RERA applied, not grantedHRERA Gurugram

ONE42 Golf Course Road

by Experion Developers Private Limited · Plot No. Gh-1 , Sector 42, Gurugram

RERA registration
Applied, not granted yet
Applied on
23 Dec 2025
Application status
Approved And Ready For Certificate Issuing Process
Project ID
RERA-GRG-2139-2025
Land area
3.426 acres
Estimated cost
₹ 1,396.12 Cr

This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.

RERA registration

Registration certificateNot issued yet: the application is being processed by HRERA Gurugram
Project IDRERA-GRG-2139-2025
AuthorityHRERA Gurugram
Project type (as filed)Ongoing
Project nameONE42 Golf Course Road
PromoterExperion Developers Private Limited
Promoter’s registered office8TH Floor, Wing B, Milestone Experion Centre, Sector -15, Part -2, Gurugram 122001, Haryana
CINU70109DL2006FTC151343
Site addressPlot No. Gh-1 , Sector 42, Gurugram
SectorSector 42
Tehsil / DistrictWazirabad St / Gurugram
Building plans approved14 Oct 2025
Application submitted23 Dec 2025

Authority, hearings & orders

Current statusApproved And Ready For Certificate Issuing Process
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Proceedings dated: 19.01.2026.Sh. Shashank Sharma, Associate Engineer Executive and Mr. Ashish Dubey, Chartered Accountant briefed about the facts of the case.Sh. Suneet Puri (Director), Sh. Ajay Kumar (AR) is present on behalf of the promoter.The Authorized Representative of the promoter submits that an application dated 23.12.2025 has been submitted before the Authority seeking amendment of the existing Registration Certificate No. 120 of 2024 dated 16.12.2024, which is valid up to 31.12.2032. The AR further submits that the revised building plans of the said project were approved by the competent authority on 14.10.2025 and that the number of existing dwelling units as well as the sanctioned FAR remain unchanged. However, certain modifications have been made to the project layout, namely:i.         The number of basements has been increased from 3 to 4;ii.       The number of car parking spaces has been increased from 421 to 428; andiii.     The area of the community building has also been enhanced.The Authorized Representative of the promoter also submits that presently, Approved Revised Environmental Clearance, Revised Fire Scheme Approval and Mining Permission are under process and the said approvals have not yet been obtained as on date. The AR of the promoter undertakes to obtain and submit:i.          The Approved Revised Environmental Clearance within 5 months from the date of grant of amendment of registration;ii.       Revised Fire Scheme Approval within 4 months from the date of grant of amendment of registration; andiii.     Mining permission before the start of construction at the site.Further, he undertakes to submit two Demand Drafts/Bank Guarantees amounting to Rs. 25 lakhs each, as a security deposit for timely compliance with the above requirements at point (i) & (ii). It is also expressly undertaken that in the event of failure to obtain and submit the aforesaid approvals within the stipulated time frames, the said security amount(s) shall be liable to be forfeited by the Authority.The Authorized Representative of the promoter further submitted that, at the time of project registration, the promoter had declared the timeline for completion of the project under Section 4(2)(l)(C) of the Act, 2016 as 31.12.2032. It was further submitted that, till date, no construction has commenced at the project site, as the Building Plan (BR-III) were under revision and has been approved recently by the concerned department with a major revision involving an increase in the number of basements. Owing to the said major revision, construction activity could not be initiated. Accordingly, the promoter has now declared an extended timeline under the said provision as 31.12.2034 The Authority has taken note of the submissions made by the Authorized Representative of the promoter regarding the non-availability of the aforesaid statutory approvals as on date. In view of the above, and in the interest of regulatory compliance, the Authority hereby directs the promoter to submit two separate Demand Drafts/Bank Guarantees, each amounting to Rs. 25,00,000/- (Rupees Twenty-Five Lakhs only), in favour of the Authority, as security amounts for timely submission of the following approvals:              a.  Revised Fire Scheme Approval: within 4 months from the date of grant of amendment of registration; and              b.  Approved Revised Environmental Clearance: within 5 months from the date of grant of amendment of registration.In the event of non-submission of any of the above approvals within the prescribed time frames, the corresponding security amount shall stand forfeited by the Authority, and such failure may also attract additional regulatory action as permissible under the Act of 2016, rules and regulations made thereunder. Further, the promoter shall submit the requisite mining permission prior to commencement of construction at the site. Since the building plans (BR-III) have been revised, involving a major change with an increase in the number of basements, and construction could not be commenced due to the same, the request for amendment by the promoter regarding the timeline for completion of the said project under Section 4(2)(l)(C) of the Act, 2016 as 31.12.2034 is hereby allowed.Approved as proposed subject to rectification of deficiencies mentioned above.The Addendum Certificate shall be issued after submission of remaining deficiencies mentioned above including correction in A-H form, Online DPI and submission of two DD’s/BG’s of Rs. 25 lakhs each for submission of Revised Fire Scheme approval and Approved Revised Environmental Clearance within the timeframe mentioned above.  

Land, licence & cost

Land area of the project3.426 acres
Total licensed area3.426 acres
LicencePlot No. GH-1 vide Memo No. ZO002/EO018/UE029/GALOT/0000001411 dated 21.12.2023 Allotted by the HSVP and Conveyance Deed was executed on dated 16.09.2024, Vasika No. 12040.
FAR permissible / proposed3.62 / 3.61
Estimated project cost₹ 1,396.12 Cr
Cost of land₹ 345.08 Cr
Cost of construction₹ 678.14 Cr
Infrastructure and other structures₹ 37.36 Cr
EDC, taxes, levies and other costs₹ 335.54 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments0.8223.9%
Construction Of Roads0.8625.1%
Pavements1.1333%
Green Belts0.5215.2%
Electricity Sub-Station0.061.8%
Club House0.0361.1%

External services

ServiceProvided byApproval taken
RoadsALREADY CONNECTEDYes
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 9.24 CrAs Per Project Report
Water Supply System₹ 1.4 CrAs Per Project Report
Storm Water Drainage₹ 45 lakhAs Per Project Report
Electricity Supply System₹ 11.75 CrAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 26.93 lakhAs Per Project Report
Street Lighting₹ 45.73 lakhAs Per Project Report
Security And Fire Fighting₹ 1.58 CrAs Per Project Report
Playgrounds And Parks₹ 9.24 CrYet To Be Prepared
Renewable Energy System₹ 33.29 lakhAs Per Project Report
Stp₹ 49.21 lakhAs Per Project Report
Underground Water Tank₹ 26.66 lakhAs Per Project Report
Rain Water Harvesting₹ 18.23 lakhAs Per Project Report
Electrical Sub Station₹ 1.71 CrAs Per Project Report

Statutory approvals

ApprovalStatusDate
Building PlanAlready Been Obtained14 Oct 2025
AaiAlready Been Obtained14 Aug 2023
Assurance Of Water SupplyAlready Been Obtained29 Mar 2024
Assurance For Sewerage ConnectionAlready Been Obtained27 Mar 2024
Assurance For Storm WaterAlready Been Obtained27 Mar 2024
Electrical LoadAlready Been Obtained26 Jul 2024
HUDA ConstructionAlready Been Obtained30 Jul 2024
LoiAlready Been Obtained12 Jul 2023
Environment ClearanceApplied For But Yet To Receive2 Jul 2025
Fire Scheme ApprovalApplied For But Yet To Receive12 Nov 2025

Specifications (as filed)

Flooring Details Of Various Parts Of HouseImported Marble, Laminated Wooden Flooring / Hardwood Floor / Engineered Wooden Floor, Anti Skid Vitrified Tiles / Stone, Ceramic Tile
Wall Finishing DetailsVitrified Tile Upto False Ceiling / Stone, Vitrified Tiles Up To Height As Per Design,
Kitchen DetailsAnti Skid Vitrified Tiles / Stone, Vitrified Tiles Up To Height As Per Design False Ceiling With Acrylic Emulsion Paint, Prefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame, Aluminium/ Upvc
Bathroom FittingsVitrified Tile Upto False Ceiling / Stone
Doors And Windos FramesMain Door To Flat - Hardwood Frame With Glass Panels / Veneered Flush Door, Prefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame, Aluminium/ Upvc
Glass WorkDouble Glazed/Single Glazed Performance Glass
Electric FittingsPvc Conduit, Modular Switches, 1.1 Kv Grade Copper Flexiblewire, Gi Box, 300MM Dia In Common Area Only, Led Lights (In Common Area Only)
Conducting And Wiring Details1.1 Kv Grade Copper Flexiblewire
Lift DetailsTwo Towers With 2 To A Core, Total 44 Nos. Flats In Both The Towers, One Tower With 1 Flat At Each Floor, Total 22 Flats. Total No. Of Flats = 110 Nos. (2*44+22)
External GlazingsDouble Closing Unit Prfomance Glass
Windows/GlazingsDouble Closing Unit Prfomance Glass
DoorsHardwood Frame
Main DoorsMain Door To Flat - Hardwood Frame With Glass Panels / Veneered Flush Door.
Internal DoorsPrefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame.
Air ConditioningVrv With Suitable Idu As Per Design
Electrical FittingsAs Per Design
Provision Of Wifi And Broadband FacilityAs Per Design
Internal FinishingAcrylic Emulsion Paint, Paint And Hardwood Frame, Imported Marble, Prefabricated Door Frame

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about ONE42 Golf Course Road?

This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.