ATS Triumph Villas
by Greatvalue Hpl Infratech Private Limited · Village - Dhanwapur, Sector -104, Gurugram
- RERA registration
- GGM/1051/783/2026/23
- Registered on
- 20 Mar 2026
- Valid till
- 15 Dec 2028
- Project ID
- RERA-GRG-2073-2025
- Land area
- 1.63 acres
- Apartments
- 19 in 15 towers
- Completion (as filed)
- 31 Dec 2028
- Estimated cost
- ₹ 142.35 Cr
RERA registration
| Registration certificate | GGM/1051/783/2026/23, dated 20 Mar 2026 |
|---|---|
| Registration valid till | 15 Dec 2028 |
| Project ID | RERA-GRG-2073-2025 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | ATS Triumph Villas |
| Promoter | Greatvalue Hpl Infratech Private Limited |
| Promoter’s registered office | ATS Tower, Plot No. 16, Sector-135, Noida, Gautam Budh, Nagar Up. 201305 |
| CIN | U70100DL2010PTC206543 |
| Site address | Village - Dhanwapur, Sector -104, Gurugram |
| Sector | Sector 104 |
| Tehsil / District | Gurgaon / Gurugram |
| Layout plan approved | 19 Dec 2025 |
| Building plans approved | 19 Dec 2025 |
| Construction start (as filed) | 1 Jan 2026 |
| Completion (as filed) | 31 Dec 2028 |
| Application submitted | 22 Dec 2025 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
- Hearing Examination By Authority
- Hearing Adjournment
-
Hearing
Approved And Ready For Certificate Issuing Process View order
Proceedings
Ms. Nikita Mittal, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the project. Sh. Rajeev Gupta (Sr. VP), Sh. Narendra Kumar (Manager), Sh. Praveen Verma (Sr. Manager), Sh. Anuj Mittal (Asst. Manager) are present on behalf of the promoter. The Authorized Representative of the promoter submits that they have applied for Phase-2 admeasuring 1.63 acres consisting of 19 no. of villas for which phasing plan has been obtained from DTCP vide Memo No. ZP-760/SD(RD)/2025/35552 dated 09.09.2025 and revised building plan for Phase-2 has been obtained vide Memo No. ZP-760/SD(RD)/2025/48150 dated 19.12.2025 valid upto 18.12.2027 and has accordingly submitted an application for registration under Section 4 of the Act, 2016 for Phase-II on 24.12.2025. Meanwhile, OC has been obtained for Phase-1 (Block A, B, C & D), Phase-3 (Community & Convenient Shopping) and EWS Block vide Memo no. ZP-760/AD(RA)/2019/12813 dated 20.05.2019 and has not been registered with the Authority. It was further submitted that no revisions have been made in the phases for which OC’s have been obtained, whereas the revised building plan pertains only to Phase-II which was approved on 19.12.2025. Further, the AR states that no sale has been made in the phase II i.e., the phase which is applied for the registration under the present application and thus, consent as per section 14(2)(ii) of the Act is not required. In this regard, the promoter is directed to submit a notarized affidavit sworn by the Managing Director of the promoter company. Meanwhile, the promoter has submitted an undertaking that the road access permission shall be submitted before seeking completion certificate. A condition to the same effect shall be incorporated in the registration certificate. The Authorized Representative of the promoter submits that presently, the revised Environment clearance, revised Fire Scheme Approval and revised Approved service plans and estimates are under process and the said approvals have not yet been obtained as on date. Further, the AR of the promoter undertakes to obtain and submit:i. The Approved Environmental Clearance within 6 months from the date of grant of registration, andii. The Fire Scheme Approval and Approved Service Plans and Estimates within 4 months from the date of grant of registration.Further, he undertakes to submit three Demand Drafts / Bank Guarantees amounting to Rs. 25 lakhs each, as a security deposit for timely compliance with the above requirements. It is also expressly undertaken that in the event of failure to obtain and submit the aforesaid approvals within the stipulated time frames, the said security amount(s) shall be liable to be forfeited by the Authority.The Authority has taken note of the submissions made by the Authorized Representative of the promoter regarding the non-availability of the aforesaid statutory approvals as on date. In view of the above, and in the interest of regulatory compliance, the Authority hereby directs that the promoter shall submit three separate Demand Drafts / Bank Guarantees, each amounting to Rs. 25,00,000/- (Rupees Twenty-Five Lakhs only), in favour of the Authority, as security amounts for timely submission of the following approvals:a. Environmental Clearance: within 6 months from the date of grant of registration;b. Fire Scheme Approval: within 4 months from the date of grant of registration; and c. Approved Service Plans and Estimates: within 4 months from the date of grant of registration.In the event of non-submission of any of the above approvals within the prescribed time frames, the corresponding security amount shall stand forfeited by the Authority, and such failure may also attract additional regulatory action as permissible under the Act of 2016, rules and regulations made thereunder. An objection against a public notice has been received in the Authority submitted by Sh. SK Singh dated 13.01.2026 whereas none appeared on the behalf of complainant despite waiting sufficiently. The Authority observes that the objections raised by him have already been delineated by the authority hereinabove as the phasing of the project has been approved by the DTCP vide Memo No. ZP-760/SD(RD)/2025/35552 dated 09.09.2025 and as per explanation to section 3 of the Act, a real estate project can be developed in phases and every such phase is considered as a stand alone real estate project; with respect to Environmental Clearance, Fire scheme approval as well as service plans and estimates, the decision has been taken by the Authority hereinabove; With respect to violation of section 14(2)(ii) of the Act, the promoter has stated that there in no change in the over all area of the project except changes in phase II wherein no third part rights have been created till date and the promoter has already been directed to submit an affidavit on the basis of the undertaking as stated and recorded hereinabove. As per section 14(1) of the Act, the promoter is under an obligation to develop and construct the project in accordance with the approved sanctioned plans, lay out plans and specifications approved by the competent authorities. In case of any deviation from the sanctioned plans, the aggrieved may approach the concerned court/department of appropriate jurisdiction. Further, it is observed that the documents as required under section 4 of the Act read with rule 3 and 4 of the Rules, 2017 has been submitted by the promoter except deficiencies as mentioned above at Sr. No. 31 and such deficiencies will also be rectified prior to the issuance of the registration certificate. It is clarified that for any individual grievance, a separate complaint may be filed by the aggrieved as per the applicable law. Thus, no ground is made out for not allowing the present application for registration under section 4 of the Act. Approved as proposed subject to rectification of deficiencies mentioned above at Sr. No. 31. The Registration Certificate shall be issued after submission of remaining deficiencies mentioned above at Sr. No. 31 including deficit fee, corrections in A-H form, Online DPI and submission of three BG/DD of Rs. 25 lakhs each for submission of Approved Environment Clearance, Fire Scheme approval and approved Service plan and Estimates within the timeframe mentioned above.
- Registration granted GGM/1051/783/2026/23
- Certificate uploaded RC Uploaded
- Registration valid till
Land, licence & cost
| Land area of the project | 1.63 acres |
|---|---|
| Total licensed area | 14.093 acres |
| Licence | License -1 63 of 2011 (15.07.2027) |
| FAR permissible / proposed | 8986.23 / 1.362 |
| Estimated project cost | ₹ 142.35 Cr |
| Cost of land | ₹ 7.47 Cr |
| Cost of construction | ₹ 76.03 Cr |
| EDC, taxes, levies and other costs | ₹ 58.85 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 0.9 | 55.2% |
| Construction Of Roads | 0.27 | 16.6% |
| Landscaping | 0.15 | 9.2% |
| Green | 0.31 | 19% |
Apartments 19 units · 15 towers
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 451.97 | 4,865 | 4 |
| Apartment/Shops/Other Buildings | 458.93 | 4,940 | 15 |
Areas are as filed with HRERA.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | GMDA | Yes |
| Water Supply | GMDA | Yes |
| Electricity | DHBVN | Yes |
| Sewage Disposal | GMDA | Yes |
| Storm Water Drainage | GMDA | Yes |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 19.77 lakh | As Per Project Report |
| Landscape Area | ₹ 18.25 lakh | As Per Project Report |
| Green Area | ₹ 36.75 lakh | As Per Project Report |
| Internal Approach Road To Villas Area | ₹ 80 lakh | As Per Project Report |
| Pathway Along Internal Roads | ₹ 40 lakh | As Per Project Report |
| External Twentry Four Mtr Wide Road Construction | ₹ 1 Cr | As Per Project Report |
| Laying Of External Water Supply Line From Gate Till GMDA Trunk Line | ₹ 63 lakh | As Per Project Report |
| Pump Room For Supply Of Water To Villas And Including Its Lines | ₹ 70 lakh | As Per Project Report |
| Laying Of Sewer Line From Gate Till GMDA Trunk Line | ₹ 70 lakh | As Per Project Report |
| Laying Of Internal Sewer Line From Stp | ₹ 60 lakh | As Per Project Report |
| Proportionate Cost Of Gewerage Treatment Plant | ₹ 70 lakh | As Per Project Report |
| Proportionate Cost Of Garbage Disposal | ₹ 15 lakh | As Per Project Report |
| Electricity Supply System Thirty Three Kv Switching Station | ₹ 3.5 Cr | As Per Project Report |
| Cpcb Compliant Dg Sets | ₹ 2.5 Cr | As Per Project Report |
| Laying Of Storm Water Drainage Line From Gate Till GMDA Trunk Line | ₹ 15 lakh | As Per Project Report |
| Park And Playgrounds | ₹ 60 lakh | As Per Project Report |
| Club House Community Center | ₹ 1 Cr | As Per Project Report |
| Swimming Pool In Club | ₹ 60 lakh | As Per Project Report |
| Basketball Court | ₹ 35 lakh | As Per Project Report |
| Tennis Court | ₹ 35 lakh | As Per Project Report |
| Irrigation Line For Green Area | ₹ 50 lakh | As Per Project Report |
| Shopping Area Propionate Cost | ₹ 50 lakh | As Per Project Report |
| Boundary Wall And Entrance Gate And Security System | ₹ 40 lakh | As Per Project Report |
| Misc And Other Expanses Such As Finance Cost Interest Admin Cost Sales And Marketing Cost Etc | ₹ 24 Cr | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| License 63 Of 2011 | Already Been Obtained | 16 Jul 2011 |
| License 10 Of 2012 | Already Been Obtained | 3 Feb 2012 |
| Environment Clearance | Already Been Obtained | 17 Jun 2013 |
| Forest Noc | Already Been Obtained | 7 Aug 2012 |
| Phasing Plan Approval Letter | Already Been Obtained | 9 Sep 2025 |
| Building Plan Sanction Leteer Br-III | Already Been Obtained | 19 Dec 2025 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Imported Marble Flooring In, Master Bed Room, Living,Dining,Lobby,Family Lounge Main Staircase And Landing: Premium Wooden Flooring In Rest Of Bedrooms: Premium Vitrified Tiles In Kitchen . Vetrified Tiles In Servant Room,Imported Marble In Master's Toilet And Premium Ceramic Tiles In Rest Of The Toilets.balconies And Utility Finished With Anti Skid Ceramic Tile Flooring. |
|---|---|
| Wall Finishing Details | Premium Ceramic Tiles Upto Required Height In Toilets, Imported Tiles Upto 600MM Height Above Kitchen Counter. |
| Kitchen Details | Kitchen Counter Finished With Pre-Polished Quartz Stones. Premium Modular Cabinets Along With Appropriate Finish. Hob & Chimney Will Be Provided. |
| Bathroom Fittings | Premium Sanitary Fixtures, Premium Chrome Plated Fittings. |
| Wood Work Etc | Main Entrance Door As Engineered Door With Polished Wood Veneer And Solid Wood/ Timber Frame.all Internal Doors Skin/ Flush Doors-Polished/ Enamel Painted; Stainless Steel/ Brass Finished Hardware Fittings And Locks Of Branded Makes. Door Frames And Window Panels Of Seasoned Hardwood/ Aluminium/ Upvc Sections. |
| Doors And Windos Frames | Main Entrance Door As Engineered Door With Polished Wood Veneer And Solid Wood/ Timber Frame.all Internal Doors Skin/ Flush Doors-Polished/ Enamel Painted; Stainless Steel/ Brass Finished Hardware Fittings And Locks Of Branded Makes. Door Frames And Window Panels Of Seasoned Hardwood/ Aluminium/ Upvc Sections. |
| Electric Fittings | All Electrical Wiring In Concealed Conduits.provision For Adaquate Light & Power Points, Telephone, T.v Outlet In Drawing Dining And All Bedroms.moulded Modular Plastic Switches & Protective Mcb,S.concealed Lights As /Design |
| Conducting And Wiring Details | All Electrical Wiring In Concealed Conduits.provision For Adaquate Light & Power Points, Telephone, T.v Outlet In Drawing Dining And All Bedroms.moulded Modular Plastic Switches & Protective Mcb,S.concealed Lights As /Design |
| Water Storage | Overhead Water Tanks For Uninterrupted Supply Of Water. |
| Lift Details | Only Provision Of Lift Well |
| Windows/Glazings | "Window Panels Of Seasoned Hardwood/Aluminium/ Upvc Sections. |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.