by Nb Buildcon Pvt. Ltd · Sector 7, Sohna, Gurugram
RERA registration
Applied, not granted yet
Applied on
2 Jul 2026
Application status
Physical Docs Received
Project ID
RERA-GRG-2275-2026
Land area
9.443 acres
Estimated cost
₹ 105.02 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
Registration certificate
Not issued yet: the application is being processed by HRERA Gurugram
Project ID
RERA-GRG-2275-2026
Authority
HRERA Gurugram
Project type (as filed)
Ongoing
Project name
Gokulam
Promoter
Nb Buildcon Pvt. Ltd
Promoter’s registered office
48, Basant Lok, Vasant Vihar, New Delhi
CIN
U45201DL2006PTC146913
Site address
Sector 7, Sohna, Gurugram
Sector
Sector 7
Tehsil / District
Sohna / Gurugram
Application submitted
2 Jul 2026
Authority, hearings & orders
Current statusPhysical Docs Received
Next hearingNot Required
Application submitted online
Notice sent to the promoterDeficiency notice and Show cause notice
Land, licence & cost
Land area of the project
9.443 acres
Total licensed area
10.413 acres
Licence
168 OF 2022 dated 21.10.2022 by Director, Town and Country Planning.
FAR permissible / proposed
0 / 0
Estimated project cost
₹ 105.02 Cr
Cost of land
₹ 39.9 Cr
Infrastructure and other structures
₹ 19 Cr
EDC, taxes, levies and other costs
₹ 46.13 Cr
How the land will be used
Use
Sq m
Share
Plots To Be Sold
20,434.277
51.3%
Construction Of Roads
8,283.51
20.8%
Parks And Playgrounds
3,579.85
9%
Electricity Sub-Station
999.57
2.5%
Area To Be Left For Transferring To The Government For Community Services
4,222.49
10.6%
Stp
399.83
1%
Underground Water Tank
199.91
0.5%
Milk And Vegetable Booth
27.11
0.1%
Commercial
1,673.37
4.2%
External services
Service
Provided by
Approval taken
Roads
Yes
WATER SUPPLY
HSVP
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
HSVP
Yes
STORM WATER DRAINAGE
HSVP
Yes
4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
228.40
AS PER PROJECT REPORT
2
Water Supply System
270.80
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
90.62
As Per Project Report
4
ELECTRICITY SUPPLY SYSTEM
0.00
AS PER PROJECT REPORT
5
Sewage Treatment & Garbage Disposal
132.13
AS PER PROJECT REPORT
6
STREET LIGHTING
26.55
As Per Project Report
7
SECURITY AND FIRE FIGHTING
30.60
AS PER PROJECT REPORT
8
Playgrounds And Parks
34.24
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
0.00
As Per Project Report
10
SHOPPING AREA
0.00
AS PER PROJECT REPORT
11
Renewable Energy System
0.00
AS PER PROJECT REPORT
12
SCHOOL
0.00
As Per Project Report
13
HOSPITAL/DISPENSARY
0.00
AS PER PROJECT REPORT
14
Any Other
160.90
AS PER PROJECT REPORT
15
STP
212.90
As Per Project Report
16
UNDERGROUND WATER TANK
108.00
AS PER PROJECT REPORT
17
Electrical Sub Station
528.50
AS PER PROJECT REPORT
18
CONSTRUCATION OF CIRCULATION ROAD
76.07
As Per Project Report
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.
NA
(date)
6. Date of approval of Building Plans
NA
(date)
(i) Details of the plots/apartments in the project:
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Total size of the plots/carpet area of the apartments
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
PLOT Type A
135.000
14
1890
13
1
0
2
PLOT Type B
145.720
4
582.88
0
4
0
3
PLOT Type C
146.199
24
3508.776
11
13
0
4
PLOT Type D
144.960
4
579.84
4
0
0
5
PLOT Type E
131.724
7
922.068
7
0
0
6
PLOT Type F
111.481
20
2229.62
20
0
0
7
PLOT Type G
126.000
12
1512
12
0
0
8
PLOT Type H
150.000
40
6000
38
2
0
9
PLOT Type J1
104.118
1
104.118
1
0
0
10
PLOT Type J2
111.402
1
111.402
1
0
0
11
PLOT Type J3
118.689
1
118.689
1
0
0
12
PLOT Type J4
125.972
1
125.972
1
0
0
13
PLOT Type J5
133.256
1
133.256
1
0
0
14
PLOT Type J6
140.543
1
140.543
1
0
0
15
PLOT Type K
145.170
1
145.17
0
1
0
16
PLOT Type L
142.500
1
142.5
0
1
0
17
PLOT Type M
149.191
1
149.191
1
0
0
18
PLOT Type N
135.707
1
135.707
0
1
0
19
PLOT Type N1
126.189
1
126.189
1
0
0
20
PLOT Type P
141.510
1
141.51
0
1
0
21
PLOT Type Q
141.476
1
141.476
0
1
0
22
PLOT Type R
141.525
1
141.525
0
1
0
23
PLOT Type S
141.623
1
141.623
0
1
0
24
PLOT Type T
126.333
1
126.333
0
1
0
25
PLOT Type E1-E3
128.102
3
384.306
1
2
0
26
PLOT Type E4
129.04
1
129.04
1
0
0
27
PLOT Type D1
147.1600
1
147.16
0
1
0
28
PLOT Type E12
129.6360
1
129.636
1
0
0
29
PLOT Type H18, H19
146.6000
2
293.2
2
0
0
30
PLOT Type COMMERCIAL
1673.6274
1
1673.6274
0
1
0
Total
150
22107.3574
118
32
0
(ii) Apartments/Shops/Other Buildings:-
(a) Status of construction activities in respect of sold/booked apartments.
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
N/A
0
0
(b) Time schedule of completion of already booked apartments:
Start Date
N/A
Earlier date of completion
N/A
Revised date of completion
N/A
(c) Time schedule for development of infrastructure:
Start Date
01-06-2026
Percentage completion Upto the
date of application
0
Projected date of completion
30-11-2026
(d) Provide further details in the proforma REP-I Part-C-X.
(e) Plan of action for completing the Project along with requisite infrastructure.
(iii) Status in respect of plotted colony:-
(a)
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
118
0
(b) Schedule for development of Infrastructure:
Start Date
01-06-2026
Percentage completion
95
Projected date of completion
30-06-2026
(c) Provide further details in the proforma REP-I Part-C-X.
Total 150 Unit (149 Residential Plots And 1 Commercial Plot). 118 Residential Plots Are Sold.
(d) Schedule of completing the project and handing over possession of the plots.
THE PROMOTER SHALL OBTAIN CC IS ON OR BEFORE 30TH AUGUST, 2027 AND HANDING OVER THE POSSESION ON OR BEFORE 1ST SEPTEMBER, 2027.
(iv) Vehicle parkings details of the project-
a) Underground parking
0
b) Stilt parking
0
c) Covered parking
0
d) Open parking
0
e) Independent garages
0
(v) Quarterly schedule of development of whole/remaining part of the project:
(a) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Expenditure to be made in each quarter (
)
Apr-June
July-Sep
Oct-Dec
Jan-Mar
(b) Infrastructure
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
223.83
Water Supply System
270.80
Sewerage treatment & garbage disposal
132.13
Electricity Supply System
0.00
Storm Water Drainage
88.81
Parks and Playgrounds
34.24
Clubhouse/community centres
0
Shopping area
0
Other
160.90
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
1.51
3.06
0
Water Supply System
0
0
0
Sewerage treatment & garbage disposal
0
0
0
Electricity Supply System
0
0
0
Storm Water Drainage
0.60
1.21
0
Parks and Playgrounds
0
0
0
Clubhouse/community centres
0
0
0
Shopping area
0
0
0
Other
0
0
0
Electrical sub station
3.49
7.08
STP
0.70
2.129
1.43
Underground Water Tank
0.71
1.45
Construction of circulation road
0.76
1.52
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - C-X
1.Financial information:
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
150
149 Residential Plots and 1 Commercial Plot
ii. No. of Flats/ Apartments booked
118
Residential Plots
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
7674.00197 Lakhs
Value of Booked Residential Plots
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
7415.08733 Lakhs
Amount Received for Booked Residential Plots
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
258.91464 Lakhs
Amount to be received for booked Residential Plots
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
258.91464 Lakhs
Balance amount for booked Residential Plots
vii. Amount invested in the project upto the date of application
10476.68 Lakhs
Land cost (If any)
3990.11 Lakhs
Apartments
0.00 Lakhs
N/A
Infrastructure
1899.71 Lakhs
EDC/ Taxes Etc.
4586.86 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
25.65 Lakhs
(a) In respect of existing allottees
0.00 Lakhs
(b) In respect of rest of the project
25.65 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0.00 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C)
0.00 Lakhs
2.Additional information:
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
228.40
223.83
II. WATER SUPPLY SYSTEM
270.80
270.80
III. STORM WATER DRAINAGE
90.62
88.81
IV. ELECTRICITY SUPPLY SYSTEM
0
0
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
132.13
132.13
VI. CLUB HOUSE/COMMUNITY CENTRE
0
0
VII. SCHOOL
0
0
VIII. ANY OTHER
160.90
160.90
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
0
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
34.24
34.24
XIII. COVERED PARKING
0
0
XIV. OPEN PARKING
0
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
0.00
0.00
XVII. OTHER FACILITIES AS PER PROJECT REPORT
982.62
963.35
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - D
Accounts related information:
1. Annex copy of the balance sheet of last 3 years
Yes
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.
Yes
3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch address
NB BUILDCON PRIVATE LIMITED COLLECTION ACCOUNT
Bank Account number
006505007575
IFSC code
ICIC0000065
MICR code
110229008
Branch code
0065
4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
Naresh Kumar, A6/3,Vasant Vihar,New Delhi 110057.
NAKUL YADAV, A 6/3,Vasant Vihar, New Delhi
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)
Yes
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - E
Details of the statutory approvals:
1. Annex copies of the following in Folder E:
i. Lay out Plan
Yes
ii. Demarcation Plan
Yes
iii. Zoning Plan
Yes
iv. Building Plan
No
Site Plan
No
Floor Plan
No
Apartment Plans
No
Elevation Section
No
Detail of Permissible FAR
No
Detail of covered area achieved FAR
No
2. Annex copies of the following in Folder E:
I. ROADS AND PAVEMENT PLAN
Yes
II. Electricity Supply Plan
Yes
III. WATER SUPPLY PLAN
Yes
IV. SEWERAGE AND GARBAGE DISPOSAL PLAN
Yes
V. Strom Water Drainage
Yes
VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY
Yes
VII. STREET LIGHTING PLAN
Yes
Viii. Parking Plan
No
3. Statutory Approvals Status
Statutory Approvals
Statutory Approvals Status
Date
I. License No 168 Of 2022
ALREADY BEEN OBTAINED
21-10-2022
II. Layout Cum Demarcation
ALREADY BEEN OBTAINED
NA
III. Zoning Plan
ALREADY BEEN OBTAINED
06-09-2023
IV. Service Plan Estimates
ALREADY BEEN OBTAINED
24-02-2023
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________
Seal _____________
Date _____________
FORM REP-I
Part - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
(Annex a copy in Folder F)
Yes
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)
(Annex a copy in Folder F)
Yes
3. Gist of the important provisions of the Draft Agreement
(Annex a copy in Folder F)
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - G
Projects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - H
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
N/A
2
WALL FINISHING DETAILS
N/A
3
KITCHEN DETAILS
N/A
4
BATHROOM FITTINGS
N/A
5
WOOD WORK ETC
N/A
6
DOORS AND WINDOS FRAMES
N/A
7
GLASS WORK
N/A
8
ELECTRIC FITTINGS
N/A
9
CONDUCTING AND WIRING DETAILS
N/A
10
CUPBOARD DETAILS
N/A
11
WATER STORAGE
N/A
12
LIFT DETAILS
N/A
13
EXTERNAL GLAZINGS
N/A
13.1
WINDOWS/GLAZINGS
N/A
14
DOORS
N/A
14.1
MAIN DOORS
N/A
14.2
INTERNAL DOORS
N/A
15
AIR CONDITIONING
N/A
16
ELECTRICAL FITTINGS
N/A
17
CNG PIPE LINE
N/A
18
PROVISION OF WIFI AND BROADBAND FACILITY
N/A
19
EXTERNAL FINISHING/COLOUR SCHEME
N/A
20
INTERNAL FINISHING
N/A
Specification Unit Wise
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
Floor
N/A
1 . 2
Walls
N/A
1 . 3
Ceiling
N/A
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
N/A
2 . 2
WALLS
N/A
2 . 3
CEILING
N/A
2 . 4
MODULAR WARDROBES
N/A
3 . Master Toilet
3 . 1
FLOOR
N/A
3 . 2
WALLS
N/A
3 . 3
CEILING
N/A
3 . 4
COUNTERS
N/A
3 . 5
SANITARY WARE/CP FITTINGS
N/A
3 . 6
FITTING/FIXTURES
N/A
4 . BED ROOMS
4 . 1
Floor
N/A
4 . 2
Walls
N/A
4 . 3
Ceiling
N/A
4 . 4
Wardrobes
N/A
5 . TOILET
5 . 1
FLOOR
N/A
5 . 2
WALLS
N/A
5 . 3
CEILING
N/A
5 . 4
COUNTERS
N/A
5 . 5
SANITARY WARE/CP FITTINGS
N/A
5 . 6
FIXTURES
N/A
6 . Kitchen
6 . 1
FLOOR
N/A
6 . 2
WALLS
N/A
6 . 3
CEILING
N/A
6 . 4
COUNTERS
N/A
6 . 5
FIXTURES
N/A
6 . 6
KITCHEN APPLIANCES
N/A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
Floor
N/A
7 . 2
Walls & Ceiling
N/A
7 . 3
Toilet
N/A
7 . 4
Balcony
N/A
8 . SIT-OUTS
8 . 1
FLOOR
N/A
8 . 2
WALLS & CEILING
N/A
8 . 3
RAILINGS
N/A
8 . 4
FIXTURES
N/A
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
List of Uploaded Documents
Sr. No.
Document Description
Date of Document Upload
View Document
1
SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN
25-06-2026
View Document
2
In Case Of Group Housing/ Commercial Sites, A Copy Of The Approved Site Plan
25-06-2026
View Document
3
DEMARCATION PLAN
25-06-2026
View Document
4
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT
25-06-2026
View Document
5
In Case Of Plotted Colony, The Latest Layout Plan
25-06-2026
View Document
6
DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
25-06-2026
View Document
7
DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD
25-06-2026
View Document
8
Zoning Plan
25-06-2026
View Document
9
COPY OF LICENSE ALONG WITH SCHEDULE OF LAND
25-06-2026
View Document
10
NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
25-06-2026
View Document
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 2.28 Cr
As Per Project Report
Water Supply System
₹ 2.71 Cr
As Per Project Report
Storm Water Drainage
₹ 90.62 lakh
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 1.32 Cr
As Per Project Report
Street Lighting
₹ 26.55 lakh
As Per Project Report
Security And Fire Fighting
₹ 30.6 lakh
As Per Project Report
Playgrounds And Parks
₹ 34.24 lakh
As Per Project Report
Any Other
₹ 1.61 Cr
As Per Project Report
Stp
₹ 2.13 Cr
As Per Project Report
Underground Water Tank
₹ 1.08 Cr
As Per Project Report
Electrical Sub Station
₹ 5.29 Cr
As Per Project Report
Construcation Of Circulation Road
₹ 76.07 lakh
As Per Project Report
Statutory approvals
Approval
Status
Date
License No 168 Of 2022
Already Been Obtained
21 Oct 2022
Layout Cum Demarcation
Already Been Obtained
Zoning Plan
Already Been Obtained
6 Sep 2023
Service Plan Estimates
Already Been Obtained
24 Feb 2023
Specifications (as filed)
Flooring Details Of Various Parts Of House
N/A
Wall Finishing Details
N/A
Kitchen Details
N/A
Bathroom Fittings
N/A
Wood Work Etc
N/A
Doors And Windos Frames
N/A
Glass Work
N/A
Electric Fittings
N/A
Conducting And Wiring Details
N/A
Cupboard Details
N/A
Water Storage
N/A
Lift Details
N/A
External Glazings
N/A
Windows/Glazings
N/A
Doors
N/A
Main Doors
N/A
Internal Doors
N/A
Air Conditioning
N/A
Electrical Fittings
N/A
Cng Pipe Line
N/A
Provision Of Wifi And Broadband Facility
N/A
External Finishing/Colour Scheme
N/A
Internal Finishing
N/A
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Gokulam?
This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.