- 3.426 acres
- Estimated cost
- ₹ 1,396.12 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
| Registration certificate | Not issued yet: the application is being processed by HRERA Gurugram |
|---|---|
| Project ID | RERA-GRG-2139-2025 |
| Authority | HRERA Gurugram |
| Project type (as filed) | Ongoing |
| Project name | ONE42 Golf Course Road |
| Promoter | Experion Developers Private Limited |
| Promoter’s registered office | 8TH Floor, Wing B, Milestone Experion Centre, Sector -15, Part -2, Gurugram 122001, Haryana |
| CIN | U70109DL2006FTC151343 |
| Site address | Plot No. Gh-1 , Sector 42, Gurugram |
| Sector | Sector 42 |
| Tehsil / District | Wazirabad St / Gurugram |
| Building plans approved | 14 Oct 2025 |
| Application submitted | 23 Dec 2025 |
Authority, hearings & orders
- Application submitted online
-
Hearing
Approved And Ready For Certificate Issuing Process View order
Proceedings
Proceedings dated: 19.01.2026.Sh. Shashank Sharma, Associate Engineer Executive and Mr. Ashish Dubey, Chartered Accountant briefed about the facts of the case.Sh. Suneet Puri (Director), Sh. Ajay Kumar (AR) is present on behalf of the promoter.The Authorized Representative of the promoter submits that an application dated 23.12.2025 has been submitted before the Authority seeking amendment of the existing Registration Certificate No. 120 of 2024 dated 16.12.2024, which is valid up to 31.12.2032. The AR further submits that the revised building plans of the said project were approved by the competent authority on 14.10.2025 and that the number of existing dwelling units as well as the sanctioned FAR remain unchanged. However, certain modifications have been made to the project layout, namely:i. The number of basements has been increased from 3 to 4;ii. The number of car parking spaces has been increased from 421 to 428; andiii. The area of the community building has also been enhanced.The Authorized Representative of the promoter also submits that presently, Approved Revised Environmental Clearance, Revised Fire Scheme Approval and Mining Permission are under process and the said approvals have not yet been obtained as on date. The AR of the promoter undertakes to obtain and submit:i. The Approved Revised Environmental Clearance within 5 months from the date of grant of amendment of registration;ii. Revised Fire Scheme Approval within 4 months from the date of grant of amendment of registration; andiii. Mining permission before the start of construction at the site.Further, he undertakes to submit two Demand Drafts/Bank Guarantees amounting to Rs. 25 lakhs each, as a security deposit for timely compliance with the above requirements at point (i) & (ii). It is also expressly undertaken that in the event of failure to obtain and submit the aforesaid approvals within the stipulated time frames, the said security amount(s) shall be liable to be forfeited by the Authority.The Authorized Representative of the promoter further submitted that, at the time of project registration, the promoter had declared the timeline for completion of the project under Section 4(2)(l)(C) of the Act, 2016 as 31.12.2032. It was further submitted that, till date, no construction has commenced at the project site, as the Building Plan (BR-III) were under revision and has been approved recently by the concerned department with a major revision involving an increase in the number of basements. Owing to the said major revision, construction activity could not be initiated. Accordingly, the promoter has now declared an extended timeline under the said provision as 31.12.2034 The Authority has taken note of the submissions made by the Authorized Representative of the promoter regarding the non-availability of the aforesaid statutory approvals as on date. In view of the above, and in the interest of regulatory compliance, the Authority hereby directs the promoter to submit two separate Demand Drafts/Bank Guarantees, each amounting to Rs. 25,00,000/- (Rupees Twenty-Five Lakhs only), in favour of the Authority, as security amounts for timely submission of the following approvals: a. Revised Fire Scheme Approval: within 4 months from the date of grant of amendment of registration; and b. Approved Revised Environmental Clearance: within 5 months from the date of grant of amendment of registration.In the event of non-submission of any of the above approvals within the prescribed time frames, the corresponding security amount shall stand forfeited by the Authority, and such failure may also attract additional regulatory action as permissible under the Act of 2016, rules and regulations made thereunder. Further, the promoter shall submit the requisite mining permission prior to commencement of construction at the site. Since the building plans (BR-III) have been revised, involving a major change with an increase in the number of basements, and construction could not be commenced due to the same, the request for amendment by the promoter regarding the timeline for completion of the said project under Section 4(2)(l)(C) of the Act, 2016 as 31.12.2034 is hereby allowed.Approved as proposed subject to rectification of deficiencies mentioned above.The Addendum Certificate shall be issued after submission of remaining deficiencies mentioned above including correction in A-H form, Online DPI and submission of two DD’s/BG’s of Rs. 25 lakhs each for submission of Revised Fire Scheme approval and Approved Revised Environmental Clearance within the timeframe mentioned above.
Land, licence & cost
| Land area of the project | 3.426 acres |
|---|---|
| Total licensed area | 3.426 acres |
| Licence | Plot No. GH-1 vide Memo No. ZO002/EO018/UE029/GALOT/0000001411 dated 21.12.2023 Allotted by the HSVP and Conveyance Deed was executed on dated 16.09.2024, Vasika No. 12040. |
| FAR permissible / proposed | 3.62 / 3.61 |
| Estimated project cost | ₹ 1,396.12 Cr |
| Cost of land | ₹ 345.08 Cr |
| Cost of construction | ₹ 678.14 Cr |
| Infrastructure and other structures | ₹ 37.36 Cr |
| EDC, taxes, levies and other costs | ₹ 335.54 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 0.82 | 23.9% |
| Construction Of Roads | 0.86 | 25.1% |
| Pavements | 1.13 | 33% |
| Green Belts | 0.52 | 15.2% |
| Electricity Sub-Station | 0.06 | 1.8% |
| Club House | 0.036 | 1.1% |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | ALREADY CONNECTED | Yes |
| Water Supply | GMDA | Yes |
| Electricity | DHBVN | Yes |
| Sewage Disposal | GMDA | Yes |
| Storm Water Drainage | GMDA | Yes |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 9.24 Cr | As Per Project Report |
| Water Supply System | ₹ 1.4 Cr | As Per Project Report |
| Storm Water Drainage | ₹ 45 lakh | As Per Project Report |
| Electricity Supply System | ₹ 11.75 Cr | As Per Project Report |
| Sewage Treatment & Garbage Disposal | ₹ 26.93 lakh | As Per Project Report |
| Street Lighting | ₹ 45.73 lakh | As Per Project Report |
| Security And Fire Fighting | ₹ 1.58 Cr | As Per Project Report |
| Playgrounds And Parks | ₹ 9.24 Cr | Yet To Be Prepared |
| Renewable Energy System | ₹ 33.29 lakh | As Per Project Report |
| Stp | ₹ 49.21 lakh | As Per Project Report |
| Underground Water Tank | ₹ 26.66 lakh | As Per Project Report |
| Rain Water Harvesting | ₹ 18.23 lakh | As Per Project Report |
| Electrical Sub Station | ₹ 1.71 Cr | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Building Plan | Already Been Obtained | 14 Oct 2025 |
| Aai | Already Been Obtained | 14 Aug 2023 |
| Assurance Of Water Supply | Already Been Obtained | 29 Mar 2024 |
| Assurance For Sewerage Connection | Already Been Obtained | 27 Mar 2024 |
| Assurance For Storm Water | Already Been Obtained | 27 Mar 2024 |
| Electrical Load | Already Been Obtained | 26 Jul 2024 |
| HUDA Construction | Already Been Obtained | 30 Jul 2024 |
| Loi | Already Been Obtained | 12 Jul 2023 |
| Environment Clearance | Applied For But Yet To Receive | 2 Jul 2025 |
| Fire Scheme Approval | Applied For But Yet To Receive | 12 Nov 2025 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Imported Marble, Laminated Wooden Flooring / Hardwood Floor / Engineered Wooden Floor, Anti Skid Vitrified Tiles / Stone, Ceramic Tile |
|---|---|
| Wall Finishing Details | Vitrified Tile Upto False Ceiling / Stone, Vitrified Tiles Up To Height As Per Design, |
| Kitchen Details | Anti Skid Vitrified Tiles / Stone, Vitrified Tiles Up To Height As Per Design False Ceiling With Acrylic Emulsion Paint, Prefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame, Aluminium/ Upvc |
| Bathroom Fittings | Vitrified Tile Upto False Ceiling / Stone |
| Doors And Windos Frames | Main Door To Flat - Hardwood Frame With Glass Panels / Veneered Flush Door, Prefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame, Aluminium/ Upvc |
| Glass Work | Double Glazed/Single Glazed Performance Glass |
| Electric Fittings | Pvc Conduit, Modular Switches, 1.1 Kv Grade Copper Flexiblewire, Gi Box, 300MM Dia In Common Area Only, Led Lights (In Common Area Only) |
| Conducting And Wiring Details | 1.1 Kv Grade Copper Flexiblewire |
| Lift Details | Two Towers With 2 To A Core, Total 44 Nos. Flats In Both The Towers, One Tower With 1 Flat At Each Floor, Total 22 Flats. Total No. Of Flats = 110 Nos. (2*44+22) |
| External Glazings | Double Closing Unit Prfomance Glass |
| Windows/Glazings | Double Closing Unit Prfomance Glass |
| Doors | Hardwood Frame |
| Main Doors | Main Door To Flat - Hardwood Frame With Glass Panels / Veneered Flush Door. |
| Internal Doors | Prefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame. |
| Air Conditioning | Vrv With Suitable Idu As Per Design |
| Electrical Fittings | As Per Design |
| Provision Of Wifi And Broadband Facility | As Per Design |
| Internal Finishing | Acrylic Emulsion Paint, Paint And Hardwood Frame, Imported Marble, Prefabricated Door Frame |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.




Questions about ONE42 Golf Course Road?
This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.