Registration validHRERA Gurugram

Rama Homes

by Kiwi Land And Housing Pvt. Ltd. · Village Hayatpur Sector 89

RERA registration
GGM/542/274/2022/17
Registered on
21 Feb 2022
Valid till
11 Aug 2027
Project ID
RERA-GRG-970-2021
Land area
5.156 acres
Apartments
716 in 3 towers
Completion (as filed)
31 Aug 2026
Estimated cost
₹ 188.64 Cr

RERA registration

Registration certificateGGM/542/274/2022/17, dated 21 Feb 2022
Registration valid till11 Aug 2027
Project IDRERA-GRG-970-2021
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameRama Homes
PromoterKiwi Land And Housing Pvt. Ltd.
Promoter’s registered officeC-114, Ist Floor, Fateh Nagar, Jail Road, New Delhi-110018
CINU45200DL2008PTC176183
Site addressVillage Hayatpur Sector 89
SectorSector 89
Tehsil / DistrictHarsaru St / Gurugram
Layout plan approved30 Dec 2021
Building plans approved30 Dec 2021
Construction start (as filed)1 Apr 2022
Completion (as filed)31 Aug 2026
Application submitted6 Jan 2022

Authority, hearings & orders

Current statusExtension Certificate Uploaded
Initial scrutinyfirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter notice handed over to AR by hand
  1. Hearing Examination By Authority
    Proceedings

    Proceedings dated 31.01.2022 Ms. Neeraj Gautam, Architectural Executive briefed the facts about the project through video conferencing. Corrections in the online DPI are still pending. The approvals of fire scheme, service plans and estimates, environmental clearance, airport height clearance, tree cutting permission, power line shifting NOC and HUDA construction water NOC are applied in the respective departments and the final approvals are still awaited. By the order of the authority, the promoter is directed to attend the deficiencies before the next date of hearing. The matter to come up on 07.02.2022

  2. Hearing Adjournment
    Proceedings

    Proceedings dated 07.02.2022 Ms. Neeraj Gautam, Architectural Executive briefed the facts about the project. Sh. Virender Verma (Director) and Sh. Parveen Kumar (AR) are present on behalf of the promoter. The approvals of fire scheme, service plans and estimates, environmental clearance, airport height clearance, tree cutting permission, power line shifting NOC and HUDA construction water NOC are applied in the respective departments and the final approvals are still awaited. The promoter is directed to submit the hard copy of the corrected online DPI along with other deficit documents in the authority before the next date of hearing. The matter to come up on 14.02.2022

  3. Hearing Adjournment View order
    Proceedings

    Ms Neeraj gautam, Architectural Executive briefed the facts about the project.Sh. Praveen Kumar (AR) is present on behalf of the promoter. The promoter is directed to submit the deficit documents in the authority before the next date of hearing.The matter to come up on 21.02.2022.

  1. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Proceedings dated 21.02.2022 Ms. Neeraj Gautam, Architectural Executive briefed the facts about the project. Sh. Virender Verma (Director) and Parveen Kumar (AR) are present on behalf of the promoter. The promoter has submitted the hard copy of the corrected online DPI in the authority today. The promoter has applied for the approvals of fire scheme, service plans and estimates, tree cutting permission, power line shifting NOC, and environmental clearance in the concerned departments, and the final approvals are still awaited. The authority has decided to grant registration to the promoter subject to the submission of tree cutting permission and power line shifting NOC within two months from the date of grant of registration and environmental clearance, approved fire scheme and approved service plans and estimates within three months from the date of grant of registration. The promoter shall submit a bank guarantee of Rs 10 lakhs on account of the approved fire scheme and Rs. 10 lakhs on account of approved service plans and estimates within seven days from the date of grant of registration. This bank guarantee shall be forfeited in case the approved fire scheme and approved service plans and estimates are not submitted in the authority within three months from the date of grant of registration. 

  2. Registration granted GGM/542/274/2022/17
  3. Registration valid till

Land, licence & cost

Land area of the project5.156 acres
Total licensed area5.156 acres
LicenceLicense no. 49 of 2021 Dt. 12.08.2021 Endst. No. LC-4172/Asstt.(MS)-2021/19768 dated 13.08.2021
FAR permissible / proposed225 / 225
Estimated project cost₹ 188.64 Cr
Cost of land₹ 45.36 Cr
Cost of construction₹ 85.38 Cr
Infrastructure and other structures₹ 12.79 Cr
EDC, taxes, levies and other costs₹ 46.11 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments0.60111.7%
Construction Of Roads1.276424.8%
Pavements0.3196.2%
Parks And Playgrounds0.914617.7%
Green Belts0.22864.4%
Vehicle Parkings0.541910.5%
Electricity Sub-Station0.10382%
Rwh0.01350.3%
Ramp0.04740.9%
Sector0.727514.1%
Anganwadi0.04590.9%
Solid0.01980.4%
Commercial0.31696.1%

Apartments 716 units · 3 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings59.89645276
Apartment/Shops/Other Buildings60.00646270
Apartment/Shops/Other Buildings59.8964524
Apartment/Shops/Other Buildings60.0064612
Apartment/Shops/Other Buildings34.9237668
Apartment/Shops/Other Buildings35.5438366

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
Vide Memo No. Ee(Proj)/GMDA/2021/823 Dt. 15.12.2021YesELECTRICITY
AppliedYesSEWAGE DISPOSAL
Vide Memo No. GMDA/Sew/2021/1510 Dt. 15.12.2021YesSTORM WATER DRAINAGE
Vide Memo No. GMDA/Drainage/2021/1670 Dt. 15.12.2021YesFOREST NOC
Obtained Vide Srn No. XF8-Nra-Pkal Dt. 10.05.2021Yes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)1INTERNAL ROADS AND PAVEMENTS
128.53YET TO BE PREPARED2
Water Supply System61.73YET TO BE PREPARED
3STORM WATER DRAINAGE77.42
Yet To Be Prepared4ELECTRICITY SUPPLY SYSTEM
0YET TO BE PREPARED5
Sewage Treatment & Garbage Disposal163.96YET TO BE PREPARED
6STREET LIGHTING19.18
Yet To Be Prepared7SECURITY AND FIRE FIGHTING
63.90YET TO BE PREPARED8
Playgrounds And Parks7.22YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE80.78
Yet To Be Prepared10SHOPPING AREA
0YET TO BE PREPARED11
Renewable Energy System0YET TO BE PREPARED
12SCHOOL0
Yet To Be Prepared13HOSPITAL/DISPENSARY
0YET TO BE PREPARED14
Any Other113.36YET TO BE PREPARED
15PARKING17.51
Yet To Be Prepared16STP
27.62YET TO BE PREPARED17
Underground Water Tank57.09YET TO BE PREPARED
18RAIN WATER HARVESTING4.61
Yet To Be Prepared19ELECTRICAL SUB STATION
30.00YET TO BE PREPARED20
Construction Of Circulation Road3.67YET TO BE PREPARED
21MAINTENANCE OF SERVICES FOR TEN YEARS INCLUDING RESURFACING OF ROADS AFTER FIVE YEARS TEN YEARS OF MAINTENANCE222.63
Yet To Be Prepared5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.30-12-2021
(date)6. Date of approval of Building Plans30-12-2021
(date)7. New projects:i) Likely date of starting the construction work
01-04-2022ii) Likely date of completing the project31-08-2026
iii) Sizes of the plots to be offered in the projectSr. NoPlot Area(In Square Meter)
Number of plots in the project10
0Total0
iv. Type of apartments to be constructed in the project:TypeCarpet area(In Square Meter)
Number of apartmentsNumber of towersApartment/Shops/Other Buildings
59.892763
Apartment/Shops/Other Buildings60270
3Apartment/Shops/Other Buildings59.89
243Apartment/Shops/Other Buildings
60123
Apartment/Shops/Other Buildings34.9268
1Apartment/Shops/Other Buildings35.54
661(vi) Quarterly schedule of development of whole/remaining part of the project:
(c) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureExpenditure to be made in each quarter (In Lakhs)Particulars
Year-2022Jan-MarApr-June
July-SepOct-DecApartments
0800300
400Shops0
1001500
Plots00
00Particulars
Year-2023Jan-MarApr-June
July-SepOct-DecApartments
600600600
500Shops0
0050
Plots00
00Particulars
Year-2024Jan-MarApr-June
July-SepOct-DecApartments
500500400
400Shops87
9512060
Plots00
00Particulars
Year-2025Jan-MarApr-June
July-SepOct-DecApartments
400400300
300Shops71.77
000
Plots00
00Particulars
Year-2026Jan-MarApr-June
July-SepOct-DecApartments
400404.40
0Shops0
000
Plots00
00(d) Infrastructure
Expenditure incurred till the date of application (In Lakhs)ParticularsExpenditure
Expenditure to be made in each quarter (In Lakhs)ParticularsYear-2022
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements0
000
Water Supply System00
00Sewerage treatment & garbage disposal
000
0Electricity Supply System0
000
Storm Water Drainage00
00Parks and Playgrounds
000
0Clubhouse/community centres0
000
Shopping area00
00Other
000
0ParticularsYear-2023
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements0
000
Water Supply System00
00Sewerage treatment & garbage disposal
000
0Electricity Supply System0
000
Storm Water Drainage00
00Parks and Playgrounds
000
0Clubhouse/community centres0
000
Shopping area00
00Other
000
0ParticularsYear-2024
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements0
000
Water Supply System00
00Sewerage treatment & garbage disposal
000
0Electricity Supply System0
000
Storm Water Drainage00
00Parks and Playgrounds
000
0Clubhouse/community centres0
000
Shopping area00
00Other
000
0ParticularsYear-2025
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements0
0032.13
Water Supply System00
15.4321.61Sewerage treatment & garbage disposal
0024.59
57.39Electricity Supply System0
000
Storm Water Drainage00
19.3627.1Parks and Playgrounds
000
0Clubhouse/community centres0
020.1932.31
Shopping area00
00Other
000
45.4security and fire fighting6.39
9.599.596.39
underground water tank28.5528.54
ParticularsYear-2026Jan-Mar
Apr-JuneJuly-SepOct-Dec
Roads & Pavements44.9944.99
6.420Water Supply System
21.613.080
0Sewerage treatment & garbage disposal57.39
24.5900
Electricity Supply System00
00Storm Water Drainage
27.13.860
0Parks and Playgrounds0
3.613.610
Clubhouse/community centres16.1612.12
00Shopping area
000
0Other22.67
22.6722.620
Rain water Harvesting2.31Electric sub station
1515street light
9.59STP13.81
13.81security and fire fighting15.96
parking8.768.75
construction of circular road3.67Rain water harvesting
2.3Street ligting9.59
Maintenance of services222.63security and fir fighting
22.37It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - DAccounts related information:1. Annex copy of the balance sheet of last 3 years
Yes2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.
No3. Bank account to which the deposits received from apartment buyers will be creditedBank and Branch address
Hdfc Bank, Jmd Megapolis Sohna Road GurgaonBank Account number57500000798374
IFSC codeHDFC0003648MICR code
110240344Branch code003648

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 1.29 CrYet To Be Prepared
Water Supply System₹ 61.73 lakhYet To Be Prepared
Storm Water Drainage₹ 77.42 lakhYet To Be Prepared
Sewage Treatment & Garbage Disposal₹ 1.64 CrYet To Be Prepared
Street Lighting₹ 19.18 lakhYet To Be Prepared
Security And Fire Fighting₹ 63.9 lakhYet To Be Prepared
Playgrounds And Parks₹ 7.22 lakhYet To Be Prepared
Club House/Community Centre₹ 80.78 lakhYet To Be Prepared
Any Other₹ 1.13 CrYet To Be Prepared
Parking₹ 17.51 lakhYet To Be Prepared
Stp₹ 27.62 lakhYet To Be Prepared
Underground Water Tank₹ 57.09 lakhYet To Be Prepared
Rain Water Harvesting₹ 4.61 lakhYet To Be Prepared
Electrical Sub Station₹ 30 lakhYet To Be Prepared
Construction Of Circulation Road₹ 3.67 lakhYet To Be Prepared
Maintenance Of Services For Ten Years Including Resurfacing Of Roads After Five Years Ten Years Of Maintenance₹ 2.23 CrYet To Be Prepared

Statutory approvals

ApprovalStatusDate
Forest NocAlready Been Obtained10 May 2021
Water AssuranceAlready Been Obtained15 Dec 2021
Strom WaterAlready Been Obtained15 Dec 2021
Sewage DisposalAlready Been Obtained15 Dec 2021
Height NocYet To File For Approval
Service EstimateYet To File For Approval
Fire Fighting SchemeYet To File For Approval
Environmental ClearanceYet To File For Approval

Specifications (as filed)

Flooring Details Of Various Parts Of HouseRooms Vitrified Floor Tiles. Kitchen, Toilets & Balconies Ceramic Tiles. Corridor And Stairs Kota Stone.
Wall Finishing DetailsObd Over Cement Plaster
Kitchen DetailsGranite Stone Work Top, Single Bowel Sink & Cp Brass Sink Cock.
Bathroom FittingsWhite Wc With Plastic Sistern, White Wash Basin With Pillar Taps And Bath Mixer With Shower.
Wood Work EtcNot Providing
Doors And Windos FramesInternal Wooden And External Ms Z-Section.
Glass WorkPlain Glass
Electric FittingsPoints Only For Fan, Light In Each Rooms With Plate Type Switches
Conducting And Wiring DetailsPvc Insulated Copper Wires In Upvc Conduits.
Cupboard DetailsNot Providing
Water StorageOver Head Tanks
Lift DetailsPassanger / Service Lift
External GlazingsNot Providing
Windows/GlazingsMs Z-Section
DoorsFlush Doors
Main DoorsFlush Doors
Internal DoorsFlush Doors
Air ConditioningNot Providing
Electrical FittingsNot Providing
Cng Pipe LineNot Providing
Provision Of Wifi And Broadband FacilityNot Providing
External Finishing/Colour SchemeExterior Emulsion Paint
Internal FinishingVitrified Tiles

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Rama Homes?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.