by Signatureglobal Developers Pvt. Ltd. · Village Gaduli Kalan, Sector-37D, Gurugram
- RERA registration
- GGM/462/194/2021/30
- Registered on
- 13 Jul 2021
- Valid till
- 28 Apr 2025
- Project ID
- RERA-GRG-863-2021
- Land area
- 20.589 acres
- Plots
- 324
- Completion (as filed)
- 30 Apr 2023
- Estimated cost
- ₹ 197.11 Cr
RERA registration
| Registration certificate | GGM/462/194/2021/30, dated 13 Jul 2021 |
|---|---|
| Registration valid till | 28 Apr 2025 |
| Project ID | RERA-GRG-863-2021 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Signature Global City 37D |
| Promoter | Signatureglobal Developers Pvt. Ltd. |
| Promoter’s registered office | 1308, 13TH Floor , Dr.gopal Das Bhawan, 28 Barakhambha Road, New Delhi-110001 |
| CIN | U70109DL2012PTC241901 |
| Site address | Village Gaduli Kalan, Sector-37D, Gurugram |
| Sector | Sector 37D |
| Tehsil / District | Kadipur St / Gurugram |
| Layout plan approved | 5 Mar 2021 |
| Construction start (as filed) | 1 May 2021 |
| Completion (as filed) | 30 Apr 2023 |
| Application submitted | 3 Jun 2021 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
- Notice sent to the promoter By Hand
-
Hearing
Examination By Authority
Proceedings
Proceedings dated: 06.07.2021 Sh. Gajender Bhatti, Planning Executive briefed the facts about the project. Sh. Anurag Srivastava is present on behalf of the promoter. The promoter M/s Signature Global Developers Pvt Ltd applied for registration certificate of real estate project namely “Signature Global City – 37D” for the area admeasuring 20.589 Acres located in Village Gadauli Sector-37D, Gurugram., under section 4 of the Real Estate (Regulation and Development) Act, 2016 vide central receipt no. 10301/19620 dated 11.06.2021 and RPIN-338. The Temp I.D. of REP-I (Part A-H) is RERA-GRG-Proj-863-2021, the application by the promoter was scrutinized and deficiency notice indicating deficiencies was conveyed vide notice no. HARERA/GGM/RPIN/338 dated 30.06.2021. The Department of Town and Country Planning, Haryana has granted the license to develop an affordable plotted colony under DDJAY scheme of 2016 for the area admeasuring 20.589 acres vide license no. 08 of 2021 dated 05.03.2021 to M/s Lalwani Brothers Buildcon LLP., M/s Unistay Hospitality Pvt. Ltd., in collaboration with M/s Signature Global Developers Pvt. Ltd. M/s Signature Global Developers Pvt. Ltd. is acting as promoter and collaborator in the case vide collaboration agreement no. G0F2019L1471 and G0F2019L1666 with M/s Lalwani Brothers Buildcon LLP and M/s Unistay Hospitality Pvt. Ltd. respectively dated 06.12.2019. The project comprises of 324 plots out of which 166 plots are frozen and 158 plots are unfrozen. Some of the major deficiencies in the project are the approved copy of service plans and estimates needs to be provided, PERT chart indicating the progress of the project is not submitted, CA certificate for the equity infused by the promoter needs to be provided. Form CHG-1 & CHG-9 along with loan sanction letter and loan agreement deed needs to be provided for the loans of ₹ 38 crore, 40 crore, 250 crore and 72 crores. The loans are against the company and as per the statement of AR of the promoter that the land of the project is encumbrance free and only accruals from the project left out after transferring 70% amount collected from the allottee in the separate RERA account are hypothecated for which an affidavit shall be submitted. The non-encumbrance certificate also to be submitted. The matter to come up on 07.07.2021
-
Hearing
Objection
Proceedings
Sh. Gajender Bhatti, Associate Planning Executive Briefed the facts of the project. Sh. Anurag Shrivastav was present on behalf of the promoter. The promoter is directed to remove the deficiencies and fill the online DPI for the project and the matter is fixed for 13.07.2021.Member (V.K. Goyal)Member (Sameer Kumar)Chairman (K.K. Khandelwal)
-
Hearing
Approved And Ready For Certificate Issuing Process
Proceedings
Ms. Prachi Singh, Planning Executive briefed the facts about the project. Sh. Anurag Srivastava is present on behalf of the promoter. The promoter M/s Signature Global Developers Pvt Ltd applied for registration certificate of real estate project namely “Signature Global City – 37D” for the area admeasuring 20.589 Acres located in Village Gadauli Sector-37D, Gurugram., under section 4 of the Real Estate (Regulation and Development) Act, 2016 vide central receipt no. 10301/19620 dated 11.06.2021 and RPIN-338. The Temp I.D. of REP-I (Part A-H) is RERA-GRG- Proj-863-2021, the application by the promoter was scrutinized and deficiency notice indicating major and minor deficiencies was conveyed vide notice no. HARERA/GGM/RPIN/338 dated 30.06.2021. The Department of Town and Country Planning, Haryana has granted the license to develop an affordable plotted colony under DDJAY scheme of 2016 for the area admeasuring 20.589 acres vide license no. 08 of 2021 dated 05.03.2021 to M/s Lalwani Brothers Buildcon LLP., M/s Unistay Hospitality Pvt. Ltd., in collaboration with M/s Signature Global Developers Pvt. Ltd. M/s Signature Global Developers Pvt. Ltd. is acting as promoter and collaborator in the case vide collaboration agreement no. G0F2019L1471 and G0F2019L1666 with M/s Lalwani Brothers Buildcon LLP and M/s Unistay Hospitality Pvt. Ltd. respectively dated 06.12.2019. The project comprises of 324 plots out of which 166 plots are frozen and 158 plots are unfrozen. Status on 12.07.2021- All Deficiencies are removed as on date except copy approved service plans and estimates as the same are approved from executive engineer HSVP, division-01, Gurugram dated 24.03.2021 is submitted however, final approval is still pending, and PERT Chart needs to be submitted (details of IDW needs to be mentioned in the PERT chart). The Authority decided to grant registration for the project. The promoter is advised to submit detailed project information duly binded and also fill up online DPI information at hrera.in/app1/sign_up. within 7 days.Member (V.K. Goyal)Member (Sameer Kumar)Chairman (K.K. Khandelwal)
- Registration granted GGM/462/194/2021/30
- Registration valid till
Land, licence & cost
| Land area of the project | 20.589 acres |
|---|---|
| Total licensed area | 20.589 acres |
| Licence | 08 of 2021 Dated 05/03/2021 Endst. No. LC-4242 4245/JE(SJ)/2020/5863 Dated 08/03/2021 |
| FAR permissible / proposed | 1 / 1 |
| Estimated project cost | ₹ 197.11 Cr |
| Cost of land | ₹ 99.58 Cr |
| Infrastructure and other structures | ₹ 12.78 Cr |
| EDC, taxes, levies and other costs | ₹ 84.74 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Plots To Be Sold | 10.066 | 48.9% |
| Construction Of Roads | 5.75 | 27.9% |
| Green Belts | 1.576 | 7.7% |
| Electricity Sub-Station | 0.148 | 0.7% |
| Sewage And Solid Waste Treatment Facility | 0.163 | 0.8% |
| Area To Be Left For Transferring To The Government For Community Services | 2.061 | 10% |
| Area | 0.824 | 4% |
Plots 324 plots
| Plot size (sq m) | Sq yd | Sq ft | Plots |
|---|---|---|---|
| 81.20 | 97 | 874 | 1 |
| 91.75 | 110 | 988 | 1 |
| 92.29 | 110 | 993 | 1 |
| 92.57 | 111 | 996 | 1 |
| 92.63 | 111 | 997 | 1 |
| 93.85 | 112 | 1,010 | 1 |
| 94.40 | 113 | 1,016 | 1 |
| 95.38 | 114 | 1,027 | 1 |
| 95.81 | 115 | 1,031 | 1 |
| 96.33 | 115 | 1,037 | 1 |
| 97.57 | 117 | 1,050 | 1 |
| 97.99 | 117 | 1,055 | 1 |
| 99.60 | 119 | 1,072 | 1 |
| 100.50 | 120 | 1,082 | 11 |
| 100.50 | 120 | 1,082 | 4 |
| 100.50 | 120 | 1,082 | 36 |
| 100.50 | 120 | 1,082 | 10 |
| 100.50 | 120 | 1,082 | 4 |
| 100.50 | 120 | 1,082 | 27 |
| 120.71 | 144 | 1,299 | 1 |
| 124.04 | 148 | 1,335 | 1 |
| 134.00 | 160 | 1,442 | 36 |
| 134.00 | 160 | 1,442 | 25 |
| 134.00 | 160 | 1,442 | 22 |
| 134.00 | 160 | 1,442 | 12 |
| 134.00 | 160 | 1,442 | 11 |
| 134.00 | 160 | 1,442 | 37 |
| 134.00 | 160 | 1,442 | 14 |
| 140.35 | 168 | 1,511 | 1 |
| 149.93 | 179 | 1,614 | 25 |
| 149.93 | 179 | 1,614 | 12 |
| 149.93 | 179 | 1,614 | 15 |
| 149.93 | 179 | 1,614 | 7 |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | NHAI | No |
| Water Supply | GMDA | Yes |
| Electricity | DHBVN | Yes |
| Sewage Disposal | GMDA | Yes |
| Storm Water Drainage | No | STP |
| GMDA | Yes | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: |
| Sr. No. | Name of the facility | Estimated cost (In Lakhs)(Within the project area only) |
| Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) | 1 | INTERNAL ROADS AND PAVEMENTS |
| 317.82 | SUBMITTED TO HUDA | 2 |
| Water Supply System | 223.01 | SUBMITTED TO HUDA |
| 3 | STORM WATER DRAINAGE | 97.26 |
| Submitted To HUDA | 4 | ELECTRICITY SUPPLY SYSTEM |
| 0 | YET TO BE PREPARED | 5 |
| Sewage Treatment & Garbage Disposal | 194.03 | SUBMITTED TO HUDA |
| 6 | STREET LIGHTING | 31.60 |
| Submitted To HUDA | 7 | SECURITY AND FIRE FIGHTING |
| 0 | YET TO BE PREPARED | 8 |
| Playgrounds And Parks | 0 | YET TO BE PREPARED |
| 9 | CLUB HOUSE/COMMUNITY CENTRE | 0 |
| Yet To Be Prepared | 10 | SHOPPING AREA |
| 0 | YET TO BE PREPARED | 11 |
| Renewable Energy System | 0 | YET TO BE PREPARED |
| 12 | SCHOOL | 0 |
| Yet To Be Prepared | 13 | HOSPITAL/DISPENSARY |
| 0 | YET TO BE PREPARED | 14 |
| Any Other | 0 | YET TO BE PREPARED |
| 15 | PARKING AND HORTICULTURE | 6.62 |
| Submitted To HUDA | 16 | MAINTENANCE OF SERVICES |
| 407.69 | SUBMITTED TO HUDA | 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. |
| 05-03-2021 | (date) | 6. Date of approval of Building Plans |
| Na | (date) | 7. New projects: |
| i) Likely date of starting the construction work | 01-05-2021 | ii) Likely date of completing the project |
| 30-04-2023 | iii) Sizes of the plots to be offered in the project | Sr. No |
| Plot Area(In Square Meter) | Number of plots in the project | 1 |
| 149.93 | 25 | 2 |
| 149.93 | 12 | 3 |
| 149.93 | 15 | 4 |
| 149.93 | 7 | 5 |
| 134 | 36 | 6 |
| 134 | 25 | 7 |
| 134 | 22 | 8 |
| 134 | 12 | 9 |
| 134 | 11 | 10 |
| 134 | 37 | 11 |
| 134 | 14 | 12 |
| 100.50 | 11 | 13 |
| 100.50 | 4 | 14 |
| 100.50 | 36 | 15 |
| 100.50 | 10 | 16 |
| 100.50 | 4 | 17 |
| 100.50 | 27 | 18 |
| 81.20 | 1 | 19 |
| 92.29 | 1 | 20 |
| 94.40 | 1 | 21 |
| 95.81 | 1 | 22 |
| 97.99 | 1 | 23 |
| 99.60 | 1 | 24 |
| 140.35 | 1 | 25 |
| 124.04 | 1 | 26 |
| 120.71 | 1 | 27 |
| 92.57 | 1 | 28 |
| 97.57 | 1 | 29 |
| 96.33 | 1 | 30 |
| 95.38 | 1 | 31 |
| 93.85 | 1 | 32 |
| 92.63 | 1 | 33 |
| 91.75 | 1 | Total |
| 324 | iv. Type of apartments to be constructed in the project: | Type |
| Carpet area(In Square Meter) | Number of apartments | Number of towers |
| Apartment/Shops/Other Buildings | 0 | 0 |
| 0 | (vi) Quarterly schedule of development of whole/remaining part of the project: | (c) Apartments/Shops/Other Buildings |
| Expenditure incurred till the date of application (In Lakhs) | Particulars | Expenditure |
| Apartments | 0 | Shops |
| 0 | Plots | 0 |
| External Development Charges | 600 | Land Cost Expenditure |
| 2817.80 | Others Cost | 95.76 |
| Expenditure to be made in each quarter (In Lakhs) | Particulars | Year-2021 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Apartments | 0 |
| 0 | 0 | Shops |
| 0 | 0 | 0 |
| Plots | 0 | 0 |
| 0 | Land Cost Expenditure | 703.70 |
| 650.07 | 685.24 | Internal Development Works |
| 112.29 | 289.20 | 323.30 |
| Others Cost | 545 | 545 |
| 520 | External Development Charges | 408.10 |
| Particulars | Year-2022 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 0 | 0 |
| 0 | 0 | Shops |
| 0 | 0 | 0 |
| 0 | Plots | 0 |
| 0 | 0 | 0 |
| Internal Development Works | 145.55 | 407.69 |
| 250 | 250 | Land Cost Expenditure |
| 818.41 | 699.98 | 803.83 |
| 703.17 | Others Cost | 520 |
| 520 | 400 | 330 |
| External Development Charges | 390.10 | 372.10 |
| Particulars | Year-2023 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 0 | 0 |
| 0 | 0 | Shops |
| 0 | 0 | 0 |
| 0 | Plots | 0 |
| 0 | 0 | 0 |
| Others Cost | 360 | 290 |
| 320 | 0 | Internal Development Works |
| 250 | 250 | 250 |
| 0 | Land Cost Expenditure | 718.02 |
| 667.85 | 690.40 | 0 |
| External Development Charges | 354.10 | 336.10 |
| Particulars | Year-2024 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 0 | Shops |
| 0 | Plots | 0 |
| External Development Charges | 318.10 | (d) Infrastructure |
| Expenditure incurred till the date of application (In Lakhs) | Particulars | Expenditure |
| Roads & Pavements | 0 | Water Supply System |
| 0 | Sewerage treatment & garbage disposal | 0 |
| Electricity Supply System | 0 | Storm Water Drainage |
| 0 | Parks and Playgrounds | 0 |
| Clubhouse/community centres | 0 | Shopping area |
| 0 | Other | 0 |
| Expenditure to be made in each quarter (In Lakhs) | Particulars | Year-2021 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 38.49 |
| 100.56 | 117.94 | Water Supply System |
| 27.01 | 70.56 | 82.76 |
| Sewerage treatment & garbage disposal | 23.50 | 61.39 |
| 72 | Electricity Supply System | 0 |
| 0 | 0 | Storm Water Drainage |
| 16.72 | 40.70 | 36.33 |
| Parks and Playgrounds | 0 | 0 |
| 0 | Clubhouse/community centres | 0 |
| 0 | 0 | Shopping area |
| 0 | 0 | 0 |
| Other | 0 | 0 |
| 0 | Parking Horticulture | 1.14 |
| 2.77 | 2.47 | Street Light |
| 5.43 | 13.22 | 11.80 |
| Particulars | Year-2022 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Roads & Pavements | 60.83 | Water Supply System |
| 42.69 | Sewerage treatment & garbage disposal | 37.14 |
| Electricity Supply System | 0 | Storm Water Drainage |
| 3.51 | Parks and Playgrounds | 0 |
| Clubhouse/community centres | 0 | Shopping area |
| 0 | Other | 0 |
| Parking Horticulture | 0.24 | Street Light |
| 1.14 | It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - D | Accounts related information: | 1. Annex copy of the balance sheet of last 3 years |
| Yes | 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. | Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form. |
| No | 3. Bank account to which the deposits received from apartment buyers will be credited | Bank and Branch address |
| Indusind Bank Limited, Dr. Gopal Das Bhawan, 28, Barakhamba Road, New Delhi-110001 | Bank Account number | 250025003701 |
| IFSC code | INDB0000005 | MICR code |
| 110234002 | Branch code | 000005 |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 3.18 Cr | Submitted To HUDA |
| Water Supply System | ₹ 2.23 Cr | Submitted To HUDA |
| Storm Water Drainage | ₹ 97.26 lakh | Submitted To HUDA |
| Sewage Treatment & Garbage Disposal | ₹ 1.94 Cr | Submitted To HUDA |
| Street Lighting | ₹ 31.6 lakh | Submitted To HUDA |
| Parking And Horticulture | ₹ 6.62 lakh | Submitted To HUDA |
| Maintenance Of Services | ₹ 4.08 Cr | Submitted To HUDA |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| License 08 Of 2021 | Already Been Obtained | 5 Mar 2021 |
| Layout Plan Memo No. Dtcp | Already Been Obtained | 5 Mar 2021 |
| Water Supply GMDA/Sew/2021/194 | Already Been Obtained | 8 Apr 2021 |
| Sewage Disposal GMDA/Sew/2021/381 | Already Been Obtained | 24 Mar 2021 |
| Stp Treated Water GMDA/Sew/2021/387 | Already Been Obtained | 24 Mar 2021 |
| Electrical Load Availability CH.131/Drg-Plc | Already Been Obtained | 31 Mar 2021 |
| Forest Noc R6U-3PQ-Rhqh | Already Been Obtained | 22 Sep 2020 |
| Zoning Plan Drg.no-DTCP7782 | Already Been Obtained | 2 Jun 2021 |
| Zoning Plan Commercial Drg.no-DTCP7783 | Already Been Obtained | 2 Jun 2021 |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.




Questions about Signature Global City 37D?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.