Oyster Arcade
by Adani M2K Projects LLP · Village Kherki Majra, Sector 102 Gurugram
- RERA registration
- GGM/476/208/2021/44
- Registered on
- 24 Aug 2021
- Valid till
- 24 Nov 2025
- Project ID
- RERA-GRG-786-2020
- Land area
- 2.5 acres
- Plots
- 51
- Completion (as filed)
- 24 Nov 2025
- Estimated cost
- ₹ 25.19 Cr
RERA registration
| Registration certificate | GGM/476/208/2021/44, dated 24 Aug 2021 |
|---|---|
| Registration valid till | 24 Nov 2025 |
| Project ID | RERA-GRG-786-2020 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Oyster Arcade |
| Site address | Village Kherki Majra, Sector 102 Gurugram |
| Sector | Sector 102 |
| Tehsil / District | Kadipur St / Gurugram |
| Layout plan approved | 26 Nov 2020 |
| Construction start (as filed) | 1 Jan 2021 |
| Completion (as filed) | 24 Nov 2025 |
| Application submitted | 12 Jan 2021 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
- Notice sent to the promoter 1st deficiency notice
-
Hearing
Examination By Authority View order
Proceedings
During physical hearing, Mr. Praveen Kumar Shukla (Senior Manager) appeared on behalf of the promoter and requested for next date. Deficiencies were already conveyed to the promoter vide letter no. HARERA/GGM/RPIN/301 dated 01.03.2021 with directions to remove the deficiencies latest by 11.03.2021. In reference to the notice dated 01.03.2021, the promoter has not submitted the reply of deficiencies and requested for extension of time to submit the reply. Hence, the authority has decided to issue a show cause notice as to why their application for registration of real estate project “Oyster Arcade” should not be rejected on the ground for non-removal of deficiencies in spite of providing opportunity of hearing as per the provisions under section 5 of the Real Estate (Regulation and Development) Act, 2016 and Rule-5 of Haryana Real Estate (Regulation and Development) Rules,2017. If the promoter has anything to say in this regard, then a final opportunity of hearing will be given on 19.04.2021 at 3.00 p.m. In case the promoter fail to remove the deficiencies and appear before the Authority for hearing on the above given date and time, it will be presumed that the promoter have nothing to say in this matter and their application will be rejected as per provisions of the Act and rules.
-
Hearing
Objection
Proceedings
Due to COVID-19 Pandemic, the matter is Adjourned for 23-04-2021
-
Hearing
Adjournment
Proceedings
Proceedings Dated: 23.04.2021Ms. Jyoti Yadav, Coordinator Planning Branch briefed about the project.No one is present on behalf of the promoter. A show cause notice was issued under section 5 read with rule 5 as why application for grant of registration shall not be rejected. Due to various deficiencies in the application and inspite of notice in this regard deficiencies have not been removed. Reply to the show cause notice was received on 07.04.2021. Reply was scrutinized and the deficiencies still remain to be attended were conveyed on 20.04.2021. No response has been received so far. The promoter is given one more opportunity to remove the deficiencies. The matter to come up on 17.05.2021.Dr. K.K.Khandelwal (Chairman)Samir Kumar (Member)Vijay Kumar Goyal (Member)
-
Hearing
Objection
Proceedings
Due to Covid-19 pandemic, authority meeting could not be held. Now, the authority has decided to fix the matter on 22.06.2021.
-
Hearing
Objection
Proceedings
Proceedings dated: 22.06.2021. Ms. Jyoti Yadav Coordinator Planning Branch briefed the facts of the case. Sh. Praveen Shukla (Senior Manager), Sh. Manoj Kumar (HOD), Sh. Vikas Aggarwal (AVP) is present on behalf of the promoter. An application regarding registration of commercial plotted colony project namely “Oyster Arcade” situated at sector 102, Gurugram being developed by M/s Adani M2K Projects LLP was submitted on 24.02.2021 under section 4 of Real Estate (Regulation and Development), Act 2016. After The scrutiny of the application was done by the authority and deficiencies were noticed, which were conveyed to the promoter vide letter no. HARERA/GGM/RPIN/301 dated 01.03.2021 with directions to remove the deficiencies latest by 11.03.2021 failing which their application may be rejected following the due procedure as provided under section-5 of the Real Estate Regulation and development) Act 20l6 and Rule-5 of the Haryana Real Estate (Regulation and Development) Rules, 20l7. Also, an opportunity of online hearing was offered on 15.03,2021 at 03:00 pm in the office of HARERA, Gurugram. In reference to the notice dated 01.03.2021, the promoter had not submitted the reply of deficiencies and requested for extension of time to submit the reply. Therefore, the authority has sent a show cause notice dated 15.03.2021 to the promoter under section 5 of the Real Estate (Regulation and Development) Act, 2016 and Rule-5 of Haryana Real Estate (Regulation and Development) Rules, 2017. Also, an opportunity of hearing was given on 19.04.2021. In reference to show cause notice dated 15.03.2021, the promoter has submitted the reply on 07.04.2021 which was scrutinized and found that the major deficiencies were still not fulfilled by the promoter. The deficiencies remain to be attended by the promoter were conveyed on 20.04.2021. Subsequently on 19.04.2021, due to COVID-19 pandemic, the matter was adjourned for 23-04-2021. On 23.04.2021, Mr. Manoj Kumar and Mr. Deepak Sharma appeared on behalf of the promoter. Due to various deficiencies in the application and despite notice in this regard, deficiencies have not been removed by the promoter. The promoter was given one more opportunity to remove the deficiencies. The matter was fixed for 17.05.2021. The promoter again submitted the reply on 19.05.2021 and 11.06.2021 which was scrutinized and found that the same deficiencies still exist. The major deficiencies are approved zoning plan, approved service estimates and plans (applied on 22.03.2021 and approved by Chief Engineer-I, Panchkula on 30.03.2021 and one copy sent to Additional Chief Engineer, HSVP, Gurugram on 22.03.2021 for reference. Final approval still awaited), HUDA construction water NOC, approvals for sewage disposal, storm water drainage, water supply from competent authority, electrical load availability NOC, deficit fee of Rs. 3,03,477/- not paid. These major deficiencies are conveyed to the promoter vide email dated 24.05.2021 and 18.06.2021. The AR made a submission that necessary deficiencies will be attended within 15 days. Deficit fee has already been paid. Matter to come up on 13.07.2021. Dr. K.K. Khandelwal (Chairman) Samir Kumar (Member) Vijay Kumar Goyal (Member)
-
Hearing
Objection
Proceedings
Proceedings dated: 13.07.2021 Ms. Jyoti Yadav, Coordinator Planning Branch briefed the facts about the project. Sh. Praveen Shukla, (Senior Manager), Sh. Deepak Sharma (AGM), Sh. Manoj Kumar (HOD) and Sh. Vikash Aggarwal (GM) are present on behalf of the promoter. An application regarding registration of commercial plotted colony project namely “Oyster Arcade” situated at sector 102, Gurugram being developed by M/s Adani M2K Projects LLP was submitted on 24.02.2021 under section 4 of Real Estate (Regulation and Development), Act 2016. After the scrutiny of the application was done by the authority and deficiencies were noticed, which were conveyed to the promoter vide letter no. HARERA/GGM/RPIN/301 dated 01.03.2021 with directions to remove the deficiencies latest by 11.03.2021 failing which their application may be rejected following the due procedure as provided under section-5 of The Real Estate (Regulation and Development) Act 20l6 and Rule-5 of the Haryana Real Estate (Regulation and Development) Rules, 20l7. Also, an opportunity of online hearing was offered on 15.03,2021 at 03:00 pm in the office of HARERA, Gurugram. In reference to the notice dated 01.03.2021, the promoter had not submitted the reply of deficiencies and requested for extension of time to submit the reply. Therefore, the authority has sent a show cause notice dated 15.03.2021 to the promoter under section 5 of the Real Estate (Regulation and Development) Act, 2016 and Rule-5 of Haryana Real Estate (Regulation and Development) Rules, 2017. Also, an opportunity of hearing given on 19.04.2021. In reference to show cause notice dated 15.03.2021, the promoter has submitted the reply on 07.04.2021 which was scrutinized and found that the major deficiencies were still not fulfilled by the promoter. The deficiencies remain to be attended by the promoter was conveyed on 20.04.2021. Subsequently on 19.04.2021, due to COVID-19 Pandemic, the matter was adjourned for 23-04-2021. On 23.04.2021, Mr. Manoj Kumar and Mr. Deepak Sharma appeared on behalf of the promoter. Due to various deficiencies in the application and in spite of notice in this regard, deficiencies have not been removed by the promoter. The promoter was given one more opportunity to remove the deficiencies. The matter was fixed for 17.05.2021. Due to Covid-19 pandemic, authority meeting could not be held and authority decided to fix the matter on 22.06.2021. The promoter again submitted the reply on 19.05.2021 and 11.06.2021 which was scrutinized and found that the same deficiencies still exist. The major deficiencies are approved zoning plan, approved service estimates and plans (Applied on 22.03.2021 and approved by Chief Engineer-I, Panchkula on 30.03.2021 and one copy sent to Additional Chief Engineer, HSVP, Gurugram on 22.03.2021 for reference. Final approval still awaited), HUDA construction water NOC, approvals for sewage disposal, storm water drainage, water supply from competent authority, electrical load availability NOC, deficit fee of Rs. 3,03,477/- not paid. These major deficiencies were conveyed to the promoter vide email dated 24.05.2021 and 18.06.2021. On 22.06.2021, AR made a submission that necessary deficiencies will be attended within 15 days. Deficit fee has already been paid. Matter decided to come up on 13.07.2021. The following documents which are still pending are: Online corrections in REP-I (Part A-H) needs to be done. Status: not done. Corrections in detailed project information needs to be done. Status: Checked and corrections found in the DPI which needs to be done. Part-A-Statutory Approvals and land/license related documents 1. Copy of approved zoning plan not submitted. Status: As per the hearing dated 22.06.2021, promoter is required to submit architectural control sheet which is under process. 2. Copy of approved service estimates and plans not submitted. Status: Applied on 22.03.2021 and approved by Chief Engineer-I, Panchkula on 30.03.2021 and one copy sent to Additional Chief Engineer, HSVP, Gurugram on 22.03.2021 for reference. Final approval still awaited. 3. Copy of HUDA construction water NOC not submitted. Status: Not submitted. Applied for assurance of STP treated water from GMDA Gurugram. 4. Approvals for sewage disposal, storm water drainage, water supply from competent authority needs to be submitted. Status: Not submitted. 5. Copy of electrical load availability NOC not submitted. Status: Application applied on 18.02.2021 to the Superintending Engineer, HVPN Ltd, Gurugram but approval still awaited. 6. CA certificate for equity not submitted. Status: Needs to be clarified. Allottee related draft documents 7. Revised Allotment letter, BBA, payment plan needs to be submitted. Status: Needs to be revised. 8. Application form needs to be revised. Status: Needs to be revised. The promoter is asked to supply copy of the advertisement, brochure, hoardings etc. details. As and when advertisement is to be issued copy invariably be supplied/submitted in the office of HARERA duly acknowledged. The matter to come up on 15.07.2021. Dr. K.K. Khandelwal (Chairman) Samir Kumar (Member) Vijay Kumar Goyal (Member)
-
Hearing
Objection
Proceedings
Proceedings dated: 15.07.2021 Ms. Jyoti Yadav, Coordinator Planning Branch briefed the facts about the project. Sh. Deepak Sharma (AGM), Sh. Manoj Kumar (HOD), Sh. Pratik Gautam (AM) and Sh. Saurabh Mishra are present on behalf of the promoter. An application regarding registration of commercial plotted colony project namely “Oyster Arcade” situated at sector 102, Gurugram being developed by M/s Adani M2K Projects LLP was submitted on 24.02.2021 under section 4 of Real Estate (regulation and Development), Act 2016. After The scrutiny of the application was done by the authority and deficiencies were noticed, which were conveyed to the promoter vide letter no. HARERA/GGM/RPIN/301 dated 01.03.2021 with directions to remove the deficiencies latest by 11.03.2021 failing which their application may be rejected following the due procedure as provided under section-5 of the Real Estate Regulation and development) Act 20l6 and Rule-5 of the Haryana Real Estate (Regulation and Development) Rules, 20l7. Also, an opportunity of online hearing was offered on 15.03,2021 at 03:00 pm in the office of HARERA, Gurugram. In reference to the notice dated 01.03.2021, the promoter had not submitted the reply of deficiencies and requested for extension of time to submit the reply. Therefore, the authority has sent a show cause notice dated 15.03.2021 to the promoter under section 5 of the Real Estate (Regulation and Development) Act, 2016 and Rule-5 of Haryana Real Estate (Regulation and Development) Rules, 2017. Also, an opportunity of hearing given on 19.04.2021. In reference to show cause notice dated 15.03.2021, the promoter has submitted the reply on 07.04.2021 which was scrutinized and found that the major deficiencies were still not fulfilled by the promoter. The deficiencies remain to be attended by the promoter was conveyed on 20.04.2021. Subsequently on 19.04.2021, due to COVID-19 Pandemic, the matter was adjourned for 23-04-2021. On 23.04.2021, Mr. Manoj Kumar and Mr. Deepak Sharma appeared on behalf of the promoter. Due to various deficiencies in the application and inspite of notice in this regard, deficiencies have not been removed by the promoter. The promoter was given one more opportunity to remove the deficiencies. The matter was fixed for 17.05.2021. Due to Covid-19 pandemic, authority meeting could not be held and authority decided to fix the matter on 22.06.2021. The promoter again submitted the reply on 19.05.2021 and 11.06.2021 which was scrutinized and found that the same deficiencies still exist. The major deficiencies are approved zoning plan, approved service estimates and plans (Applied on 22.03.2021 and approved by Chief Engineer-I, Panchkula on 30.03.2021 and one copy sent to Additional Chief Engineer, HSVP, Gurugram on 22.03.2021 for reference. Final approval still awaited), HUDA construction water NOC, approvals for sewage disposal, storm water drainage, water supply from competent authority, electrical load availability NOC, deficit fee of Rs. 3,03,477/- not paid. These major deficiencies were conveyed to the promoter vide email dated 24.05.2021 and 18.06.2021. On 22.06.2021, AR made a submission that necessary deficiencies will be attended within 15 days. Deficit fee has already been paid. Matter decided to come up on 13.07.2021. On 13.07.2021, the promoter was asked to supply copy of the advertisement, brochure, hoardings etc. details. As and when advertisement is to be issued copy invariably be supplied/submitted in the office of HARERA duly acknowledged. The matter to come up on 15.07.2021. As per reply dated 12.07.2021, the documents which are submitted are as follows: 1. Copy of HUDA construction water NOC not submitted. Status: submitted. Approved on 02.07.2021. 2. Approvals for sewage disposal, storm water drainage, water supply from competent authority needs to be submitted. Status: submitted. The following documents which are still pending are: Online corrections in REP-I (Part A-H) needs to be done. Status: not done. Corrections in detailed project information needs to be done. Status: Checked and corrections found in the DPI which needs to be done. Part-A-Statutory Approvals and land/license related documents 3. Copy of approved zoning plan not submitted. Status: as per the promoter’s reply dated 12.07.2021, architectural control sheet is under progress. 4. Copy of approved service estimates and plans not submitted. Status: Applied on 22.03.2021 and approved by Chief Engineer-I, Panchkula on 30.03.2021 and one copy sent to Additional Chief Engineer, HSVP, Gurugram on 22.03.2021 for reference. Final approval still awaited. 5. Copy of electrical load availability NOC not submitted. Status: application applied on 18.02.2021 to the superintending engineer, HVPN Ltd, Gurugram but approval still awaited. 6. CA certificate for equity not submitted. Status: As per CA certificate for equity, it is not clear that this equity will be invested for the project applied for registration and this contribution has already made by the designated partner which needs to be clarified by the promoter. Allottee related draft documents 7. Revised Allotment letter, BBA, payment plan needs to be submitted. Status: Date of possession not mentioned. Payment plan not as per the prescribed format. BBA not as per prescribed format. 8. Application form needs to be revised. Status: Needs to be revised. The promoter is directed to remove the deficiencies and submit the reply before next date of hearing. Necessary online information be submitted at https://hrera.in/app1/signup. Matter to come up on 27.07.2021.Dr. K.K. Khandelwal (Chairman) Samir Kumar (Member) Vijay Kumar Goyal (Member)
-
Hearing
Objection
Proceedings
Proceedings dated: 27.07.2021 Ms. Jyoti Yadav, Coordinator, Planning Branch briefed the facts about the project. Sh. Deepak Sharma (HOD), Sh. Pratik Gautam (AM), Sh. Saurabh Mishra (AM) are present on behalf of the promoter. An application regarding registration of commercial plotted colony project namely “Oyster Arcade” situated at sector 102, Gurugram being developed by M/s Adani M2K Projects LLP was submitted on 24.02.2021 under section 4 of Real Estate (regulation and Development), Act 2016. The following documents which are still pending are: Online corrections in REP-I (Part A-H) needs to be done. Status: not done. Corrections in detailed project information needs to be done. Status: Checked and corrections found in the DPI which needs to be done. Part-A-Statutory Approvals and land/license related documents 1. Copy of approved zoning plan not submitted. Status: as per the promoter’s reply dated 12.07.2021, architectural control sheet is under progress. 2. Copy of approved service estimates and plans not submitted. Status: Applied on 22.03.2021 and approved by Chief Engineer-I, Panchkula on 30.03.2021 and one copy sent to Additional Chief Engineer, HSVP, Gurugram on 22.03.2021 for reference. Final approval still awaited. 3. Copy of electrical load availability NOC not submitted. Status: application applied on 18.02.2021 to the superintending engineer, HVPN Ltd, Gurugram but approval still awaited. 4. CA certificate for equity not submitted. Status: As per CA certificate for equity, it is not clear that this equity will be invested for the project applied for registration and this contribution has already made by the designated partner which needs to be clarified by the promoter. Allottee related draft documents 5. Revised Allotment letter, BBA, payment plan needs to be submitted. Status: date of possession not mentioned. Payment plan not as per the prescribed format. BBA not as per prescribed format. 6. Application form needs to be revised. Status: needs to be revised. The status of compliance of above deficiencies was perused and it was informed by AR that the architectural control sheets stands submitted to the department for approval, but the final approval is still awaited and that they have submitted, which is of prime and basic significance/requirement for any allottee to buy a unit. Regarding approval of service plan and estimates, the requisite bank guarantee as demanded by DTCP has also been submitted and final approval/release of service plans and estimates shall be obtained within one month. Similarly, the requisite reply and undertaking for sanctioned of electric load has also been submitted to SE, RAPDRP, DHBVN, Hisar and final clearance is expected shortly. The clarification regarding CA Certificate equity will be submitted within 2 days. Further the deficiencies regarding draft allotment letter, BBA, payment plan and application form etc. has been removed and amended/corrected documents submitted today in the registry. Therefore, on the request of AR, adjourned to 10.08.2021 for submission of above deficit documents and approval of competent authority which are sine-qua-none. The matter to come up on 10.08.2021.
-
Hearing
Objection
Proceedings
Proceedings dated: 10.08.2021 Ms. Jyoti Yadav, Coordinator, Planning Branch briefed the facts about the project. Sh. Deepak Sharma (HOD), Sh. Manoj Kumar (Liaison Manager) and Sh. Vikas Aggarwal (Liaison Manager) are present on behalf of the promoter. An application regarding registration of commercial plotted colony project namely “Oyster Arcade” situated at sector 102, Gurugram being developed by M/s Adani M2K Projects LLP was submitted on 24.02.2021 under section 4 of Real Estate (Regulation and Development), Act 2016. On 10.08.2021, the promoter has submitted the approved copy of sanction letter of service estimates and plans. The documents which are pending are mentioned below. 1. Online corrections in REP-I (Part A-H) needs to be done. Status: Not done. 2. Corrections in detailed project information needs to be done. Status: Checked and corrections found in the DPI which needs to be done. 3. Copy of approved architectural control sheet not submitted. Status: As per the promoter’s reply dated 10.08.2021, architectural control sheet is under progress. 4. Copy of electrical load availability NOC not submitted. Status: Application applied on 18.02.2021 to the Superintending Engineer, HVPN Ltd, Gurugram but approval still awaited. Therefore, on the request of AR, the matter is adjourned to 24.08.2021 for submission of deficit documents.Dr. K.K. Khandelwal (Chairman)Samir Kumar (Member)Vijay Kumar Goyal (Member)
-
Hearing
Approved And Ready For Certificate Issuing Process
Proceedings
Proceedings dated: 24.08.2021 Sh. Deepak Sharma (HOD), Sh. Manoj Kumar (Liaison Manager) and Sh. Vikas Aggarwal (Liaison Manager) are present on behalf of the promoter. An application regarding registration of commercial plotted colony project namely “Oyster Arcade” situated at sector 102, Gurugram being developed by M/s Adani M2K Projects LLP was submitted on 24.02.2021 under section 4 of Real Estate (regulation and Development), Act 2016. The promoter has rectified the deficiencies conveyed earlier except approved architectural control sheet and approved electrical load availability NOC, however, application already filed for the same in the concerned department. Regarding electrical load availability NOC, AR of the company assured that the final approval of the same will be obtained from the competent authority on 25.08.2021 and will submit the same in the authority. Regarding, architectural control sheet, the promoter has submitted an undertaking on affidavit that the same shall be submitted within two months from the date of grant of registration After detailed scrutiny, the authority considers the application for registration of project and decided to grant registration subject to submission of copy of approved architectural control sheet within a period of two months. Dr. K.K. Khandelwal (Chairman)Samir Kumar (Member)Vijay Kumar Goyal (Member)
- Registration granted GGM/476/208/2021/44
- Certificate uploaded RC Approved and Certificate Uploaded
- Registration valid till
Land, licence & cost
| Land area of the project | 2.5 acres |
|---|---|
| Total licensed area | 2.5 acres |
| Licence | 37 OF 2020 DATED 25.11.2020 |
| FAR permissible / proposed | 1.5 / 1.5 |
| Estimated project cost | ₹ 25.19 Cr |
| Cost of land | ₹ 0.93 Cr |
| Infrastructure and other structures | ₹ 2.94 Cr |
| EDC, taxes, levies and other costs | ₹ 21.32 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Plots To Be Sold | 0.875 | 35% |
| Electricity Sub-Station | 0.104 | 4.2% |
| Sewage And Solid Waste Treatment Facility | 0.027 | 1.1% |
| Roads | 1.412 | 56.5% |
| Toilet | 0.022 | 0.9% |
| Ugt Or Wtp Underground | 0.032 | 1.3% |
| Rain Water Harvesting System Underground | 0.028 | 1.1% |
Plots 51 plots
| Plot size (sq m) | Sq yd | Sq ft | Plots |
|---|---|---|---|
| 49.81 | 60 | 536 | 18 |
| 55.09 | 66 | 593 | 1 |
| 69.55 | 83 | 749 | 16 |
| 71.50 | 86 | 770 | 2 |
| 78.40 | 94 | 844 | 1 |
| 78.77 | 94 | 848 | 1 |
| 80.51 | 96 | 867 | 3 |
| 100.50 | 120 | 1,082 | 7 |
| 101.17 | 121 | 1,089 | 1 |
| 129.88 | 155 | 1,398 | 1 |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | ALREADY CONNECTED | Yes |
| Water Supply | GMDA | Yes |
| Electricity | DHBVN | Yes |
| Sewage Disposal | GMDA | Yes |
| Storm Water Drainage | GMDA | Yes |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 95.69 lakh | Submitted To Town & Country Planning |
| Water Supply System | ₹ 97.23 lakh | Submitted To Town & Country Planning |
| Storm Water Drainage | ₹ 43.94 lakh | Submitted To Town & Country Planning |
| Sewage Treatment & Garbage Disposal | ₹ 42.09 lakh | Submitted To Town & Country Planning |
| Street Lighting | ₹ 9.59 lakh | Submitted To Town & Country Planning |
| Playgrounds And Parks | ₹ 4.99 lakh | Submitted To Town & Country Planning |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Licence 37 Of 2020 | Already Been Obtained | 25 Nov 2020 |
| Water Supply (Drinking) | Already Been Obtained | 30 Jun 2021 |
| Sewage Disposal | Already Been Obtained | 25 Jun 2021 |
| Storm Water Drainage | Already Been Obtained | 25 Jun 2021 |
| Layout Plan | Already Been Obtained | 26 Nov 2020 |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.