Registration validHRERA Gurugram

Tulip Melrose

by Premium Infratech LLP · Sector 70

RERA registration
GGM/1007/739/2025/110
Registered on
7 Nov 2025
Valid till
31 Dec 2033
Project ID
RERA-GRG-2082-2025
Land area
7.5 acres
Apartments
152 in 4 towers
Completion (as filed)
31 Dec 2033
Estimated cost
₹ 1,110.06 Cr

RERA registration

Registration certificateGGM/1007/739/2025/110, dated 7 Nov 2025
Registration valid till31 Dec 2033
Project IDRERA-GRG-2082-2025
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameTulip Melrose
Site addressSector 70
SectorSector 70
Tehsil / DistrictBadshahpur St / Gurugram
Layout plan approved1 Oct 2025
Building plans approved1 Oct 2025
Construction start (as filed)1 Jan 2026
Completion (as filed)31 Dec 2033
Application submitted6 Oct 2025

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Proceedings dated: 03.11.2025.Sh. Shashank Sharma, Associate Engineer Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case.Sh. Vikas Jain (Director), Sh. Chirag Nagpal (AR), Ms. Kavya (AR) are present on behalf of promoter.The Authorized Representative of the promoter submits that presently, Fire Scheme Approval, Approved service plans and estimates and Mining Permission are under process and the said approvals have not yet been obtained as on date. Further, the AR of the promoter undertakes to obtain and submit:i.       The Fire Scheme Approval and Approved Service Plans and Estimates within 4 months from the date of grant of registration;ii.     Approved Electrification plan within 6 months from the date of grant of registration; andiii.   Mining permission before the start of construction.Further, he undertakes to submit two Demand Drafts amounting to Rs. 25 lakhs each, as a security deposit for timely compliance with the above requirements at point (i). It is also expressly undertaken that in the event of failure to obtain and submit the aforesaid approvals within the stipulated time frames, the said security amount(s) shall be liable to be forfeited by the Authority.The Authorized Representative submits that 15m road is already connected to the said project and they do not require the road access permission from the concerned department. Further, they want to change the name of project from “Tulip TOD 2” to “Tulip Melrose” to prevent any misleading marketing advertisements by market players and they also want to change the timelines of the said project from 31.12.2034 to 31.12.2033 and they will submit the revised documents accordingly in the Authority.The landowners, namely Sh. Ramniwas, Sh. Piyush Yadav, Sh. Amit Yadav and Sh. Sumit Yadav are present in person and states that the unit sharing arrangement with the promoter has been done and the same has been submitted. Further, the units will sell only upon issuance of the Occupation Certificate by the competent authority and in case, we are selling the units before occupation certificate, in that event, the amount so collected from the allottee(s) shall be deposited only in the Master Account of the said project and compliance u/s 4(2)(l)(d) of the Act of 2016 shall be follow. The Authority has taken note of the submissions made by the Authorized Representative of the promoter regarding the non-availability of the aforesaid statutory approvals as on date. In view of the above, and in the interest of regulatory compliance, the Authority hereby directs that the promoter shall submit two separate Demand Drafts, each amounting to Rs. 25,00,000/- (Rupees Twenty-Five Lakhs only), in favour of the Authority, as security amounts for timely submission of the following approvals:              a.  Fire Scheme Approval: within 4 months from the date of grant of registration; and              b.  Approved Service Plans and Estimates: within 4 months from the date of grant of registration.In the event of non-submission of any of the above approvals within the prescribed time frames, the corresponding security amount shall stand forfeited by the Authority, and such failure may also attract additional regulatory action as permissible under the Act of 2016, rules and regulations made thereunder. Further, the change of name of project from “Tulip TOD 2” to “Tulip Melrose” is allowed and the revised timeline of the project is also allowed and promoter shall submit:a.       Approved Electrification plan within 6 months from the date of grant of registration;b.       Mining permission before start of construction; andc.        Revised documents due to change of name of project and revised timelines.Approved as proposed subject to rectification of deficiencies mentioned above.The Registration Certificate shall be issued after submission of remaining deficiencies mentioned above including correction in A-H form, Online DPI and submission of two DD’s of Rs. 25 lakhs each for submission of Fire Scheme approval and approved Service plan and Estimates within the timeframe mentioned above

  1. Registration granted GGM/1007/739/2025/110
  2. Certificate uploaded RC Uploaded
  3. Registration valid till

Land, licence & cost

Land area of the project7.5 acres
Total licensed area7.5 acres
LicenceLicense No 156 of 2024 dated 17-11-2024 valid upto 16-11-2029
FAR permissible / proposed412 / 400
Estimated project cost₹ 1,110.06 Cr
Cost of land₹ 68.47 Cr
Cost of construction₹ 760.28 Cr
Infrastructure and other structures₹ 37.26 Cr
EDC, taxes, levies and other costs₹ 244.05 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments1.35418.1%
Construction Of Roads2.88338.4%
Parks And Playgrounds2.22329.6%
Vehicle Parkings0.1852.5%
Electricity Sub-Station0.0570.8%
Sewage And Solid Waste Treatment Facility0.2082.8%
Area To Be Left For Transferring To The Government For Community Services0.1081.4%
Conv Shopping0.0971.3%
Underground Water Tank0.2263%
Nursery School0.1592.1%

Apartments 152 units · 4 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings178.291,919146
Apartment/Shops/Other Buildings182.611,9666

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsMCG (DARBARIPUR ROAD, ALREADY CONSTRUCTED)Yes
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 2.25 CrYet To Be Prepared
Water Supply System₹ 75 lakhYet To Be Prepared
Storm Water Drainage₹ 75 lakhYet To Be Prepared
Sewage Treatment & Garbage Disposal₹ 75 lakhYet To Be Prepared
Street Lighting₹ 37.5 lakhYet To Be Prepared
Security And Fire Fighting₹ 6 CrYet To Be Prepared
Playgrounds And Parks₹ 3.75 CrYet To Be Prepared
Renewable Energy System₹ 5 lakhYet To Be Prepared
Any Other₹ 2.51 CrYet To Be Prepared

Statutory approvals

ApprovalStatusDate
License No. 156 Of 2024Already Been Obtained17 Nov 2024
Building Plan Approval Zp-2173/Pa(Dk)/2025/38338Already Been Obtained1 Oct 2025
Environment Clearance File No.seac/Hr/2024/271Already Been Obtained20 Feb 2025

Specifications (as filed)

Flooring Details Of Various Parts Of House) Living/Dining: Tiles /Imported Marble II)Master Bedroom/Dress Room And Bedroom :Laminated Woodenflooring III) Kitchen: Antiskid Tiles / Equivalent IV) Alltoilets: Premiumquality Tiles. V) Sit Outs/Balcony: Antiskidceramic Tiles Vi) Utility Room: Vitrified Tilesvii)Utility Toilet & Balcony: Anti Skid Ceramicfloor Tiles.
Wall Finishing Details) Living/Dining, Master Bedroom, Bedrooms:Acrylicemulsion Paint Finish II) Mastertoilet/Dress Room,Toilets: Premium Qualitytiles/Mirror III) Kitchen: 2’-0”Dado Abovecounters And Acrylic Emulsion Paint.iv)Utility Rooms/ Utility Balcony/Utilitytoilet: Oil Boundpaint Finish V) Sitouts/Balcony: Permanenttexture/Paintfinish.
Kitchen DetailsMarble/Granite Counter With Stainless Steelsink, Cpfittings And Modular Kitchen.
Bathroom FittingsI) Master Toilet/Dress Room: Sanitary Wareincludeswash Basin And Ewc Cp Fittings: Hotand Cold Waterwall And Basin Mixture Ofpremium Brands, Handshower, Healthfauset& Angle Valve.
Doors And Windos FramesHard Wood Door Frames With Moulded Skindoor /Panel Door Shutters.
Glass WorkSwitches Only (No Lights& Fixtures)
Conducting And Wiring DetailsPvc Conduit And Copper Wiring.
Water StorageUnder Ground / Over Head Tanks
Lift DetailsCapacity Of 10 / 13 Persons, Kone Orequivalent
External GlazingsEnergy Efficient Double Glass Aluminium/Upvcglazings With Fly Mesh Shutter In All Habitableareas & Aluminium / Upvc Frameswith Single Glass Inall Toilets & Utilityrooms.
Windows/GlazingsNergy Efficient Double Glass Aluminium/Upvcglazings With Fly Mesh Shutter In Allhabitableareas & Aluminium / Upvc Frameswith Single Glass Inall Toilets & Utilityrooms.
DoorsMoulded Skin Door / Panel Door Shutters.
Main DoorsMoulded Skin Door / Panel Door Shutters.
Internal DoorsPolished Moulded Skin Door/Flush Doors
Electrical FittingsSwitches Only (No Lights & Fixtures)
External Finishing/Colour SchemePaint Finishes
Internal FinishingPaint Finishes

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Tulip Melrose?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.