by Bhutani Homes Private Limited · M3M City Of Dreams Sector -37
RERA registration
Applied, not granted yet
Applied on
4 Oct 2025
Application status
Return
Project ID
RERA-PKL-1799-2025
Apartments
56 in 14 towers
Plots
14
Completion (as filed)
31 Mar 2027
Estimated cost
₹ 23.65 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
Registration certificate
Not issued yet: the application is being processed by HRERA Panchkula
THE ALLOTED PLOTS ARE FALL IN UNDER THE LAND HAVING LICENSE NO 85 OF 2023 GRANTED BY DTCP HARYANA DATED -18/04/2023 TO UTTIRNA INFRA PROJECT PVT LTD
FAR permissible / proposed
2.64 / 2.64
Estimated project cost
₹ 23.65 Cr
Cost of land
₹ 11.05 Cr
Cost of construction
₹ 12.6 Cr
How the land will be used
Use
Area (as filed)
Share
Land Area To Be Used For Construction Of Apartments
2,099.86
100%
Apartments 56 units · 14 towers
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
94.66
1,019
56
Areas are as filed with HRERA.
Plots 14 plots
Plot size (sq m)
Sq yd
Sq ft
Plots
149.99
179
1,614
14
External services
Service
Provided by
Approval taken
Roads
Yes
WATER SUPPLY
Yes
ELECTRICITY
Yes
Sewage Disposal
Yes
STORM WATER DRAINAGE
Yes
4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
0
Yet To Be Prepared
2
WATER SUPPLY SYSTEM
0
YET TO BE PREPARED
3
Storm Water Drainage
0
YET TO BE PREPARED
4
ELECTRICITY SUPPLY SYSTEM
0
Yet To Be Prepared
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
0
YET TO BE PREPARED
6
Street Lighting
0
YET TO BE PREPARED
7
SECURITY AND FIRE FIGHTING
0
Yet To Be Prepared
8
PLAYGROUNDS AND PARKS
0
YET TO BE PREPARED
9
Club House/Community Centre
0
YET TO BE PREPARED
10
SHOPPING AREA
0
Yet To Be Prepared
11
RENEWABLE ENERGY SYSTEM
0
YET TO BE PREPARED
12
School
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
Yet To Be Prepared
14
ANY OTHER
0
YET TO BE PREPARED
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.
Na
(date)
6. Date of approval of Building Plans
Na
(date)
7. New projects:
i) Likely date of starting the construction work
01-07-2025
ii) Likely date of completing the project
31-03-2027
iii) Sizes of the plots to be offered in the project
Sr. No
Plot Area(In Square Meter)
Number of plots in the project
1
149.99
14
Total
14
iv. Type of apartments to be constructed in the project:
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
94.66
56
14
(vi) Quarterly schedule of development of whole/remaining part of the project:
(c) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
108
29800000
Shops
0
0
Plots
0
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
20500000
15400000
10200000
24700000
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
25400000
Shops
0
Plots
0
(d) Infrastructure
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Expenditure to be made in each quarter (
2027
)
Apr-June
July-Sep
Oct-Dec
Jan-Mar
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - D
Accounts related information:
1. Annex copy of the balance sheet of last 3 years
No
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.
No
3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch address
INDUSIND BANK LTD, SECTOR-07, KARNAL
Bank Account number
251240000000
IFSC code
INDB0002258
MICR code
132234006
Branch code
2258
4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
Bhutani Homes private limited
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - E
Details of the statutory approvals:
1. Annex copies of the following in Folder E:
i. Lay out Plan
Yes
ii. Demarcation Plan
Yes
iii. Zoning Plan
Yes
iv. Building Plan
Yes
Site Plan
Yes
Floor Plan
Yes
Apartment Plans
Yes
Elevation Section
Yes
Detail of Permissible FAR
Yes
Detail of covered area achieved FAR
Yes
2. Annex copies of the following in Folder E:
I. ROADS AND PAVEMENT PLAN
No
II. Electricity Supply Plan
No
III. WATER SUPPLY PLAN
No
IV. SEWERAGE AND GARBAGE DISPOSAL PLAN
No
V. Strom Water Drainage
No
VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY
No
VII. STREET LIGHTING PLAN
No
Viii. Parking Plan
No
3. Statutory Approvals Status
Statutory Approvals
Statutory Approvals Status
Date
I. Approval Of Building Plans
ALREADY BEEN OBTAINED
14-09-2025
II. Approval Of Building Plans
ALREADY BEEN OBTAINED
07-07-2025
III. Approval Of Building Plans
ALREADY BEEN OBTAINED
15-04-2025
IV. Approval Of Building Plans
ALREADY BEEN OBTAINED
14-04-2025
V. Approval Of Building Plans
ALREADY BEEN OBTAINED
12-07-2025
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________
Seal _____________
Date _____________
FORM REP-I
Part - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
(Annex a copy in Folder F)
Yes
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)
(Annex a copy in Folder F)
Yes
3. Gist of the important provisions of the Draft Agreement
(Annex a copy in Folder F)
The total price of Flat along with the parking (if applicable) for residential usage ("Total Price"), other charges, payable by the Allottee(s) for transfer of the Flat in his/her/its favour is as mentioned in Schedule __ hereto.
Explanation:
(1) The Total Price as mentioned above includes the booking amount paid by the Allottee(s) to the Promoter towards the Flat for residential usage;
(2) The Total Price as mentioned above includes Taxes, if any (any taxes/ fees/ charges/ levies etc. which may be levied, in connection with the development/ construction of the Project) paid/ payable by the Promoter up to the date of offer of possession of the Flat for residential usage to the Allottee(s) or the competent authority, as the case may be, after obtaining the necessary approvals from the competent authority for the purpose of such possession:
Provided that, in case there is any change / modification in the taxes/ charges/ fees/ levies etc. the subsequent amount payable by the Allottee(s) to the Promoter shall be increased/ decreased based on such change /modification.
Provided further, if there is any increase in the taxes/ charges/ fees/ levies etc. after the expiry of the scheduled date of completion of the Project as per registration with the Authority, which shall include the extension of registration, if any, granted to the Project by the Authority, as per the Act, the same shall not be charged from the Allottee(s);
(3) The Promoter shall intimate in writing to the Allottee(s), the amount payable as stated in (1) above and the Allottee(s) shall make payment demanded by the Promoter within the time and in the manner specified therein. In addition, the Promoter shall provide to the Allottee(s) the details of the taxes/ fees/ charges/ levies etc. paid or demanded along with the acts/ rules/ notifications together with dates from which such taxes/ fees/ charges/ levies etc. have been imposed or become effective.
(4) The Total Price of the Flat for residential usage includes recovery of price of land, construction of Flat but also of the Common Areas, External Development Charges, taxes/ fees/ levies etc., cost of providing electric wiring, electrical connectivity to the Flat, water line and plumbing, finishing with paint, marbles, tiles, doors, windows, fire detection and firefighting equipment in the Common Areas, maintenance charges, State Infrastructure Development Charges, Infrastructure Augmentation Charges and provision of all specifications to be provided within the Flat.
1.3. The Total Price is escalation-free, save and except increases which the Allottee(s) hereby agrees to pay, due to increase on account of State Infrastructure Development Charges, Infrastructure Augmentation Charges, External Development Charges payable to the Competent Authority/DGTCP/Haryana Shahari Vikas Pradhikaran (HSVP), and/or any other increase in charges which may be levied or imposed by the competent authority from time to time. The Promoter undertakes and agrees that while raising a demand on the Allottee(s) for increase in State Infrastructure Development Charges, Infrastructure Augmentation Charges, External Development Charges, cost/ charges/ fees/ levies etc. imposed by the Competent Authority/DGTCP/HSVP, the Promoter shall give details of the said notification/ order/ rule/ regulation/ justification to that effect along with the demand letter being issued to the Allottee(s), which shall only be applicable on subsequent payments. Provided that if there is any new imposition or increase of any development charges after the expiry of the scheduled date of completion of the Project as per registration with the Authority, which shall include the extension of registration, if any, granted to the Project by the Authority, as per the Act, the same shall not be charged from the Allottee.
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - G
Projects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - H
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
VITRIFIED TILES BOFFO, UDAY, LIBERTA,LATON OR EQUIVALENT.
2
WALL FINISHING DETAILS
ASIAN PAINTS (TRACTOR EMULSION), NEROLAC, BERGER.
3
KITCHEN DETAILS
VITRIFIED TILES BOFFO, UDAY, LIBERTA, LATON OR EQUIVALENT COUNTER TOP RAJASTHAN BLACK GRANITE.
4
BATHROOM FITTINGS
JAQUAR (ESSCO), HINDWARE, CERA OR EQUIVALENT.
5
WOOD WORK ETC
VANITY IN EACH BATHROOM, WARDROBE IN TWO BATHROOMS, ONE IN BED ROOM, TV CONSOLE IN ALL BEDROOMS.
6
DOORS AND WINDOS FRAMES
EXTERIOR
Upvc Window Brands - Veka, Greentech Or Equivalent.
INTERIORS
FLUSH DOOR WITH MICA FINISH BRANDS - MERINO, CENTURY, VIRGO OR EQUIVALENT.
7
GLASS WORK
TOUGHENED GLASS IN WINDOWS BRANDS - SAINT GOBAIN, MICO OR EQUIVALENT.
Framed Mirror In Each Bathroom.
8
ELECTRIC FITTINGS
Switches - Anchor, Polycab, Rr Or Equivalent.
9
CONDUCTING AND WIRING DETAILS
Kei, Rr, Fiabcon Or Equivalent.
10
CUPBOARD DETAILS
Particle Board In Mica Finish - Merino, Century, Virgo Or Equivalent.
11
WATER STORAGE
Pvc Tank Of 1000 L For Each Floor.
12
LIFT DETAILS
Kone , Arcon, Milton Or Equivalent.
13
EXTERNAL GLAZINGS
Upvc Doors & Windows With Toughened Glass - Saint Gobain, Mico Or Equivalent.
13.1
WINDOWS/GLAZINGS
Upvc Windows With Toughened Glass & Glass Railings With Profile - Saint Gobain, Mico Or Equivalent.
14
DOORS
Flush Door Up To 8'-0" Height With Mica Finish Brands - Merino, Century, Virgo Or Equivalent.
14.1
MAIN DOORS
Flush Door Up To 8'-0" Height With Mica Finish Brands - Merino, Century, Virgo Or Equivalent.
14.2
INTERNAL DOORS
Flush Door Up To 8'-0" Height With Mica Finish Brands - Merino, Century, Virgo Or Equivalent.
15
AIR CONDITIONING
Only Pipe Fitting Of A Reputed Brand - Total Line, Malasiya Or Equivalent.
16
ELECTRICAL FITTINGS
Kei, Rr, Fiabcon Or Equivalent.
17
CNG PIPE LINE
Nil
18
PROVISION OF WIFI AND BROADBAND FACILITY
Nil
19
EXTERNAL FINISHING/COLOUR SCHEME
Color Scheme
MONOCHROMES IN GREYS
ASIAN PAINTS (ACE), NEROLAC, BERGER.
20
INTERNAL FINISHING
COLOR SCHEME
Monochromes In Greys
ASIAN PAINTS (TRACTOR EMULSION), NEROLAC, BERGER.
SPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge
1 . 1
FLOOR
Vitrified Tiles 32" X 64" - Boffo, Uday, Liberta, Laton Or Equivalent.
1 . 2
WALLS
Asian Paints (Tractor Emulsion), Nerolac, Berger Or Equivalent.
1 . 3
CEILING
Pop Ceiling - Sakarni, Jb, Jk Or Equivalent.
2 . MASTER BEDROOM/DRESSROOM
2 . 1
Floor
VITRIFIED TILES 32" X 64" - BOFFO, UDAY, LIBERTA, LATON OR EQUIVALENT.
2 . 2
Walls
ASIAN PAINTS (TRACTOR EMULSION), NEROLAC, BERGER OR EQUIVALEANT.
2 . 3
Ceiling
POP CEILING - SAKARNI, JB, JK OR EQUIVALENT.
2 . 4
Modular Wardrobes
NIL
3 . MASTER TOILET
3 . 1
FLOOR
ANTI SKID VITRIFIED TILES 24" X 48" - BOFFO, UDAY, LIBERTA, LATON OR EQUIVALENT.
3 . 2
WALLS
VITRIFIED TILES 24" X 48" UPTO CEILING - BOFFO, UDAY, LIBERTA, LATON OR EQUIVALENT.
3 . 3
CEILING
POP CEILING - SAKARNI, JB, JK OR EQUIVALENT.
3 . 4
COUNTERS
NIL
3 . 5
SANITARY WARE/CP FITTINGS
SANITARY FITTINGS - JAQUAR (ESSCO), HINDWARE, CERA OR EQUIVALENT.
Cp Fittings - Supreme, Finolex, Prince Or Equivalent.
3 . 6
FITTING/FIXTURES
Wardrobe & Vanity Particle Board / Hmr Board In Mica Finish - Merino, Century, Virgo Or Equivalent.
FRAMED MIRROR BATHROOM, GYSER - CROMPTON, RELAXO, BAJAJ OR EQUIVALENT.
4 . BED ROOMS
4 . 1
FLOOR
VITRIFIED TILES 32" X 64" - BOFFO, UDAY, LIBERTA, LATON OR EQUIVALENT.
4 . 2
WALLS
ASIAN PAINTS (TRACTOR EMULSION), NEROLAC, BERGER OR EQUIVALENT.
4 . 3
CEILING
POP CEILING - SAKARNI, JB, JK OR EQUIVALENT.
4 . 4
WARDROBES
NIL
5 . Toilet
5 . 1
FLOOR
Anti Skid Vitrified Tiles 24" X 48" - Boffo, Uday, Liberta, Laton Or Equivalent.
5 . 2
WALLS
Vitrified Tiles 24" X 48" Upto Ceiling - Boffo, Uday, Liberta, Laton Or Equivalent.
5 . 3
CEILING
Pop Ceiling - Sakarni, Jb, Jk Or Equivalent.
5 . 4
COUNTERS
Nil
5 . 5
SANITARY WARE/CP FITTINGS
Sanitary Fittings - Jaquar (Essco), Hindware, Cera Or Equivalent.
CP FITTINGS - SUPREME, FINOLEX, PRINCE OR EQUIVALENT.
5 . 6
Fixtures
WARDROBE & VANITY PARTICLE BOARD / HMR BOARD IN MICA FINISH - MERINO, CENTURY, VIRGO OR EQUIVALENT.
FRAMED MIRROR BATHROOM, GYSER - CROMPTON, RELAXO, BAJAJ OR EQUIVALENT.
6 . Kitchen
6 . 1
FLOOR
Vitrified Tiles 32" X 64" - Boffo, Uday, Liberta, Laton Or Equivalent.
6 . 2
WALLS
Vitrified Tiles 24" X 48" Upto 2'-0" Above Countertop - Boffo, Uday, Liberta, Laton Or Equivalent.
6 . 3
CEILING
Pop Ceiling - Sakarni, Jb, Jk Or Equivalent.
6 . 4
COUNTERS
Rajasthan Black Granite Or Equivalent
6 . 5
FIXTURES
Gyser - Crompton, Relaxo, Umpire Or Equivalent.
EXHAUST FAN - ROTOMAX, BAJAJ, CROMPTON OR EQUIVALENT
6 . 6
Kitchen Appliances
CHIMNEY - INALSA, FABER, GLEN OR EQUIVALENT.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
BALCONY - RAJASTHAN BLACK GRANITE OR EQUIVALENT
7 . 2
WALLS & CEILING
ASIAN PAINTS (TRACTOR EMULSION), NEROLAC, BERGER OR EQUIVALEANT.
7 . 3
TOILET
NIL
7 . 4
BALCONY
FRONT BALCONY - 1200MM WIDE
Rear Balcony - 1050MM Wide
8 . SIT-OUTS
8 . 1
Floor
NIL
8 . 2
Walls & Ceiling
NIL
8 . 3
Railings
NIL
8 . 4
Fixtures
NIL
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
List of Uploaded Documents
Sr. No.
Document Description
Date of Document Upload
View Document
1
COPY OF LICENSE ALONG WITH SCHEDULE OF LAND
27-09-2025
View Document
2
IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN
27-09-2025
View Document
3
Zoning Plan
27-09-2025
View Document
4
DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
04-10-2025
View Document
5
IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
04-10-2025
View Document
6
Non Default Certificate From A Chartered Accountant
04-10-2025
View Document
7
CA CERTIFICATE - A TO H
04-10-2025
View Document
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Statutory approvals
Approval
Status
Date
Approval Of Building Plans
Already Been Obtained
14 Sep 2025
Approval Of Building Plans
Already Been Obtained
7 Jul 2025
Approval Of Building Plans
Already Been Obtained
15 Apr 2025
Approval Of Building Plans
Already Been Obtained
14 Apr 2025
Approval Of Building Plans
Already Been Obtained
12 Jul 2025
Specifications (as filed)
Flooring Details Of Various Parts Of House
Vitrified Tiles Boffo, Uday, Liberta,Laton Or Equivalent.
Wall Finishing Details
Asian Paints (Tractor Emulsion), Nerolac, Berger.
Kitchen Details
Vitrified Tiles Boffo, Uday, Liberta, Laton Or Equivalent Counter Top Rajasthan Black Granite.
Bathroom Fittings
Jaquar (Essco), Hindware, Cera Or Equivalent.
Wood Work Etc
Vanity In Each Bathroom, Wardrobe In Two Bathrooms, One In Bed Room, Tv Console In All Bedrooms.
Doors And Windos Frames
Exterior
Source: HRERA Panchkula, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Envisio Floors?
This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.