LapsedHRERA Gurugram

The Cityscape

by French Buildmart Private Limited · Village- Maidawas, Sector- 66, Gurugram, Haryana

RERA registration
GGM/527/259/2022/02
Registered on
24 Jan 2022
Valid till
30 Sep 2022
Project ID
RERA-GRG-745-2020
Land area
2.023 acres
Estimated cost
₹ 125.67 Cr

RERA registration

Registration certificateGGM/527/259/2022/02, dated 24 Jan 2022
Registration valid till30 Sep 2022
Project IDRERA-GRG-745-2020
AuthorityHRERA Gurugram
Project type (as filed)Ongoing
Project nameThe Cityscape
PromoterFrench Buildmart Private Limited
Promoter’s registered officeN-8, Ground Floor, Panchsheel Park, New Delhi-110017
CINU45200DL2008PTC175630
Site addressVillage- Maidawas, Sector- 66, Gurugram, Haryana
SectorSector 66
Tehsil / DistrictBadshahpur St / Gurugram
Layout plan approved11 May 2020
Building plans approved11 May 2020
Application submitted16 Sep 2020

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyHearing is fixed for 13.10.2020.
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter By hand
  1. Hearing Examination By Authority View order
    Proceedings

    The promoter requested for a period of 30 days time to remove the deficiencies. The Authority has decided to grant the same. Next date of hearing is 13.11.2020. 

  2. Hearing Adjournment View order
    Proceedings

    The hearing is adjourned and matter is fixed for 04.12.2020.

  3. Hearing Adjournment View order
    Proceedings

    The hearing is adjourned and matter is fixed for 09.12.2020.

  1. Hearing Adjournment View order
    Proceedings

    The coram is in not complete. The hearing is adjourned and matter is fixed for 23.12.2020.

  2. Hearing Adjournment View order
    Proceedings

    The hearing is adjourned and matter is fixed for 12.01.2021.

  3. Hearing Adjournment View order
    Proceedings

    The coram is not complete. The hearing is adjourned and matter is fixed for 01.02.2021.

  1. Hearing Adjournment View order
    Proceedings

    The license No. 43 of 2010 dated 08.06.2020 was issued for the development of the commercial project in the name of M/s French Buildmart Pvt. Ltd. having an area admeasuring 2.0229 acres situated in Sector 66, Gurugram. M/s Capital Skyscraper Pvt. Ltd. registered the project in its name in the Interim RERA, Panchkula vide registration No. 02 of 2018 dated 01.01.2018 having the validity till 31.12.2018. The Capital Skyscraper Pvt. Ltd. Sold the units in the projects as registered by the Authority in its name. M/s Capital Skyscraper Pvt. Ltd. was neither the license holder nor the collaborator in the project. There was no Beneficial Interest Permission in the name of M/s Capital Skyscraper Pvt. Ltd. The registration in the name of M/s Capital Skyscraper Pvt. Ltd. was irregular. As project is an ongoing project, the sales of units prior to come into force of RERA were made by M/s Capital Skyscraper Pvt. Ltd. Now there are two options either there should be Beneficial Interest Permission in the name of M/s Capital Skyscraper Pvt. Ltd. or the initial registration certificate be withdrawn and now registration shall be done in the name of license holder (M/s French Buildmart Pvt. Ltd.). The second option amounts to requirement of compliances under section 15 of the Act. There are 351 total units in the project out of which 235 were sold. M/s French Buildmart Pvt. Ltd shall step into the shoes of M/s Capital Skyscraper Pvt. Ltd. The agreements already executed between M/s Capital Skyscraper Pvt. Ltd. and allottees shall be concurred by M/s French Buildmart Pvt. Ltd. It is understood that 68 allotees have given their consent whereas requirement is of 2/3 allottees i.e. 156. Alternatively, the copy of the agreements available with the promoter be confirmed by the new promoter and photocopy be sent along with a board resolution of M/s French Buildmart Pvt. Ltd to the allottees.  The intending promoter shall be required to independently complied all the pending obligation under the provisions of this Act or rules and regulations made thereunder, and the pending obligations as per the agreement for sale entered into by the erstwhile promoter with the allottees. Since there is change of developer from M/s Capital Skyscraper Pvt. Ltd. to M/s French Buildmart Pvt. Ltd (license holder) as such a public notice be got issued so that all the buyers may come to know about the developer. Besides this the deficiencies be conveyed and a show cause notice for rejection be issued. The next date of hearing is fixed for 08.03.2021.

  2. Hearing Adjournment View order
    Proceedings

    The Coram is not complete. Hearing is adjourned and matter is fixed for 15.03.2021.

  3. Hearing Adjournment View order
    Proceedings

    Sh. BB Sahu (Director) and Ms. Hema Kashyap (Manager) are present on behalf of the promoter. The Authority directed the promoter to submit the deficit documents mentioned below within 15 days. 1.       The annexures in the online are not uploaded as well as the correction needs to be done in the online (A-H). 2.       DPI not filled Properly. 3.       Renewal of license no. 43 of 2010 needs to be submitted. 4.       Two third consent of the allottees for the revised building plan and change of promoter needs to be submitted. 5.       Draft Allotment letter is not as per the prescribed format. 6.       Draft Builder Buyer Agreement is not as per the prescribed format. 7.       Approved service estimate plan needs to be provided to check the calculation of internal development works. 8.       Quarterly schedule of estimated expenditure needs to be clarified and corrected. 9.       Quarterly schedule of sources of funds needs to be clarified and corrected. 10.   Quarterly schedule of net cash flow needs to be corrected.   The Authority also decided to issue the show cause notice. Next date of hearing is 05.04.2021.

  1. Hearing Adjournment View order
    Proceedings

    Sh. B.B Sahu (Director) and Ms. Hema Kashyap (Manager) are present on behalf of the promoter. Deficiencies have already been conveyed to the promoter. The promoter requested for some more time to submit the deficit documents. The authority has accepted the request of the promoter. The matter is to come up on 10.05.2021.

  2. Hearing Adjournment View order
    Proceedings

    Due to COVID-19 Pandemic, the matter is adjourned for 23.06.2021.

  3. Hearing Adjournment View order
    Proceedings

    Sh. Ashish Kush Planning Executive briefed the facts of the case. Ms. Hema Kashyap (Manager) is present on behalf of the promoter. The license for development of commercial project was issued in favour of M/s French Buildmart Pvt. Ltd. for an area measuring 2.0229 acres in sector-66, Gurugram. However, M/s Capital Skyscraper Pvt. Ltd. a subsidiary company of licensee applied for the RERA registration and the same was granted by the Interim RERA, Panchkula on 01.01.2018. In view of the same sale of 268 units was also made by M/s Capital Skyscraper Pvt. Ltd., who otherwise was neither licensee nor the collaborator neither the BIP Holder. However, the sale was affected in view of registration in their name by Interim RERA, Panchkula.  Now, the licensee M/s French Buildmart Pvt. Ltd. has applied for registration in their name and agreed to add an addendum to the Builder Buyer Agreement/ Allotment letter that without infringing any rights of the existing allottees the licensee will settle all the issues/ disputes on the existing and prospective allottees and will deliver the possession of units to the allottees as per the BBA. A draft of addendum of BBA shall be submitted before next date of hearing. However, a few requisite approvals/ NOC’s from various departments like storm water drainage, sewerage disposal etc. are still pending and AR assures to submit the same within 15 days. In view of same the matter is adjourned to 13.07.2021. Dr. K.K. Khandelwal (Chairman) Vijay Kumar Goyal (Member)

  1. Hearing Objection View order
    Proceedings

    Sh. Ashish Kush Planning Executive briefed the facts of the case. Ms. Hema Kashyap (Manager) and Mr. B.B. Sahu (AR) are present on behalf of the promoter. The license for development of commercial project was issued in favour of M/s French Buildmart Pvt. Ltd. for an area measuring 2.0229 acres in sector-66, Gurugram. However, M/s Capital Skyscraper Pvt. Ltd. a subsidiary company of licensee applied for the RERA registration and the same was granted by the Interim RERA, Panchkula on 01.01.2018. In view of the same sale of 268 units was also made by M/s Capital Skyscraper Pvt. Ltd., who otherwise was neither licensee nor the collaborator neither the BIP Holder. However, the sale was affected in view of registration in their name by Interim RERA, Panchkula.  Now, the licensee M/s French Buildmart Pvt. Ltd. has applied for registration in their name and agreed to add an addendum to the Builder Buyer Agreement/ Allotment letter that without infringing any rights of the existing allottees the licensee will settle all the issues/ disputes on the existing and prospective allottees and will deliver the possession of units to the allottees as per the BBA. In the last hearing the authority directed the promoter to submit the requisite approvals/ NOC’s from various departments like storm water drainage, sewerage disposal and a draft of addendum of BBA shall be submitted before next date of hearing. Reply submitted by the promoter on 12.07.2021. The promoter submitted the approvals/ NOC’s from various departments like storm water drainage, sewerage disposal. As well as the intimation to the allottees regarding the change of developer of the project with the update of construction. Online information has not been filled up by the promote despite various opportunities. This project also involves TOD benefits by the promoter and a reference regarding TOD projects has already been sent to DTCP Haryana. Meanwhile the promoter may complete the online information and other deficiencies. On the request of the promoter matter fixed for 20.07.2021.Vijay Kumar Goyal (Member)Samir Kumar (Member)Dr. K.K. Khandelwal (Chairman) 

  2. Hearing Adjournment View order
    Proceedings

    Sh. Ashish Kush, Planning Executive briefed the facts about the project. Sh. B.B. Sahu (AR) and Mrs. Hema_Kashyap (Manager) are present on behalf of the promoter. The license for development of commercial project was issued in favour of M/s French Buildmart Pvt. Ltd. for an area measuring 2.0229 acres in sector-66, Gurugram. However, M/s Capital Skyscraper Pvt. Ltd. a subsidiary company of licensee applied for the RERA registration and the same was granted by the Interim RERA, Panchkula on 01.01.2018. In view of the same sale of 268 units was also made by M/s Capital Skyscraper Pvt. Ltd., who otherwise was neither licensee nor the collaborator neither the BIP Holder. However, the sale was affected in view of registration in their name by Interim RERA, Panchkula.  Now, the licensee M/s French Buildmart Pvt. Ltd. has applied for registration in their name and agreed to add an addendum to the Builder Buyer Agreement/ Allotment letter that without infringing any rights of the existing allottees the licensee will settle all the issues/ disputes on the existing and prospective allottees and will deliver the possession of units to the allottees as per the BBA. In the last hearing the authority directed the promoter to submit the requisite approvals/ NOC’s from various departments like storm water drainage, sewerage disposal and a draft of addendum of BBA shall be submitted before next date of hearing. Reply submitted by the promoter on 12.07.2021. The promoter submitted the approvals/ NOC’s from various departments like storm water drainage, sewerage disposal. As well as the intimation to the allottees regarding the change of developer of the project with the update of construction. Online information has not been filled up by the promoter despite various opportunities. This project also involves TOD benefits by the promoter and a reference regarding TOD projects has already been sent to DTCP Haryana. Meanwhile the promoter may complete the online information and other deficiencies. On the request of the promoter matter fixed for 20.07.2021. The matter to come up on 27.07.2021.Vijay Kumar Goyal (Member)Dr. K.K. Khandelwal (Chairman) 

  3. Hearing Adjournment View order
    Proceedings

    Sh. Ashish Kush, Planning Executive briefed the facts about the project. Sh. B.B.Sahu (Manager) and Sh. Parmod Sharma (Executive) are present on behalf of the promoter. The license for development of commercial project was issued in favour of M/s French Buildmart Pvt. Ltd. for an area measuring 2.0229 acres in sector-66, Gurugram. However, M/s Capital Skyscraper Pvt. Ltd. a subsidiary company of licensee applied for the RERA registration and the same was granted by the Interim RERA, Panchkula on 01.01.2018. In view of the same sale of 268 units was also made by M/s Capital Skyscraper Pvt. Ltd., who otherwise was neither licensee nor the collaborator neither the BIP Holder. However, the sale was affected in view of registration in their name by Interim RERA, Panchkula.  Now, the licensee M/s French Buildmart Pvt. Ltd. has applied for    in their name and agreed to add an addendum to the Builder Buyer Agreement/ Allotment letter that without infringing any rights of the existing allottees the licensee will settle all the issues/ disputes on the existing and prospective allottees and will deliver the possession of units to the allottees as per the BBA. On 23.06.2021, the authority directed the promoter to submit the requisite approvals/ NOC’s from various departments like storm water drainage, sewerage disposal and a draft of addendum of BBA shall be submitted before next date of hearing i.e 13.07.2021. Reply submitted by the promoter on 12.07.2021. The promoter submitted the approvals/ NOC’s from various departments like storm water drainage, sewerage disposal. As well as the intimation to the allottees regarding the change of developer of the project with the update of construction. Online information has not been filled up by the promoter despite various opportunities. This project also involves TOD benefits by the promoter and a reference regarding TOD projects has already been sent to DTCP Haryana. Meanwhile the promoter may complete the online information and other deficiencies. On the request of the promoter matter is fixed for 20.07.2021. On 20.07.2021, the matter was adjourned for 27.07.2021. The matter was discussed in detail. In view of the back-drop/history of the project namely the ‘’Cityscape’ the below noted facts have been observed: i.                    That earlier the project was got registered in the name of M/s Capital Skyscraper, an independent company which has no legal entity in the capacity of either a licensee or promoter as no license was issued in its name. The Panchkula Authority granted registration certificate dated 01.01.2018 vide No. 02 of 2018. Overlooking the above material fact. ii.                  The registration was granted for a period upto 31.12.2018, which has expired since then. A period of more than 1 year 9 months has elapsed and registration has already expired. iii.                Now, the original license holder French Buildmart Pvt. Ltd. through its AR Sh. Bhim Bahadur Sahu resident of D-275, Krishna Park, Khanpur, New Delhi (Aadhaar Card attached) has applied for amendment in registration of the project after a lapse of more than 1 year 9 months in the name of new company i.e. M/s French Buildmart Pvt. Ltd. iv.                The promoter submitted an undertaking stating that the M/s French Buildmart Pvt. Ltd. will be liable for settle all issues / disputes, if any, of the existing and prospective customers/ allottees and pay all outstanding dues to the government authorities as and when demanded.  Taking into consideration the registration granted earlier vide registration no. 02 of 2018 dated 01.01.2018 for the commercial project admeasuring 2.0229 acres in favour of M/s Capital Skyscraper Pvt. Ltd. stands cancelled and now the authority has decided to fix the matter for 20.12.2021.

  1. Hearing Adjournment View order
    Proceedings

    Sh. Ashish Kush, briefed about the facts of the case. Ms. Hema Kashyap (Manager) and Sh. B.B. Sahu (Manager) are present on behalf of the promoter. The promoter submitted that they will produce written consent of 2/3 allottees who have been allotted units prior to amendment of building plans on account of TOD after coming of RERA. The matter to come up on 10.01.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)

  2. Hearing Adjournment View order
    Proceedings

    Sh. Ashish Kush, briefed about the facts of the case. Ms. Hema Kashyap (Manager) and Sh. B.B. Sahu (Manager) are present on behalf of the promoter. The promoter stated that they have obtained the consent of another 40 allottees in addition to the consent of 119 allottees submitted earlier. The authority directed the promoter to submit the corrected online DPI and an affidavit giving details of allottees and details of those allottees who have given their consent regarding the sale of the project. The matter to come up on 17.01.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)

  3. Hearing Adjournment View order
    Proceedings

    The matter is Adjourned to 19.01.2022.

  1. Hearing Adjournment View order
    Proceedings

    Proceedings dated: 19.01.2022 Sh. Ashish Kush, briefed about the facts of the case. Sh. B.B. Sahu joined the proceedings through VC on behalf of the promoter. It was informed that requisite affidavit and balance written consent of 2/3rd allottees have been submitted today at the registry. Office to examine and may put up on 24.01.2022. The matter to come up on 24.01.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) 

  2. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Sh. Ashish Kush, briefed about the facts of the case. Sh. B.B. Sahu joined the proceedings through VC on behalf of the promoter. The project pertains to the TOD. The building plans of the project was firstly approved vide Memo no. ZP-661/JD(BS)/2013/33412 dated 13.03.2013. On the basis of TOD, the revision of building plans was approved vide ZP-661/JD(RD)/2020/7824 dated 11.05.2020. The cases pertain to TOD are subject to the clarification of the DTCP, Haryana. However, the above project is to be registered as a whole not in the phase. As well as the promoter submitted the consent of 2/3rd of the allottees. The total no. of units in the project are 351. The total no. of units sold are 270 out of which the individual identity is 227. However, the promoter submitted the consent from 181 allottees after examining the consent of allottees it was found that the no. of consent is 155 as per the individual identity. The 2/3rd consent is 151 as the sold units as per individual identity is 227. The promoter submitted the consent of more than 2/3rd allottees as per the requirement. Some of the information in respect of sold units needs to be updated as explained to the ARs during proceedings. Rest information is complete. The Authority decided to grant registration. Three set of hard copies for authentication be submitted by the promoter within three days.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) 

  3. Registration granted GGM/527/259/2022/02
  1. Certificate uploaded RC Approved and Certificate Uploaded
  2. Registration valid till

Land, licence & cost

Land area of the project2.023 acres
Total licensed area2.023 acres
Licence43 of 2010 dated 08-06-2010
FAR permissible / proposed3.5 / 3.5
Estimated project cost₹ 125.67 Cr
Cost of land₹ 17.29 Cr
Cost of construction₹ 60.65 Cr
Infrastructure and other structures₹ 8.34 Cr
EDC, taxes, levies and other costs₹ 39.39 Cr

How the land will be used

UseAcresShare
Construction Of Roads0.613630.3%
Parks And Playgrounds0.0834.1%
Electricity Sub-Station0.0140.7%
Area1.21360%
Open0.08534.2%
Solid0.0110.5%
Rain0.0030.1%

External services

ServiceProvided byApproval taken
RoadsHSVP/GMDANo
Water SupplyHSVP/GMDAYes
ElectricityDHBVNYes
Sewage DisposalHSVP/GMDAYes
Storm Water DrainageHSVP/GMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 65.62 lakhSubmitted To Town & Country Planning
Water Supply System₹ 1.2 CrSubmitted To Town & Country Planning
Storm Water Drainage₹ 43.4 lakhSubmitted To Town & Country Planning
Electricity Supply System₹ 47.9 lakhSubmitted To Town & Country Planning
Sewage Treatment & Garbage Disposal₹ 39.25 lakhSubmitted To Town & Country Planning
Street Lighting₹ 7.76 lakhSubmitted To Town & Country Planning
Security And Fire Fighting₹ 2.5 CrSubmitted To Town & Country Planning
Stp₹ 30 lakhSubmitted To Town & Country Planning
Underground Water Tank₹ 20.35 lakhSubmitted To Town & Country Planning
Rain Water Harvesting₹ 6 lakhSubmitted To Town & Country Planning
Electrical Sub Station₹ 1.2 CrSubmitted To Town & Country Planning
Horticulture₹ 2.87 lakhSubmitted To Town & Country Planning
Parking₹ 80.68 lakhSubmitted To Town & Country Planning

Statutory approvals

ApprovalStatusDate
LicecneAlready Been Obtained8 Jun 2010
Building PlanAlready Been Obtained11 May 2020
ZoningAlready Been Obtained6 Feb 2019
Environment ClearanceAlready Been Obtained3 Sep 2020
Height NocAlready Been Obtained25 May 2018
ForestAlready Been Obtained3 Jul 2010
ZoningAlready Been Obtained6 Feb 2019
Service EstimatesAlready Been Obtained6 Feb 2020

Specifications (as filed)

Flooring Details Of Various Parts Of HouseTile/Carpet
Wall Finishing DetailsPaint
Bathroom FittingsRoca/Parryware
Doors And Windos FramesGlass/Flush Doors
Glass WorkSgu/Dgu
Electric FittingsGreatwhite/Anchor
Conducting And Wiring DetailsBec/Kalinga/Polycab
Water StorageUnderground/Overhead Tanks
Lift Details8 Passenger+2 Service Lifts
External GlazingsSgu/Dgu
Windows/GlazingsSgu/Dgu
DoorsSolid Flush Door/Glass Door/Fire Rated Doors In Staircase As Per Norms
Main DoorsMs
Internal DoorsGlass/Solid Wooden Flush Doors
Air ConditioningChiller Based
Electrical FittingsAnchor/Greatewhite
External Finishing/Colour SchemeGlass/Paint
Internal FinishingDry/Wet Walls

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about The Cityscape?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.