChauhan, Address: 824/19, Gohana Road,Jagjivan ram Colony, Panipat, haryana
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)UploadedI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - E
Details of the statutory approvals:1. Annex copies of the following in Folder E:i. Lay out Plan
Yesii. Demarcation PlanYes
iii. Zoning PlanNoiv. Building Plan
NoSite PlanNo
Floor PlanNoApartment Plans
NoElevation SectionNo
Detail of Permissible FARNoDetail of covered area achieved FAR
No2. Annex copies of the following in Folder E:I. ROADS AND PAVEMENT PLAN
NoII. ELECTRICITY SUPPLY PLANNo
III. Water Supply PlanNoIV. SEWERAGE AND GARBAGE DISPOSAL PLAN
NoV. STROM WATER DRAINAGENo
Vi. 10% Land To Be Transferred To The Govt. For Community FacilityNoVII. STREET LIGHTING PLAN
NoVIII. PARKING PLANNo
3. Statutory Approvals StatusStatutory ApprovalsStatutory Approvals Status
DateI. LICENSE 108 OF 2022ALREADY BEEN OBTAINED
05-08-2022II. LICENSE 33 OF 2023ALREADY BEEN OBTAINED
16-02-2023III. LAYOUTALREADY BEEN OBTAINED
16-02-2023It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________
Seal _____________Date _____________FORM REP-I
Part - F1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)
Yes2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)
Yes3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - GProjects launched by the promoter in last five years: (No Projects)I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - HSPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:1FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
Na2WALL FINISHING DETAILS
Na3KITCHEN DETAILS
Na4BATHROOM FITTINGS
Na5WOOD WORK ETC
Na6DOORS AND WINDOS FRAMES
Na7GLASS WORK
Na8ELECTRIC FITTINGS
Na9CONDUCTING AND WIRING DETAILS
Na10CUPBOARD DETAILS
Na11WATER STORAGE
Na12LIFT DETAILS
Na13EXTERNAL GLAZINGS
Na13.1WINDOWS/GLAZINGS
Na14DOORS
Na14.1MAIN DOORS
Na14.2INTERNAL DOORS
Na15AIR CONDITIONING
Na16ELECTRICAL FITTINGS
Na17CNG PIPE LINE
Na18PROVISION OF WIFI AND BROADBAND FACILITY
Na19EXTERNAL FINISHING/COLOUR SCHEME
Na20INTERNAL FINISHING
NaSPECIFICATION UNIT WISE1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1FLOORNA
1 . 2WALLSNA
1 . 3CEILINGNA
2 . Master Bedroom/Dressroom2 . 1FLOOR
Na2 . 2WALLS
Na2 . 3CEILING
Na2 . 4MODULAR WARDROBES
Na3 . MASTER TOILET3 . 1
FloorNA3 . 2
WallsNA3 . 3
CeilingNA3 . 4
CountersNA3 . 5
Sanitary Ware/Cp FittingsNA3 . 6
Fitting/FixturesNA4 . BED ROOMS
4 . 1FLOORNA
4 . 2WALLSNA
4 . 3CEILINGNA
4 . 4WARDROBESNA
5 . Toilet5 . 1FLOOR
Na5 . 2WALLS
Na5 . 3CEILING
Na5 . 4COUNTERS
Na5 . 5SANITARY WARE/CP FITTINGS
Na5 . 6FIXTURES
Na6 . KITCHEN6 . 1
FloorNA6 . 2
WallsNA6 . 3
CeilingNA6 . 4
CountersNA6 . 5
FixturesNA6 . 6
Kitchen AppliancesNA7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1FLOORNA
7 . 2WALLS & CEILINGNA
7 . 3TOILETNA
7 . 4BALCONYNA
8 . Sit-Outs8 . 1FLOOR
Na8 . 2WALLS & CEILING
Na8 . 3RAILINGS
Na8 . 4FIXTURES
NaI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
List of Uploaded DocumentsSr. No.Document Description
Date of Document UploadView Document1
In Case Of Group Housing/ Commercial Sites, A Copy Of The Approved Site Plan25-03-2023View Document
2NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT25-03-2023
View Document3CASH FLOW STATEMENT OF THE PROPOSED PROJECT
27-03-2023View Document4
Service Plans Showing The Services On The Layout Plan29-03-2023View Document
5IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN29-03-2023
View Document6COPY OF LICENSE ALONG WITH SCHEDULE OF LAND
08-06-2023View Document7
Road Layout Plan08-06-2023View Document
8CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT08-06-2023
View Document9CA CERTIFICATE FOR COST TO BE INCURRED
08-06-2023View Document10
Demarcation Plan08-06-2023View Document
11LETTER OF APPROVAL OF DEMARCATION PLAN08-06-2023
View Document12DEMARCATION SUPERIMPOSED ON LAYOUT
08-06-2023View Document13
Documents Relating To The Entry Of License And Collaboration Agreement In The Revenue Record08-06-2023View Document
14PROJECT COST CERTIFICATE08-06-2023
View Document15DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
08-06-2023View Document16
Rera Bank Undertaking08-06-2023View Document
17SEWERAGE LAYOUT PLAN08-06-2023
View Document18STROM WATER DRAINAGE PLAN
08-06-2023View Document19
Water Supply Plan08-06-2023View Document
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________Print

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 4.6 CrYet To Be Prepared
Water Supply System₹ 1.3 CrYet To Be Prepared
Storm Water Drainage₹ 84.5 lakhYet To Be Prepared
Electricity Supply System₹ 3.8 CrYet To Be Prepared
Sewage Treatment & Garbage Disposal₹ 90 lakhYet To Be Prepared
Street Lighting₹ 60.4 lakhYet To Be Prepared
Security And Fire Fighting₹ 40 lakhYet To Be Prepared
Playgrounds And Parks₹ 90 lakhYet To Be Prepared
Stp₹ 1.7 CrYet To Be Prepared
Ugt₹ 1.2 CrYet To Be Prepared
Rwh₹ 40 lakhYet To Be Prepared
Electrical Sub Station₹ 1 CrYet To Be Prepared

Statutory approvals

ApprovalStatusDate
License 108 Of 2022Already Been Obtained5 Aug 2022
License 33 Of 2023Already Been Obtained16 Feb 2023
LayoutAlready Been Obtained16 Feb 2023

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Aanandam Ora?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.