Registration validHRERA Gurugram

Elan The Emperor

by Elan Avenue Limited (Formerly Known As Airmid Developers Limited) · Situated In Sector 106 In The Revenue Estate Of Village Pawala Khusrupur Tehsil Kadipur District Gurugram, Haryana

RERA registration
GGM/902/634/2025/05
Registered on
17 Jan 2025
Valid till
30 Sep 2032
Project ID
RERA-GRG-1774-2024
Land area
4.827 acres
Apartments
585 in 3 towers
Completion (as filed)
31 Dec 2032
Estimated cost
₹ 2,602.77 Cr

RERA registration

Registration certificateGGM/902/634/2025/05, dated 17 Jan 2025
Registration valid till30 Sep 2032
Project IDRERA-GRG-1774-2024
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameElan The Emperor
PromoterElan Avenue Limited (Formerly Known As Airmid Developers Limited)
Promoter’s registered office15TH Floor ,Two Horizon Centre , DLF Phase-V, Golf Course Road, Gurugram 122002
CINU45400HR2007PLC104996
Site addressSituated In Sector 106 In The Revenue Estate Of Village Pawala Khusrupur Tehsil Kadipur District Gurugram, Haryana
SectorSector 106
Tehsil / DistrictKadipur St / Gurugram
Construction start (as filed)1 Feb 2025
Completion (as filed)31 Dec 2032
Application submitted11 Dec 2024

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Notice sent to the promoter By hand
  3. Hearing Examination By Authority View order
    Proceedings

    Due to gazetted holiday, the matter is adjourned and to come up on 08.01.2025 at 03:00 PM.

  1. Hearing Approved And Ready For Certificate Issuing Process
    Proceedings

    Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the case. Sh. Sumit Chaudhry (AR) is present on behalf of the promoter and states that late fee is not applicable on them, as the building plans for first phase comprising of 08 Nos. of towers on land admeasuring 12.767 acres out of the total licensed land i.e., 24.10 acres were approved by DTCP, Haryana vide Memo No. ZP-1629/PA(DK)/2022/32388 on 26.10.2022 and the remaining area was shown as future development. Thereafter, revision of building plans (phase 2 and 3) was approved by DTCP vide memo no ZP-1629-III/SD(RD)/2024/39072 only on 10.12.2024. No building plans for this part was earlier approved. Further, while approving the project namely “Elan The Presidential” vide RC no 101 of 2022 dated 21.11.2022 late fee was imposed by the Authority and the promoter had submitted the late fee in the Authority under protest. Thereafter, the promoter has approached the Hon’ble HREAT on 17.10.2023 to challenge the late fee imposed. In this regard, an order has been pronounced by Haryana Real Estate Appellate Tribunal, Haryana on 07 January 2025 in favour of M/S Elan Avenue Limited by allowing the appeal in appeal no 3 - MT of 2024 and setting aside the imposition of late fee of Rs. 1,31,21,352/-. Same has been ordered to be refunded to the appellant as done in the case of ‘Elan Imperial’. The AR further states that they have submitted the BG amounting to Rs 1,93,00,000/- vide BG no 002BG03250060001 dated 06.01.2025 of Yes Bank to DTCP on 07.01.2025 to release the approved SPE and the EC for the said project has been approved in the meeting of SEAC. The promoter has submitted the 2/3rd consents of the existing allottees in the Authority and random confirmation of consents submitted by the promoter has also been done by the concerned AEE. Further, a public notice was also published in 3 three newspapers on 25.12.2024 regarding revision in the building plans against which no complaints has been received in the Authority. This is without prejudice to the rights of the allottees who have not given their consent under section 14 of the Act, 2016. Keeping in view the fact that, only license for developing group housing colony was obtained by the promoter and no further approvals such as building plans of the phase 2 and 3 etc. to start developing the proposed real estate project were obtained by the promoter, the project cannot be categorized as ‘On going” project in view of advice of AG, Haryana sought in respect of Group Housing Colony namely “GH 63” located at Sector-63, Gurugram regarding the ongoing project. The first building plans i.e., for phase-1 were approved by DTCP, Haryana vide Memo No. ZP-1629/PA(DK)/2022/32388 on 26.10.2022 wherein the remaining area was shown as future development and revised building plans (phase 2 and 3) were approved by DTCP, Haryana vide memo no ZP-1629-III/SD(RD)/2024/39072 on 10.12.2024. Further Hon’ble HREAT has also allowed the appeal on 07.01.2025 of Elan Avenue Ltd. Vs Haryana Real Estate Regulatory Authority, Gurugram in appeal no 3 - MT of 2024 and set aside the imposition of late fee amounting to Rs. 1,31,21,352/- and directed to refund to the appellant i.e., M/s Elan Avenue Ltd. which be put up on file separately. Approved as proposed. The promoter has already submitted the BG of Rs 1,93,00,000/- to DTCP on recommendation of Chief Engineer, HSVP and approved SPE will be submitted within two months. The EC has been approved in the meeting of SEAC on 13.12.2024 and a BG/DD of Rs. 25 lakh is being submitted for final approval of EC within four months. The RC shall be issued after submission of corrections in form A-H and DPI along with the BG/DD as per above.

  2. Registration granted GGM/902/634/2025/05
  3. Certificate uploaded RC Uploaded
  1. Registration valid till

Land, licence & cost

Land area of the project4.827 acres
Total licensed area24.1 acres
Licence80 of 2012 dated 17/08/2012 valid till 16/08/2029 issued by DTCP
FAR permissible / proposed3.69 / 3.69
Estimated project cost₹ 2,602.77 Cr
Cost of land₹ 15.34 Cr
Cost of construction₹ 1,759.5 Cr
Infrastructure and other structures₹ 80.05 Cr
EDC, taxes, levies and other costs₹ 747.88 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments1.306927.1%
Construction Of Roads1.96440.7%
Parks And Playgrounds1.30627.1%
Vehicle Parkings0.255.2%

Apartments 585 units · 3 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings214.492,309225
Apartment/Shops/Other Buildings215.432,319114
Apartment/Shops/Other Buildings342.393,6856
Apartment/Shops/Other Buildings343.333,6963
Apartment/Shops/Other Buildings282.323,039150
Apartment/Shops/Other Buildings283.913,05676
Apartment/Shops/Other Buildings467.715,0344
Apartment/Shops/Other Buildings469.325,0522
Apartment/Shops/Other Buildings20.532211
Apartment/Shops/Other Buildings20.632222
Apartment/Shops/Other Buildings20.562212

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsALREADY CONNECTEDYes
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 11.86 CrAs Per Project Report
Water Supply System₹ 4.74 CrAs Per Project Report
Storm Water Drainage₹ 2.37 CrAs Per Project Report
Electricity Supply System₹ 1.66 CrAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 2.37 CrAs Per Project Report
Street Lighting₹ 2.85 CrAs Per Project Report
Security And Fire Fighting₹ 4.74 CrAs Per Project Report
Playgrounds And Parks₹ 1.19 CrAs Per Project Report
Renewable Energy System₹ 2.37 CrAs Per Project Report
Parking₹ 5.22 CrAs Per Project Report
Underground Water Tank₹ 1.42 CrAs Per Project Report
Rain Water Harvesting₹ 2.37 CrAs Per Project Report
Electrical Sub Station₹ 9.49 CrAs Per Project Report
Electrification Cost₹ 11.86 CrAs Per Project Report
Circulation Road₹ 2.5 CrAs Per Project Report
Stp₹ 13.04 CrAs Per Project Report
Electrification Cost₹ 11.86 CrAs Per Project Report

Statutory approvals

ApprovalStatusDate
Building PlanAlready Been Obtained10 Dec 2024
Assurance Of Storm WaterAlready Been Obtained16 Sep 2022
LicenseAlready Been Obtained17 Aug 2012
Electrical LoadAlready Been Obtained13 Sep 2024
Mining PermissionAlready Been Obtained2 Nov 2023
Assurance Of Sewerage ConnectionAlready Been Obtained16 Sep 2024
Assurance Of Water SupplyAlready Been Obtained24 Sep 2024
Service Estimates & PlanApplied For But Yet To Receive18 Nov 2024
Enviornment ClearenceApplied For But Yet To Receive20 Sep 2024
Fire Scheme ApprovalApplied For But Yet To Receive20 Dec 2024

Specifications (as filed)

Flooring Details Of Various Parts Of HouseMarble, Engineered Wooden Flooring, Vitrified Tile, Epoxy Paint Flooring
Wall Finishing DetailsVitrified Tile
Kitchen DetailsVitrified Tile, Premium Acrylic Emulsion, Full Height Windows- Aluminium Powder Coated Sections
Bathroom FittingsVitrified Tile
Wood Work EtcNo
Doors And Windos FramesFull Height Windows- Aluminium Poder Coated Sections And Wooden Frame With Flush Door With Veneer Finish (On Both Sides) & Architraves
Glass WorkFull Height Windows- Aluminium Poder Coated Sections
Electric FittingsLed, Switch Board-Moduler, Conduit-Heavy Duty
Conducting And Wiring DetailsHeavy Duty , Modular
Water StorageYes
Lift Details3 Flats Per Floor, 4 Lifts Per Floor
External GlazingsExtranl Grade Texture Paint
Windows/GlazingsFull Height Windows- Aluminium Poder Coated Sections
DoorsWooden Frame With Flush Door With Laminate Finish (On Both Sides) & Architraves
Main DoorsWooden Frame With Flush Door With Veneer Finish (On Both Sides) & Architraves
Internal DoorsWooden Frame With Flush Door With Laminate Finish (On Both Sides) & Architraves
Air ConditioningVariable Rate Flow System
Electrical FittingsHeavy Duty Conduting Modular Switches, C Curve Mcb
Cng Pipe LineYes
External Finishing/Colour SchemeExtranl Grade Texture Paint
Internal FinishingPremium Acrylic Emulsion

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Elan The Emperor?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.