Elan The Emperor
by Elan Avenue Limited (Formerly Known As Airmid Developers Limited) · Situated In Sector 106 In The Revenue Estate Of Village Pawala Khusrupur Tehsil Kadipur District Gurugram, Haryana
- RERA registration
- GGM/902/634/2025/05
- Registered on
- 17 Jan 2025
- Valid till
- 30 Sep 2032
- Project ID
- RERA-GRG-1774-2024
- Land area
- 4.827 acres
- Apartments
- 585 in 3 towers
- Completion (as filed)
- 31 Dec 2032
- Estimated cost
- ₹ 2,602.77 Cr
RERA registration
| Registration certificate | GGM/902/634/2025/05, dated 17 Jan 2025 |
|---|---|
| Registration valid till | 30 Sep 2032 |
| Project ID | RERA-GRG-1774-2024 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Elan The Emperor |
| Promoter | Elan Avenue Limited (Formerly Known As Airmid Developers Limited) |
| Promoter’s registered office | 15TH Floor ,Two Horizon Centre , DLF Phase-V, Golf Course Road, Gurugram 122002 |
| CIN | U45400HR2007PLC104996 |
| Site address | Situated In Sector 106 In The Revenue Estate Of Village Pawala Khusrupur Tehsil Kadipur District Gurugram, Haryana |
| Sector | Sector 106 |
| Tehsil / District | Kadipur St / Gurugram |
| Construction start (as filed) | 1 Feb 2025 |
| Completion (as filed) | 31 Dec 2032 |
| Application submitted | 11 Dec 2024 |
Authority, hearings & orders
- Application submitted online
- Notice sent to the promoter By hand
-
Hearing
Examination By Authority View order
Proceedings
Due to gazetted holiday, the matter is adjourned and to come up on 08.01.2025 at 03:00 PM.
-
Hearing
Approved And Ready For Certificate Issuing Process
Proceedings
Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the case. Sh. Sumit Chaudhry (AR) is present on behalf of the promoter and states that late fee is not applicable on them, as the building plans for first phase comprising of 08 Nos. of towers on land admeasuring 12.767 acres out of the total licensed land i.e., 24.10 acres were approved by DTCP, Haryana vide Memo No. ZP-1629/PA(DK)/2022/32388 on 26.10.2022 and the remaining area was shown as future development. Thereafter, revision of building plans (phase 2 and 3) was approved by DTCP vide memo no ZP-1629-III/SD(RD)/2024/39072 only on 10.12.2024. No building plans for this part was earlier approved. Further, while approving the project namely “Elan The Presidential” vide RC no 101 of 2022 dated 21.11.2022 late fee was imposed by the Authority and the promoter had submitted the late fee in the Authority under protest. Thereafter, the promoter has approached the Hon’ble HREAT on 17.10.2023 to challenge the late fee imposed. In this regard, an order has been pronounced by Haryana Real Estate Appellate Tribunal, Haryana on 07 January 2025 in favour of M/S Elan Avenue Limited by allowing the appeal in appeal no 3 - MT of 2024 and setting aside the imposition of late fee of Rs. 1,31,21,352/-. Same has been ordered to be refunded to the appellant as done in the case of ‘Elan Imperial’. The AR further states that they have submitted the BG amounting to Rs 1,93,00,000/- vide BG no 002BG03250060001 dated 06.01.2025 of Yes Bank to DTCP on 07.01.2025 to release the approved SPE and the EC for the said project has been approved in the meeting of SEAC. The promoter has submitted the 2/3rd consents of the existing allottees in the Authority and random confirmation of consents submitted by the promoter has also been done by the concerned AEE. Further, a public notice was also published in 3 three newspapers on 25.12.2024 regarding revision in the building plans against which no complaints has been received in the Authority. This is without prejudice to the rights of the allottees who have not given their consent under section 14 of the Act, 2016. Keeping in view the fact that, only license for developing group housing colony was obtained by the promoter and no further approvals such as building plans of the phase 2 and 3 etc. to start developing the proposed real estate project were obtained by the promoter, the project cannot be categorized as ‘On going” project in view of advice of AG, Haryana sought in respect of Group Housing Colony namely “GH 63” located at Sector-63, Gurugram regarding the ongoing project. The first building plans i.e., for phase-1 were approved by DTCP, Haryana vide Memo No. ZP-1629/PA(DK)/2022/32388 on 26.10.2022 wherein the remaining area was shown as future development and revised building plans (phase 2 and 3) were approved by DTCP, Haryana vide memo no ZP-1629-III/SD(RD)/2024/39072 on 10.12.2024. Further Hon’ble HREAT has also allowed the appeal on 07.01.2025 of Elan Avenue Ltd. Vs Haryana Real Estate Regulatory Authority, Gurugram in appeal no 3 - MT of 2024 and set aside the imposition of late fee amounting to Rs. 1,31,21,352/- and directed to refund to the appellant i.e., M/s Elan Avenue Ltd. which be put up on file separately. Approved as proposed. The promoter has already submitted the BG of Rs 1,93,00,000/- to DTCP on recommendation of Chief Engineer, HSVP and approved SPE will be submitted within two months. The EC has been approved in the meeting of SEAC on 13.12.2024 and a BG/DD of Rs. 25 lakh is being submitted for final approval of EC within four months. The RC shall be issued after submission of corrections in form A-H and DPI along with the BG/DD as per above.
- Registration granted GGM/902/634/2025/05
- Certificate uploaded RC Uploaded
- Registration valid till
Land, licence & cost
| Land area of the project | 4.827 acres |
|---|---|
| Total licensed area | 24.1 acres |
| Licence | 80 of 2012 dated 17/08/2012 valid till 16/08/2029 issued by DTCP |
| FAR permissible / proposed | 3.69 / 3.69 |
| Estimated project cost | ₹ 2,602.77 Cr |
| Cost of land | ₹ 15.34 Cr |
| Cost of construction | ₹ 1,759.5 Cr |
| Infrastructure and other structures | ₹ 80.05 Cr |
| EDC, taxes, levies and other costs | ₹ 747.88 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 1.3069 | 27.1% |
| Construction Of Roads | 1.964 | 40.7% |
| Parks And Playgrounds | 1.306 | 27.1% |
| Vehicle Parkings | 0.25 | 5.2% |
Apartments 585 units · 3 towers
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 214.49 | 2,309 | 225 |
| Apartment/Shops/Other Buildings | 215.43 | 2,319 | 114 |
| Apartment/Shops/Other Buildings | 342.39 | 3,685 | 6 |
| Apartment/Shops/Other Buildings | 343.33 | 3,696 | 3 |
| Apartment/Shops/Other Buildings | 282.32 | 3,039 | 150 |
| Apartment/Shops/Other Buildings | 283.91 | 3,056 | 76 |
| Apartment/Shops/Other Buildings | 467.71 | 5,034 | 4 |
| Apartment/Shops/Other Buildings | 469.32 | 5,052 | 2 |
| Apartment/Shops/Other Buildings | 20.53 | 221 | 1 |
| Apartment/Shops/Other Buildings | 20.63 | 222 | 2 |
| Apartment/Shops/Other Buildings | 20.56 | 221 | 2 |
Areas are as filed with HRERA.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | ALREADY CONNECTED | Yes |
| Water Supply | GMDA | Yes |
| Electricity | DHBVN | Yes |
| Sewage Disposal | GMDA | Yes |
| Storm Water Drainage | GMDA | Yes |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 11.86 Cr | As Per Project Report |
| Water Supply System | ₹ 4.74 Cr | As Per Project Report |
| Storm Water Drainage | ₹ 2.37 Cr | As Per Project Report |
| Electricity Supply System | ₹ 1.66 Cr | As Per Project Report |
| Sewage Treatment & Garbage Disposal | ₹ 2.37 Cr | As Per Project Report |
| Street Lighting | ₹ 2.85 Cr | As Per Project Report |
| Security And Fire Fighting | ₹ 4.74 Cr | As Per Project Report |
| Playgrounds And Parks | ₹ 1.19 Cr | As Per Project Report |
| Renewable Energy System | ₹ 2.37 Cr | As Per Project Report |
| Parking | ₹ 5.22 Cr | As Per Project Report |
| Underground Water Tank | ₹ 1.42 Cr | As Per Project Report |
| Rain Water Harvesting | ₹ 2.37 Cr | As Per Project Report |
| Electrical Sub Station | ₹ 9.49 Cr | As Per Project Report |
| Electrification Cost | ₹ 11.86 Cr | As Per Project Report |
| Circulation Road | ₹ 2.5 Cr | As Per Project Report |
| Stp | ₹ 13.04 Cr | As Per Project Report |
| Electrification Cost | ₹ 11.86 Cr | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Building Plan | Already Been Obtained | 10 Dec 2024 |
| Assurance Of Storm Water | Already Been Obtained | 16 Sep 2022 |
| License | Already Been Obtained | 17 Aug 2012 |
| Electrical Load | Already Been Obtained | 13 Sep 2024 |
| Mining Permission | Already Been Obtained | 2 Nov 2023 |
| Assurance Of Sewerage Connection | Already Been Obtained | 16 Sep 2024 |
| Assurance Of Water Supply | Already Been Obtained | 24 Sep 2024 |
| Service Estimates & Plan | Applied For But Yet To Receive | 18 Nov 2024 |
| Enviornment Clearence | Applied For But Yet To Receive | 20 Sep 2024 |
| Fire Scheme Approval | Applied For But Yet To Receive | 20 Dec 2024 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Marble, Engineered Wooden Flooring, Vitrified Tile, Epoxy Paint Flooring |
|---|---|
| Wall Finishing Details | Vitrified Tile |
| Kitchen Details | Vitrified Tile, Premium Acrylic Emulsion, Full Height Windows- Aluminium Powder Coated Sections |
| Bathroom Fittings | Vitrified Tile |
| Wood Work Etc | No |
| Doors And Windos Frames | Full Height Windows- Aluminium Poder Coated Sections And Wooden Frame With Flush Door With Veneer Finish (On Both Sides) & Architraves |
| Glass Work | Full Height Windows- Aluminium Poder Coated Sections |
| Electric Fittings | Led, Switch Board-Moduler, Conduit-Heavy Duty |
| Conducting And Wiring Details | Heavy Duty , Modular |
| Water Storage | Yes |
| Lift Details | 3 Flats Per Floor, 4 Lifts Per Floor |
| External Glazings | Extranl Grade Texture Paint |
| Windows/Glazings | Full Height Windows- Aluminium Poder Coated Sections |
| Doors | Wooden Frame With Flush Door With Laminate Finish (On Both Sides) & Architraves |
| Main Doors | Wooden Frame With Flush Door With Veneer Finish (On Both Sides) & Architraves |
| Internal Doors | Wooden Frame With Flush Door With Laminate Finish (On Both Sides) & Architraves |
| Air Conditioning | Variable Rate Flow System |
| Electrical Fittings | Heavy Duty Conduting Modular Switches, C Curve Mcb |
| Cng Pipe Line | Yes |
| External Finishing/Colour Scheme | Extranl Grade Texture Paint |
| Internal Finishing | Premium Acrylic Emulsion |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.