RERA applied, not grantedHRERA Gurugram

Gokulam

by Nb Buildcon Pvt. Ltd · Sector 7, Sohna, Gurugram

RERA registration
Applied, not granted yet
Applied on
2 Jul 2026
Application status
Physical Docs Received
Project ID
RERA-GRG-2275-2026
Land area
9.443 acres
Estimated cost
₹ 105.02 Cr

This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.

RERA registration

Registration certificateNot issued yet: the application is being processed by HRERA Gurugram
Project IDRERA-GRG-2275-2026
AuthorityHRERA Gurugram
Project type (as filed)Ongoing
Project nameGokulam
PromoterNb Buildcon Pvt. Ltd
Promoter’s registered office48, Basant Lok, Vasant Vihar, New Delhi
CINU45201DL2006PTC146913
Site addressSector 7, Sohna, Gurugram
SectorSector 7
Tehsil / DistrictSohna / Gurugram
Application submitted2 Jul 2026

Authority, hearings & orders

Current statusPhysical Docs Received
Next hearingNot Required
  1. Application submitted online
  2. Notice sent to the promoter Deficiency notice and Show cause notice

Land, licence & cost

Land area of the project9.443 acres
Total licensed area10.413 acres
Licence168 OF 2022 dated 21.10.2022 by Director, Town and Country Planning.
FAR permissible / proposed0 / 0
Estimated project cost₹ 105.02 Cr
Cost of land₹ 39.9 Cr
Infrastructure and other structures₹ 19 Cr
EDC, taxes, levies and other costs₹ 46.13 Cr

How the land will be used

UseSq mShare
Plots To Be Sold20,434.27751.3%
Construction Of Roads8,283.5120.8%
Parks And Playgrounds3,579.859%
Electricity Sub-Station999.572.5%
Area To Be Left For Transferring To The Government For Community Services4,222.4910.6%
Stp399.831%
Underground Water Tank199.910.5%
Milk And Vegetable Booth27.110.1%
Commercial1,673.374.2%

External services

ServiceProvided byApproval taken
RoadsYesWATER SUPPLY
HSVPYesELECTRICITY
DHBVNYesSEWAGE DISPOSAL
HSVPYesSTORM WATER DRAINAGE
HSVPYes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)1INTERNAL ROADS AND PAVEMENTS
228.40AS PER PROJECT REPORT2
Water Supply System270.80AS PER PROJECT REPORT
3STORM WATER DRAINAGE90.62
As Per Project Report4ELECTRICITY SUPPLY SYSTEM
0.00AS PER PROJECT REPORT5
Sewage Treatment & Garbage Disposal132.13AS PER PROJECT REPORT
6STREET LIGHTING26.55
As Per Project Report7SECURITY AND FIRE FIGHTING
30.60AS PER PROJECT REPORT8
Playgrounds And Parks34.24AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0.00
As Per Project Report10SHOPPING AREA
0.00AS PER PROJECT REPORT11
Renewable Energy System0.00AS PER PROJECT REPORT
12SCHOOL0.00
As Per Project Report13HOSPITAL/DISPENSARY
0.00AS PER PROJECT REPORT14
Any Other160.90AS PER PROJECT REPORT
15STP212.90
As Per Project Report16UNDERGROUND WATER TANK
108.00AS PER PROJECT REPORT17
Electrical Sub Station528.50AS PER PROJECT REPORT
18CONSTRUCATION OF CIRCULATION ROAD76.07
As Per Project Report5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.NA
(date)6. Date of approval of Building PlansNA
(date)(i) Details of the plots/apartments in the project:Sr. No.
Plot/ apartment typeSize of the plot/carpet area of the apartmentsTotal number of plots/apartments in the project
Total size of the plots/carpet area of the apartmentsPlots/apartments booked/ sold upto the date of applicationYet to be sold/ booked
No. of towers to be/ being constructed for booked apartments1PLOT Type A
135.000141890
1310
2PLOT Type B145.720
4582.880
403
PLOT Type C146.19924
3508.7761113
04PLOT Type D
144.9604579.84
400
5PLOT Type E131.724
7922.0687
006
PLOT Type F111.48120
2229.62200
07PLOT Type G
126.000121512
1200
8PLOT Type H150.000
40600038
209
PLOT Type J1104.1181
104.11810
010PLOT Type J2
111.4021111.402
100
11PLOT Type J3118.689
1118.6891
0012
PLOT Type J4125.9721
125.97210
013PLOT Type J5
133.2561133.256
100
14PLOT Type J6140.543
1140.5431
0015
PLOT Type K145.1701
145.1701
016PLOT Type L
142.5001142.5
010
17PLOT Type M149.191
1149.1911
0018
PLOT Type N135.7071
135.70701
019PLOT Type N1
126.1891126.189
100
20PLOT Type P141.510
1141.510
1021
PLOT Type Q141.4761
141.47601
022PLOT Type R
141.5251141.525
010
23PLOT Type S141.623
1141.6230
1024
PLOT Type T126.3331
126.33301
025PLOT Type E1-E3
128.1023384.306
120
26PLOT Type E4129.04
1129.041
0027
PLOT Type D1147.16001
147.1601
028PLOT Type E12
129.63601129.636
100
29PLOT Type H18, H19146.6000
2293.22
0030
PLOT Type COMMERCIAL1673.62741
1673.627401
0Total150
22107.357411832
0(ii) Apartments/Shops/Other Buildings:-(a) Status of construction activities in respect of sold/booked apartments.
TypeNumber of apartments booked/ soldWrite or Annex the stage of construction of the booked/ sold apartments in folder C
N/A00
(b) Time schedule of completion of already booked apartments:Start DateN/A
Earlier date of completionN/ARevised date of completion
N/A(c) Time schedule for development of infrastructure:Start Date
01-06-2026Percentage completion Upto the   date of application
0Projected date of completion30-11-2026
(d) Provide further details in the proforma REP-I Part-C-X.(e) Plan of action for completing the Project along with requisite infrastructure.(iii) Status in respect of plotted colony:-
(a)PlotsBooked/sold
Stage of handing over the possession (Write or Annex details)PLOT118
0(b) Schedule for development of Infrastructure:Start Date
01-06-2026Percentage completion95
Projected date of completion30-06-2026(c) Provide further details in the proforma REP-I Part-C-X.
Total 150 Unit (149 Residential Plots And 1 Commercial Plot). 118 Residential Plots Are Sold.(d) Schedule of completing the project and handing over possession of the plots.THE PROMOTER SHALL OBTAIN CC IS ON OR BEFORE 30TH AUGUST, 2027 AND HANDING OVER THE POSSESION ON OR BEFORE 1ST SEPTEMBER, 2027.
(iv) Vehicle parkings details of the project-a) Underground parking0
b) Stilt parking0c) Covered parking
0d) Open parking0
e) Independent garages0(v) Quarterly schedule of development of whole/remaining part of the project:
(a) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureApartments0
Shops0Plots
0Expenditure to be made in each quarter (In Lakhs)Particulars
Expenditure to be made in each quarter ()Apr-June
July-SepOct-DecJan-Mar
(b) InfrastructureExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureRoads & Pavements223.83
Water Supply System270.80Sewerage treatment & garbage disposal
132.13Electricity Supply System0.00
Storm Water Drainage88.81Parks and Playgrounds
34.24Clubhouse/community centres0
Shopping area0Other
160.90Expenditure to be made in each quarter (In Lakhs)Particulars
Year-2026Jan-MarApr-June
July-SepOct-DecRoads & Pavements
1.513.060
Water Supply System00
0Sewerage treatment & garbage disposal0
00Electricity Supply System
000
Storm Water Drainage0.601.21
0Parks and Playgrounds0
00Clubhouse/community centres
000
Shopping area00
0Other0
00Electrical sub station
3.497.08STP
0.702.1291.43
Underground Water Tank0.711.45
Construction of circulation road0.761.52
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - C-X
1.Financial information:ParticularsRemarks, if any
i. No. of Flats/Apartments constructed150149 Residential Plots and 1 Commercial Plot
ii. No. of Flats/ Apartments booked118Residential Plots
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter7674.00197 LakhsValue of Booked Residential Plots
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter7415.08733 LakhsAmount Received for Booked Residential Plots
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter258.91464 LakhsAmount to be received for booked Residential Plots
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter258.91464 LakhsBalance amount for booked Residential Plots
vii. Amount invested in the project upto the date of application10476.68 LakhsLand cost (If any)
3990.11 LakhsApartments0.00 Lakhs
N/AInfrastructure1899.71 Lakhs
EDC/ Taxes Etc.4586.86 Lakhsviii. Balance cost to be incurred for completion of the project and delivery of possession
25.65 Lakhs(a) In respect of existing allottees0.00 Lakhs
(b) In respect of rest of the project25.65 Lakhsix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C0.00 Lakhsx. Total liabilities against the project up-to-date. (Annex details in folder C)
0.00 Lakhs2.Additional information:Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)I. INTERNAL ROADS AND PAVEMENTS
228.40223.83II. WATER SUPPLY SYSTEM
270.80270.80III. STORM WATER DRAINAGE
90.6288.81IV. ELECTRICITY SUPPLY SYSTEM
00V. SEWAGE TREATMENT & GARBAGE DISPOSAL
132.13132.13VI. CLUB HOUSE/COMMUNITY CENTRE
00VII. SCHOOL
00VIII. ANY OTHER
160.90160.90IX. SOLID WASTE COLLECTION & MGMT SYSTEM
00X. CLUBHOUSE
00XI. NEIGHBOURHOOD SHOPPING
00XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
34.2434.24XIII. COVERED PARKING
00XIV. OPEN PARKING
00XV. GARAGES
00XVI. SECURITY SYSTEM
0.000.00XVII. OTHER FACILITIES AS PER PROJECT REPORT
982.62963.35I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - D
Accounts related information:1. Annex copy of the balance sheet of last 3 yearsYes
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
3. Bank account to which the deposits received from apartment buyers will be creditedBank and Branch addressNB BUILDCON PRIVATE LIMITED COLLECTION ACCOUNT
Bank Account number006505007575IFSC code
ICIC0000065MICR code110229008
Branch code00654. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
Naresh Kumar, A6/3,Vasant Vihar,New Delhi 110057.NAKUL YADAV, A 6/3,Vasant Vihar, New Delhi5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)
YesI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - EDetails of the statutory approvals:
1. Annex copies of the following in Folder E:i. Lay out PlanYes
ii. Demarcation PlanYesiii. Zoning Plan
Yesiv. Building PlanNo
Site PlanNoFloor Plan
NoApartment PlansNo
Elevation SectionNoDetail of Permissible FAR
NoDetail of covered area achieved FARNo
2. Annex copies of the following in Folder E:I. ROADS AND PAVEMENT PLANYes
II. Electricity Supply PlanYesIII. WATER SUPPLY PLAN
YesIV. SEWERAGE AND GARBAGE DISPOSAL PLANYes
V. Strom Water DrainageYesVI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY
YesVII. STREET LIGHTING PLANYes
Viii. Parking PlanNo3. Statutory Approvals Status
Statutory ApprovalsStatutory Approvals StatusDate
I. License No 168 Of 2022ALREADY BEEN OBTAINED21-10-2022
II. Layout Cum DemarcationALREADY BEEN OBTAINEDNA
III. Zoning PlanALREADY BEEN OBTAINED06-09-2023
IV. Service Plan EstimatesALREADY BEEN OBTAINED24-02-2023
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________Seal _____________
Date _____________FORM REP-IPart - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)Yes
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)Yes
3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - G
Projects launched by the promoter in last five years: (No Projects)I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - HSPECIFICATION OF CONSTRUCTIONSpecification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEN/A
2WALL FINISHING DETAILSN/A
3KITCHEN DETAILSN/A
4BATHROOM FITTINGSN/A
5WOOD WORK ETCN/A
6DOORS AND WINDOS FRAMESN/A
7GLASS WORKN/A
8ELECTRIC FITTINGSN/A
9CONDUCTING AND WIRING DETAILSN/A
10CUPBOARD DETAILSN/A
11WATER STORAGEN/A
12LIFT DETAILSN/A
13EXTERNAL GLAZINGSN/A
13.1WINDOWS/GLAZINGSN/A
14DOORSN/A
14.1MAIN DOORSN/A
14.2INTERNAL DOORSN/A
15AIR CONDITIONINGN/A
16ELECTRICAL FITTINGSN/A
17CNG PIPE LINEN/A
18PROVISION OF WIFI AND BROADBAND FACILITYN/A
19EXTERNAL FINISHING/COLOUR SCHEMEN/A
20INTERNAL FINISHINGN/A
Specification Unit Wise1 . LIVING/DINING/FOYER/FAMILY LOUNGE1 . 1
FloorN/A1 . 2
WallsN/A1 . 3
CeilingN/A2 . MASTER BEDROOM/DRESSROOM
2 . 1FLOORN/A
2 . 2WALLSN/A
2 . 3CEILINGN/A
2 . 4MODULAR WARDROBESN/A
3 . Master Toilet3 . 1FLOOR
N/A3 . 2WALLS
N/A3 . 3CEILING
N/A3 . 4COUNTERS
N/A3 . 5SANITARY WARE/CP FITTINGS
N/A3 . 6FITTING/FIXTURES
N/A4 . BED ROOMS4 . 1
FloorN/A4 . 2
WallsN/A4 . 3
CeilingN/A4 . 4
WardrobesN/A5 . TOILET
5 . 1FLOORN/A
5 . 2WALLSN/A
5 . 3CEILINGN/A
5 . 4COUNTERSN/A
5 . 5SANITARY WARE/CP FITTINGSN/A
5 . 6FIXTURESN/A
6 . Kitchen6 . 1FLOOR
N/A6 . 2WALLS
N/A6 . 3CEILING
N/A6 . 4COUNTERS
N/A6 . 5FIXTURES
N/A6 . 6KITCHEN APPLIANCES
N/A7 . UTILITY ROOMS/UTILITY BALCONY/TOILET7 . 1
FloorN/A7 . 2
Walls & CeilingN/A7 . 3
ToiletN/A7 . 4
BalconyN/A8 . SIT-OUTS
8 . 1FLOORN/A
8 . 2WALLS & CEILINGN/A
8 . 3RAILINGSN/A
8 . 4FIXTURESN/A
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________List of Uploaded Documents
Sr. No.Document DescriptionDate of Document Upload
View Document1SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN
25-06-2026View Document2
In Case Of Group Housing/ Commercial Sites, A Copy Of The Approved Site Plan25-06-2026View Document
3DEMARCATION PLAN25-06-2026
View Document4CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT
25-06-2026View Document5
In Case Of Plotted Colony, The Latest Layout Plan25-06-2026View Document
6DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.25-06-2026
View Document7DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD
25-06-2026View Document8
Zoning Plan25-06-2026View Document
9COPY OF LICENSE ALONG WITH SCHEDULE OF LAND25-06-2026
View Document10NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
25-06-2026View DocumentI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 2.28 CrAs Per Project Report
Water Supply System₹ 2.71 CrAs Per Project Report
Storm Water Drainage₹ 90.62 lakhAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 1.32 CrAs Per Project Report
Street Lighting₹ 26.55 lakhAs Per Project Report
Security And Fire Fighting₹ 30.6 lakhAs Per Project Report
Playgrounds And Parks₹ 34.24 lakhAs Per Project Report
Any Other₹ 1.61 CrAs Per Project Report
Stp₹ 2.13 CrAs Per Project Report
Underground Water Tank₹ 1.08 CrAs Per Project Report
Electrical Sub Station₹ 5.29 CrAs Per Project Report
Construcation Of Circulation Road₹ 76.07 lakhAs Per Project Report

Statutory approvals

ApprovalStatusDate
License No 168 Of 2022Already Been Obtained21 Oct 2022
Layout Cum DemarcationAlready Been Obtained
Zoning PlanAlready Been Obtained6 Sep 2023
Service Plan EstimatesAlready Been Obtained24 Feb 2023

Specifications (as filed)

Flooring Details Of Various Parts Of HouseN/A
Wall Finishing DetailsN/A
Kitchen DetailsN/A
Bathroom FittingsN/A
Wood Work EtcN/A
Doors And Windos FramesN/A
Glass WorkN/A
Electric FittingsN/A
Conducting And Wiring DetailsN/A
Cupboard DetailsN/A
Water StorageN/A
Lift DetailsN/A
External GlazingsN/A
Windows/GlazingsN/A
DoorsN/A
Main DoorsN/A
Internal DoorsN/A
Air ConditioningN/A
Electrical FittingsN/A
Cng Pipe LineN/A
Provision Of Wifi And Broadband FacilityN/A
External Finishing/Colour SchemeN/A
Internal FinishingN/A

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Gokulam?

This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.