Jmd Suburbio-1
by Jmd Limited · Sector 67
- RERA registration
- GGM/555/287/2022/30
- Registered on
- 25 Apr 2022
- Valid till
- 30 Dec 2024
- Project ID
- RERA-GRG-762-2020
- Land area
- 2.912 acres
- Estimated cost
- ₹ 139.16 Cr
RERA registration
| Registration certificate | GGM/555/287/2022/30, dated 25 Apr 2022 |
|---|---|
| Registration valid till | 30 Dec 2024 |
| Project ID | RERA-GRG-762-2020 |
| Authority | HRERA Gurugram |
| Project type (as filed) | Ongoing |
| Project name | Jmd Suburbio-1 |
| Promoter | Jmd Limited |
| Promoter’s registered office | 3RD Floor, Jmd Regent Square, M.g. Road, Gurgaon, Haryana 122001 |
| CIN | U74899DL1989PLC038093 |
| Site address | Sector 67 |
| Sector | Sector 67 |
| Tehsil / District | Badshahpur St / Gurugram |
| Application submitted | 20 Oct 2020 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
- Notice sent to the promoter By Hand
-
Hearing
Adjournment View order
Proceedings
Sh. Ashish Kush, Planning Executive briefed the facts about the project. Mr. Karan Bedi (Director) and Mr. Sunil Bedi (MD) are present on behalf of the promoter. The promoter M/s JMD Ltd. who is a BIP Holder for 2.912 applied for the registration of commercial project namely “JMD Suburbio-1” located at Sector-67, Gurugram under section 4 of the Real Estate (Regulations and Development) Act, 2016 vide central receipt no. 22947 dated 03.09.2021 and RPIN-372. The Temp I.D. of REP – I (Part A-H) is RERA -GRG-PROJ-762-2020. The project area for registration is 2.912 acres out of the licensed area i.e. 4.237 acres. License no – 291 of 2007 dated 31.12.2007. The licensed area of the project is 4.237 acres. Further, the project is divided into 2 phases i.e 1 Phase- I – 2.912 acres 2 Phase- II – 1.325 acres The application for registration was scrutinized and 1st deficiency notice vide notice no. HARERA/GGM/RPIN/372 dated 09.09.2021 was issued to the promoter with an opportunity of being heard on 21.09.2021. The promoter submitted the reply on 20.09.2021, after scrutiny of the reply remaining deficiencies are mentioned below: 1. Deficit Fee- Rs 23,43.419/-. 2. The annexures in the online application are not uploaded as well as the correction needs to be done in the online (A-H) application. 3. DPI needs to be corrected. 4. Mutation, jamabandi and aks-shajra duly certified by revenue officer six months prior to date of application needs to be submitted. Status: 5. Non-encumbrance certificate needs to be submitted. 6. Information to the revenue department regarding the entry of project land licensed and bonded for setting up of a colony. 7. Project report needs to be revised. 8. Approvals / NOC’s from various agencies for connecting external services like roads, storm water drainage and sewerage disposal needs to be submitted. 9. Quarterly schedule physical progress of infrastructure and services needs to be filled in DPI. 10. Draft Allotment letter is not as per the prescribed format. 11. Draft Builder Buyer Agreement is not as per the prescribed format. 12. Pert Chart needs to be revised. 13. List of sold and unsold inventory needs to be submitted. 14. Cost of land needs to be corrected as per the applied area of the project. 15. Cost of conversion, license fees, EDC, IDC needs to be clarified. 16. KYC of project consultant needs to be submitted. 17. CA certificate for financial and inventory details needs to be submitted. The promoter requested for one week time for rectification of deficiencies and the authority grants the same. The matter to come up on 27.09.2021. The authority directed the promoter to remove the above mentioned deficiencies and the matter to come up on 11.10.2021. Member (Samir Kumar)Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
-
Hearing
Adjournment View order
Proceedings
Ms. Prachi Singh, Planning Executive briefed the facts of the project. The promoter M/s JMD Ltd. who is a BIP Holder for 2.912 applied for the registration of commercial project namely “JMD Suburbio-1” located at Sector-67, Gurugram under section 4 of the Real Estate (Regulations and Development) Act, 2016 vide central receipt no. 22947 dated 03.09.2021 and RPIN-372. The Temp I.D. of REP – I (Part A-H) is RERA -GRG-PROJ-762-2020. The project area for registration is 2.912 acres out of the licensed area i.e. 4.237 acres. License no – 291 of 2007 dated 31.12.2007. The licensed area of the project is 4.237 acres. Further, the project is divided into 2 phases i.e 1 Phase- I – 2.912 acres 2 Phase- II – 1.325 acres The application for registration was scrutinized and 1st deficiency notice vide notice no. HARERA/GGM/RPIN/372 dated 09.09.2021 was issued to the promoter with an opportunity of being heard on 21.09.2021. The promoter submitted the reply on 20.09.2021, after scrutiny of the reply remaining deficiencies are mentioned below: 1. Deficit Fee- Rs 23,43.419/-. 2. The annexures in the online application are not uploaded as well as the correction needs to be done in the online (A-H) application. 3. DPI needs to be corrected. 4. Mutation, jamabandi and aks-shajra duly certified by revenue officer six months prior to date of application needs to be submitted. Status: 5. Non-encumbrance certificate needs to be submitted. 6. Information to the revenue department regarding the entry of project land licensed and bonded for setting up of a colony. 7. Project report needs to be revised. 8. Approvals / NOC’s from various agencies for connecting external services like roads, storm water drainage and sewerage disposal needs to be submitted. 9. Quarterly schedule physical progress of infrastructure and services needs to be filled in DPI. 10. Draft Allotment letter is not as per the prescribed format. 11. Draft Builder Buyer Agreement is not as per the prescribed format. 12. Pert Chart needs to be revised. 13. List of sold and unsold inventory needs to be submitted. 14. Cost of land needs to be corrected as per the applied area of the project. 15. Cost of conversion, license fees, EDC, IDC needs to be clarified. 16. KYC of project consultant needs to be submitted. 17. CA certificate for financial and inventory details needs to be submitted. On 21.09.2021, the promoter requested for one week time for rectification of deficiencies and the authority grants the same. The matter to come up on 27.09.2021. On 27.09.2021, the authority directed the promoter to remove the above mentioned deficiencies and the matter to come up on 11.10.2021. The promoter has requested for the adjournment to submit the deficit documents. Therefore, the Authority has decided to grant the 15 days time for the submission of the above mentioned documents. The matter to came up on 26.10.2021. Member (Samir Kumar)Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
-
Hearing
Adjournment View order
Proceedings
THE MATTER IS ADJOURNED FOR 27.10.2021
- Hearing Adjournment View order
-
Hearing
Adjournment View order
Proceedings
Proceedings dated: 21.12.2021 Sh. Ashish Kush, Planning Executive briefed about the facts of the project. Sh. Sunil Bedi (MD) and Sh. Karan Bedi (Director) are present on behalf of the promoter. The promoter submitted that on 19.09.2018 A to H information was filed for generation of temp ID along with deposition of fee of Rs. 4,30,000/- online. Although no application was submitted in the Authority along with necessary documents and the information filed online in A to H format lapsed in due course. The promoter insisted that late fee shall not be charged. The matter was discussed at length and finally it was decided that matter be referred for legal opinion to Ms. Geeta Rathee Singh, Legal Officer for which a separate application shall be moved by the promoter along with justification. The matter to come up on 10.01.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
-
Hearing
Objection View order
Proceedings
Sh. Ashish Kush, Planning Executive briefed about the facts of the project. No one is present on behalf of the promoter. The promoter request for the adjournment through an email dated 10.01.2022. The promoter failed to remove the deficiencies in spite of repeated reminders and opportunities of being heard on 21.09.2021, 27.09.2021, 11.10.2021, 26.10.2021, 27.10.2021, 21.12.2021, 10.01.2021. Neither the deficit fee has been deposited till date. In view of same it was decided to issue a show cause notice as to why the application for registration of their project be not rejected. The matter to come up on 14.02.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
-
Hearing
Adjournment
Proceedings
Proceedings dated: 14.02.2022 Sh. Ashish Kush, Planning Executive briefed about the facts of the project. Ms. Priyanka Aggarwal (Advocate) is present on behalf of the promoter. The AR of the promoter company informs that in response to the notice issued by the Authority dated 14.01.2022, the deficiencies have been rectified except for minor corrections in online DPI and form A to H. Further, the promoter company has applied for issuance of NOC for storm water and the same is expected within a week by which time, the requisite corrections in online DPI and from A to H will be submitted. The matter to come up on 28.02.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
-
Hearing
Adjournment View order
Proceedings
Sh. Ashish Kush, Planning Executive briefed about the facts of the project. Ms. Priyanka Aggarwal (Advocate) is present on behalf of the promoter. The promoter has submitted detailed reply along with related annexures in reference to deficiency notice issued by the Authority vide letter dated 10.01.2022 and in reference to discussions during last hearing. The Planning Executive Sh. Ashish Kush points out that there still some corrections required to be made in form A to H and online DPI as remaining observations/deficiencies stand rectified. Regarding obtaining of the NOC for storm water, AR informs that the OC for the project has been already been obtained on 18.10.2018 and thereafter sewer connection has also been obtained and for storm water, the rain water harvesting system has been operationalized, a copy of sewerage connection and provisioning of rain water harvesting system shall be submitted along with minor rectification in from A to H and online DPI within one week. The matter to come up on 07.03.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
-
Hearing
Adjournment View order
Proceedings
Proceedings dated: 07.03.2022 Sh. Ashish Kush, Planning Executive briefed about the facts of the project. Ms. Priyanka Aggarwal (AR), Sh. Rajesh Soni (VP) and Sh. Karan Bedi (Director) are present on behalf of the promoter. The Authority directed the promoter to submit the corrected Online DPI, Form (A-H) and a report regarding the rain harvesting system within a week. The matter to come up on 14.03.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
-
Hearing
Adjournment View order
Proceedings
Proceedings dated: 14.03.2022 Sh. Jyoti Yadav, Coordinator Planning Branch briefed about the facts of the project. Ms. Priyanka Aggarwal (AR), Sh. Rajesh Soni (VP) and Sh. Karan Bedi (Director) are present on behalf of the promoter. The Authority directed the promoter to submit the corrected Online DPI, Form (A-H) within a week. The matter to come up on 21.03.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
-
Hearing
Adjournment View order
Proceedings
Proceedings dated: 21.03.2022 The matter is adjourned and fixed for 04.04.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
-
Hearing
Adjournment View order
Proceedings
Proceedings dated: 04.04.2022 Sh. Ashish Kush, Planning Executive briefed about the facts of the project. Sh. Dharmender (Architect), Sh. Rajesh Soni (V.P- Marketing) and Sh. Karan Bedi (Director) are present on behalf of the promoter. The Authority directed the promoter to submit the online form (A-H) and fixed the matter for 11.04.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
-
Hearing
Adjournment View order
Proceedings
Proceedings dated: 11.04.2022 Sh. Ashish Kush, Planning Executive briefed about the facts of the project. Sh. Dharmender (Architect), Sh. Rajesh Soni (VP), Ms. Priyanka Agarwal (AR) and Sh. Sunil Bedi (MD) are present on behalf of the promoter. Technical due diligence report regarding incomplete works which are required to be completed for obtaining CC of the whole project be submitted along with estimated financial cost. For obtaining CC of the project what dues are to be paid shall also to be specified along with narration of other pre-requisite to be completed for applying/obtaining CC. The total financial liability needs to be kept in the RERA account maintained for the project. The matter to come up on 25.04.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
-
Hearing
Approved And Ready For Certificate Issuing Process View order
Proceedings
Sh. Ashish Kush, Planning Executive briefed about the facts of the project. Sh. Karan Bedi (Director), Sh. Dharmender Singh (Architect), Ms. Priyanka Aggarwal (AR) and Sh. Sunil Bedi (MD) are present on behalf of the promoter. The AR of the promoter submitted that OC for the entire building stands obtained on 18.10.2018 from DTCP and a report from Paresh & Associates has been obtained regarding the technical and financial due diligence for pending works & cost thereof for obtaining Completion Certificate. As per the financial report, the electrical sub station work is pending and estimated cost for the work is Rs. 65 lakhs as well renewable energy system is pending and estimated cost for the work is Rs. 32 lakhs. The Authority directed the promoter to submit the above said amounts in the RERA account which is to be used only for the above said works. The promoter also submitted an affidavit-cum-undertaking that the Government dues regarding the project are not pending and the EDC, IDC, License fee, conversion charges, renewable charges till date are fully paid. The Authority decided to grant registration subject to condition that the above said amount shall remain deposited in the separate RERA account and shall be used as per provisions of the Act and for executing pending works applying for CC.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)
- Registration granted GGM/555/287/2022/30
- Certificate uploaded RC Uploaded
- Registration valid till
Land, licence & cost
| Land area of the project | 2.912 acres |
|---|---|
| Total licensed area | 4.237 acres |
| Licence | 291 of 2007 dated 31/5/2007 by DTCP, Haryana |
| FAR permissible / proposed | 1.75 / 1.75 |
| Estimated project cost | ₹ 139.16 Cr |
| Cost of land | ₹ 39.1 Cr |
| Cost of construction | ₹ 48.03 Cr |
| Infrastructure and other structures | ₹ 11.79 Cr |
| EDC, taxes, levies and other costs | ₹ 40.23 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 1.0001 | 34.3% |
| Construction Of Roads | 0.2298 | 7.9% |
| Parks And Playgrounds | 0.2298 | 7.9% |
| Vehicle Parkings | 1.3375 | 45.9% |
| Any Other | 0.1149 | 3.9% |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | HUDA | Yes |
| Water Supply | HUDA | Yes |
| Electricity | DHBVN | Yes |
| Sewage Disposal | HUDA | Yes |
| Storm Water Drainage | HUDA | No |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 95.35 lakh | Submitted To Town & Country Planning |
| Water Supply System | ₹ 1.31 Cr | Submitted To Town & Country Planning |
| Storm Water Drainage | ₹ 48.32 lakh | Submitted To Town & Country Planning |
| Electricity Supply System | ₹ 3.05 Cr | Submitted To Town & Country Planning |
| Sewage Treatment & Garbage Disposal | ₹ 86.45 lakh | Submitted To Town & Country Planning |
| Street Lighting | ₹ 14.71 lakh | Submitted To Town & Country Planning |
| Security And Fire Fighting | ₹ 1.62 Cr | Submitted To Town & Country Planning |
| Playgrounds And Parks | ₹ 5.22 lakh | Submitted To Town & Country Planning |
| Renewable Energy System | ₹ 37.25 lakh | Submitted To Town & Country Planning |
| Stp | ₹ 18.72 lakh | Submitted To Town & Country Planning |
| Under Ground Water Tank | ₹ 37.25 lakh | Submitted To Town & Country Planning |
| Rain Water Harvesting | ₹ 7 lakh | Submitted To Town & Country Planning |
| Electrical Sub Station | ₹ 2.13 Cr | Submitted To Town & Country Planning |
| Sector Raod | ₹ 17.75 lakh | Submitted To Town & Country Planning |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Environment Clearance | Already Been Obtained | |
| Br-III | Already Been Obtained | |
| Electrical Scheme Approval | Already Been Obtained | |
| Service Plan And Esimate | Already Been Obtained | |
| Fire Noc | Already Been Obtained | |
| Occupancy Certificate | Already Been Obtained | 18 Jul 2018 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Granite & Tiles Work |
|---|---|
| Wall Finishing Details | Granite Work, Plastic Paints |
| Kitchen Details | Granite & Tiles Work |
| Bathroom Fittings | Hind Ware, Jaguar,Toto |
| Wood Work Etc | Ivory Teak Wood |
| Doors And Windos Frames | Powder Coated Aluminium Section |
| Glass Work | Toughened Glass Work |
| Electric Fittings | Anchor Aroma |
| Conducting And Wiring Details | Pvc Conducting, Poly Cab Wiring |
| Cupboard Details | Teak Wood |
| Water Storage | R Cc Tank |
| Lift Details | Johnson Lifts Six Nos With Max. Capacity 680 Kgs |
| External Glazings | Toughened Glass 12 Mm Thick |
| Windows/Glazings | Toughened Glass 6 Mm Thick |
| Doors | Flush Doors |
| Main Doors | Glass Doors |
| Internal Doors | Mandarin Wood Flush Doors |
| Air Conditioning | Non Ac Building With Provision Of Dx System Cooling For Shops. Also Spilt Ac In Imperial Suites |
| Electrical Fittings | Anchor Aroma |
| Cng Pipe Line | Na Now |
| Provision Of Wifi And Broadband Facility | Yes |
| External Finishing/Colour Scheme | Texture Paint Shade Ivory |
| Internal Finishing | Plastic Paints |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.